3 simple building materials sales contract
Engineering building materials are an important part of building management in China, and also an important part of building management. What about the purchase and sale contract of building materials? The following is the sales contract I compiled, please refer to it.

Simple sales contract for building materials 1

Party A (Buyer):

Party B (supplier):

Project name:

Comprehensive construction engineering

In accordance with the Contract Law of People's Republic of China (PRC), Construction Law of People's Republic of China (PRC), Regulations on Quality Management of Construction Projects and other laws and regulations, and in order to clarify the rights, obligations and responsibilities of both parties in the construction process, the following contract is signed on the supply of construction steel by Party B to Party A through consultation:

I. Name, specification and quantity of materials to be supplied:

Material Name: Steel (four kinds): Pinggang, Nangang, Xingang and Egang.

Specification: equipped according to engineering requirements.

Quantity: purchase steel according to the progress of the project.

Price: It is calculated according to the wholesale market price of De 'an County, Yongxiu County and Qingxian County on that day, not the retail price. Party B shall not raise the price at will. Party B shall transport the package to the place designated by Party A on the construction site and be responsible for the transportation and unloading expenses.

Second, the supply location, time limit and requirements:

1. Place of supply: Wenzhou Youth Pioneer Park of Jiangxi Ding Yu Industrial Co., Ltd.

2. Party A shall notify Party B of the name, quantity, specification and date of use of the required materials three days in advance according to the progress of the project, and Party B shall send the materials to Party A's construction site in time after receiving the notice and confirming it, and the stacking place shall be designated by Party A's site (and ensure smooth roads).

Three. Settlement method and payment method:

1. Party B prepays100t steel. After delivery100t, each vehicle shall be paid after acceptance by Party A.. If the payment is not made two days after the arrival of the goods, 20 yuan fee will be charged for each ton, and so on. The balance will be paid in one lump sum after the project passes the owner's acceptance.

2. After Party B arrives, the Owner's supervisor and Party A's inspectors will conduct inspection and submit them for inspection. Party A can only weigh and accept after passing the inspection, and both parties shall bear half of the weighing expenses. If the product is unqualified, Party A may reject it, and all expenses arising therefrom shall be borne by Party B. ..

3, steel must be purchased from regular manufacturers, to provide product certification, quality inspection certificate and other documents to ensure product quality, (wire must be high-speed wire).

Fourth, the liability for breach of contract

1. If Party B fails to fulfill the terms of the contract, fails to deliver the goods on time, and the products do not meet the specification requirements, and it is necessary to cheat and fake and shoddy the products for more than two times, Party A has the right to terminate the supply contract with Party B without paying any compensation fees.

2. If the quality problems of Party B's products affect the project quality, progress and safety of Party A, Party B shall bear all responsibilities and compensate all losses caused to Party A. ..

Verb (abbreviation for verb) Other matters

1. In case of any dispute or dispute during the execution of this contract, Party A and Party B shall settle it through negotiation. If negotiation fails, it may apply to the relevant departments where the project is located for arbitration, and bring a lawsuit to Qingcheng People's Court.

2. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy, which shall come into effect as of the date of signature by both parties.

Party A (seal): Party B (seal):

Authorized Agent (signature): Authorized Agent (signature):

Tel: Tel:

Signature time: Signature time:

Simple sales contract for building materials II

Article 1 Commodity name

Product name, origin, brand, specification, model, color, material, quantity, unit price and total price.

Article 2 Quality standards:

Article 3 Delivery and Installation:

Delivery method: (delivery/delivery installation/buyer's delivery); Delivery time: _ _ _ _ _ _ _; Delivery place: _ _ _ _ _ _ _ _; If delivery installation mode is selected, the buyer shall provide installation conditions to the seller, and the installation standard and method are _ _ _ _ _ _ _ _.

Article 4 Acceptance and Three Guarantees Responsibility:

If the specifications, colors and brands of sanitary ware are inconsistent with the agreement and have surface defects, the buyer will raise an objection on the spot (delivery/installation), and the seller will unconditionally replenish or exchange the goods after verification; If there are inherent quality problems, the warranty period is _ _ _ _ _ _ _ years, and the seller is responsible for free maintenance; However, if it fails to meet (agreed quality standards/national standards and industry standards) after inspection by professional testing institutions, the buyer has the right to ask the seller to exchange or return the goods unconditionally within two years from the date of delivery.

Article 5 Payment Method and Time: Both parties agree to pay the price by _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(1) When signing this contract, the Buyer shall pay (deposit/advance payment) RMB _ _ _ _ _ _ (the deposit shall not exceed 20% of the total price), and the balance shall be paid in one lump sum after delivery and acceptance;

Article 6 Liability for breach of contract:

(1) If one party delays delivery or delivery, it shall pay _ _ _ _ _ _ _ _% of the delayed part price to the other party as liquidated damages every day;

(2) If the seller's delivery is overdue for more than _ _ _ _ _ _ days, the buyer shall have the right to terminate the contract in addition to paying the liquidated damages according to the provisions of the preceding paragraph, and all the advance payment or price collected by the seller shall be returned; The buyer can ask the seller to double the deposit paid, without charging liquidated damages;

(3) If the buyer unilaterally terminates the contract without justifiable reasons, it shall compensate the seller for the losses suffered as a result, and the paid deposit has no right to demand the return.

Article 7 Where a seller withdraws from a fair or market, the organizer of the fair or market shall be liable for compensation in advance; After assuming the responsibility, the organizer has the right to recover from the seller.

Article 8 Dispute settlement methods:

Disputes arising under this contract shall be settled by both parties through consultation, or apply to the market organizer or consumer association for mediation, or appeal to the administrative organ; If negotiation, mediation or appeal cannot be settled, a lawsuit shall be brought to the people's court of _ _ _ _ _, or arbitration shall be applied according to the arbitration clause or arbitration agreement reached separately.

Article 9 Other agreed matters: _ _ _ _ _ _.

Article 10 Both parties may modify or supplement this contract in written form, but if the modification or supplement lightens the responsibilities of the seller, this contract shall prevail.

Buyer (seal): _ _ _ _ Seller (seal): _ _ _ _ _ _

Authorized agent (signature): _ _ _ _ _ Authorized agent (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ Signing place: _ _ _ _ _ _

Simple sales contract for building materials 3

Party A (Buyer):

Party B (Seller):

According to the Contract Law of People's Republic of China (PRC) and relevant regulations, Party A and Party B reach an agreement on the purchase of building turnover materials by Party B and sign this contract. 1. Procurement content: all the existing building turnover materials of Chen Bao Leasing Station (see the attached table for details), and the right to use the stacking workshop and office building for 3 years.

2. Purchase price: (1) shelf pipe yuan/meter, total meter, total yuan; 2 fastener yuan/piece, in total;

(1) and (2) Total price:

3. Payment method: Within 5 days after the signing of the contract, Party A shall pay the down payment of RMB (in words:) and the balance of RMB (in words:) to Party B by transfer, and Party B agrees that Party A shall pay interest-free before.

Four. Disposal of enterprise losses, creditor's rights and debts before acquisition: All losses shall be borne by Party B, and have nothing to do with Party A. ..

Verb (abbreviation for verb) Rights and obligations of both parties.

(1) Party A:

1, the stacking area and office space shall not destroy the original appearance and use nature of the building;

(2) Party B:

1. Promise that the building turnover materials meet the national standards for the use of building turnover materials, and ensure that the ownership of the seller is free from other ownership disputes;

2. Ensure that Party A can use the stacking area and office space for 3 years free of charge as agreed in the sales contract, and provide written proof materials of relevant property owners;

6. Breach of contract:

1. If Party B fails to provide the building turnover materials, yard stacking and office workshop contracted by the contractor within the contract period, thus causing economic losses to Party A, Party B shall pay the economic losses caused to Party A by double indemnity, and return the deposit paid by Party A in full, and this contract will be automatically terminated.

2. During the contract period, if Party A's breach of contract causes economic losses to Party B, Party A shall bear double indemnity to Party B. ..

Seven. Other matters agreed by both parties:

Eight. For matters not covered in this contract, the supplementary contract signed by both parties through consultation has the same legal effect as this contract. If negotiation fails, the case shall be submitted to arbitration or brought to the local people's court.

Nine. This contract is made in duplicate, one for each party, with the same legal effect.

Party A (seal): Party B (seal):

Legal representative:

Year, month, sun, moon, sun.

Three articles related to simple sales contracts for building materials;

★ Model of Simple Sales Contract for Building Materials

★ Simple sales contract template for building materials

★ Simple sales contract template for building materials (2)

★ Simple purchase and sale agreement for building materials

★ 3 samples of building materials procurement contract.

★ Simple Purchase and Sale Agreement for Building Materials (2)

★ Collect 3 simple plate sales contracts.

★ Purchase Contract for Building Materials (2)

★ Model building materials procurement contract

★ Sample of building materials supply contract