What does the supervisor sign on the sub-project quality acceptance record?
Sub-project quality acceptance record, supervision unit acceptance conclusion,No. 1, 2,3? After the acceptance conclusion of the supervision unit, the professional engineer of the supervision unit shall conduct a review item by item, and fill in "qualified or meeting the requirements" for the agreed project.

Disagreement items will not be filled in temporarily, and will be accepted after processing, but they should be marked. Opinions indicating acceptance and rejection. If you agree to the acceptance and sign for confirmation, if you don't agree to the acceptance, please point out the existing problems and clarify the treatment opinions and completion time.

If all items are qualified, in the last column, the acceptance conclusion of the supervision unit: agree to the acceptance and sign (signed by professional engineers) to confirm the completion of the year, month and day.

The table in Appendix F is used for quality acceptance records of subdivisional work. Sub-projects are carried out on the basis of the quality acceptance records of the inspection lot, which usually plays the role of induction and sorting. They are statistical tables and have no substantive acceptance contents. Just pay attention to three points.

One is to check whether the inspection lot covers the whole subdivisional work and whether there are any missing items;

The second is to check whether the inspection lot with concrete and mortar strength requirements can meet the specification requirements after the age (fill in the description column);

The third is to unify the inspection lot data and register them in turn for easy management.

Extended data:

The basis for completion acceptance can be summarized as follows:

(1) Various documents approved by the superior for the project;

(two) the feasibility study report, preliminary design documents and approval documents;

(3) Construction drawing design documents and design change negotiation records;

(4) Various standards promulgated by the state and current construction quality acceptance specifications;

(5) Project contract documents;

(6) technical equipment specifications;

(7) Other provisions on project completion acceptance;

(eight) projects that introduce new technologies and complete sets of equipment from abroad, as well as Sino-foreign joint venture construction projects, shall be checked and accepted according to the signed contracts and design documents provided by the importing countries;

(9) For construction projects that use loans from international financial institutions such as the World Bank, a project completion report shall be prepared on time in accordance with the provisions of the World Bank.