Also known as the factory inspection report, it is the supplier's proof of the quality of this batch of materials, which is usually delivered with the goods, and there is also an electronic version of the factory inspection report.
Basic requirements of COA file
Include the name of the manufacturer.
The certificate date is within 8 months of the application submission date.
Include supplier signature.
Batch number and production date must be included.