General version of factory lease contract
General version of factory lease contract. If you want to obtain the right to use the factory, you need to sign a factory lease contract, which is legally binding during the lease period. , before signing the contract, you must understand the contract to avoid being cheated. Below I have compiled a general version of the factory lease contract. Factory Lease Contract General Version 1
Lessor (Party A)
Address: Telephone:
Lessee (Party B) < /p>
Address: Telephone:
According to relevant regulations, Party A and Party B voluntarily enter into the following agreement through friendly consultations:
1. Party A will transfer Dongguan City to the The factory dormitory in Daping Village, Xia Town is leased to Party B for use, with an area of ??approximately ____ square meters.
2. Party B will rent the factory for three years, that is, from ____ month __ to ____ month __. The first 30 days are the decoration period, during which Party A is exempt from rent. The official rental start time is ____year___month__day.
3. The monthly rent for factories and dormitories*** is calculated as RMB 9,000 yuan (¥____________ yuan)
4. When Party A and Party B sign the contract, Party B shall pay Party A The security deposit is RMB________ yuan and the first month’s rent is RMB________ yuan. After Party B has paid off the rent and all expenses at the end of the contract, Party A shall return the security deposit to Party B in full without interest.
5. Party B shall pay the rent to Party A before the 10th of each month.
6. Party A will lease the factory building to Party B for production purposes. If Party B uses it for other purposes, Party A must obtain written consent and go through the procedures for changing the use of the house in accordance with relevant laws and regulations.
7. Party A provides Party B with electricity and water. Electricity fees are charged according to the power supply company's standards. Water fees are charged according to water company standards.
8. Party B shall maintain the original appearance of the factory buildings and dormitories, and shall not demolish or modify buildings, facilities, or equipment at will. If Party B needs to renovate or repair the building, it must obtain Party A's consent before it can be implemented.
9. During the contract period, Party B must operate and manage in accordance with the law, and be responsible for safety, fire prevention, and theft prevention in the rented factory and public areas. If any illegal behavior occurs, Party B will be responsible. Party B shall use the property properly in accordance with national policies and laws, and pay industry and commerce, tax and other state-stipulated fees as required.
10. During the validity period of this contract, if the country or Party A and Party B have new plans, both parties shall cooperate with the implementation of the new plans. Party A must notify Party B three months in advance, and both parties shall negotiate solve.
11. During the validity period of this contract, if either party breaches the contract, the other party shall have the right to terminate this contract. The breaching party shall be responsible for compensation for any economic losses caused thereby.
12. If natural disasters, force majeure or accidents occur, making it impossible to perform this contract, this contract will be automatically terminated.
13. After the expiration of this contract, if Party B needs to continue renting, it should make a request for renewal three months before the expiration of the validity period. Under the same conditions, Party B has the priority to rent.
14. Matters not covered in this contract shall be resolved through negotiation between Party A and Party B.
15. This contract is made in two copies, with Party A and Party B each holding one copy, which have the same legal effect. It will take effect from the date it is signed by representatives of Party A and Party B.
Party A (signature and seal) Signature of the representative:
Party B (signature and seal) Signature of the representative:
Time of signing the contract: Year, month and day. Common to factory lease contracts. Version 2
Lessor (Party A):
Legal representative:
Lessee (Party B):
Legal representative:
ID card number or industrial and commercial business license number:
According to relevant national regulations, Party A and Party B enter into an agreement on the basis of voluntariness, equality and mutual benefit. Regarding matters related to Party A leasing its legally owned factory to Party B, the two parties have reached an agreement and signed a lease contract as follows:
1. Leasing of the factory
Party A will be located in The factory is leased to Party B for business use (business items must be detailed), and the leased building area is square meters. The factory building type is structure.
2. Lease term
The lease term is years, that is, starting from the month day of the year and ending on the month day of the year
3. Delivery time
From the effective date of this lease contract, Party A will deliver the factory to Party B for use in its current condition, and Party B agrees to rent the factory and facilities in their current condition.
IV. Security deposit and rent
1. Security deposit.
Once Party A and Party B sign the contract, Party B shall pay Party A a factory rental deposit of RMB yuan (in capital letters: ). The deposit is deposited with Party A without interest. If Party B does not continue the lease after the expiration of the lease, Party A shall inspect the factory buildings and public supporting facilities for no damage and pay all fees (water and electricity bills, property tax, land tax and other relevant departments shall collect fees, etc.), Party A will return the deposit to Party B without interest. If Party B causes damage to Party A's factory buildings and public supporting facilities, Party B will be responsible for repairs. If it cannot be repaired, Party B will compensate according to the price. This part of the cost will be deducted from the deposit, and the remaining amount will be returned by Party A to Party B. If the deposit is insufficient to cover the compensation costs, the excess shall be paid by Party B to Party A.
2. Rent calculation.
Party A and Party B agreed that the monthly rent per square meter of construction area in the first year of leasing the factory shall be RMB yuan (in capital letters: ). The total monthly rent is RMB (uppercase: ), and the total annual rent is RMB (uppercase: ). From the second year onwards, the rent will increase by % each year based on the previous year (it is recommended that the annual increase should not be less than 3%, or it should be increased every three years, and each increase should not be less than 10%). See the following table for details of the annual rent:
Party B must pay the monthly rent before the first day of each month. Party A will issue a receipt from the village when collecting the rent. If the rent is delayed and the rent is not paid, Party A must pay a late fee of % of the rent owed for each overdue day. After Party A calls for payment, if Party B still fails to pay the rent in full by the end of the month, Party B will be deemed to have unilaterally breached the contract.
3. Rent payment.
V. Maintenance
1. Party B shall have the right to use the factory and ancillary facilities during the lease period. Party B shall be responsible for the maintenance and upkeep of the factory and ancillary facilities, and ensure that the ancillary facilities are returned to Party A along with the factory in reliable operating condition when this contract is terminated. Party A has the right to inspect and supervise this.
2. Party B is responsible for the proper use and maintenance of the factory attachments, and should eliminate all possible faults and dangers in a timely manner to avoid all possible hidden dangers.
3. During the lease period, Party B must ensure the safety of Party A’s property and purchase property insurance. Party B is responsible for the safety of the factory. Party B shall take good care of the factory during the lease period. If the factory is damaged due to Party B's use and cannot be repaired, Party B shall compensate Party A for the cost of the factory (excluding natural damage and force majeure natural disasters).
VI. Environmental protection, fire protection and production safety
1. The industries operated by Party B’s leased property must comply with national industrial policies and must not engage in industries restricted by the state or discouraged by the local town government.
2. The industries operated by Party B’s leased property must comply with environmental impact assessment requirements. During production, pollutants must strictly comply with environmental protection requirements and meet national emission standards.
3. Party B must strictly abide by the relevant fire protection and production safety systems during the lease period, be responsible for fire prevention and production safety in the factory, and actively perform fire protection and production safety work. Otherwise, all responsibilities and losses arising therefrom shall be borne by Party B.
4. Party A has the right to inspect the fire safety of the factory, and Party B shall not refuse unreasonably.
VII. Property Management
1. When the lease expires or the contract is terminated early, Party B shall clean up and relocate the factory on the date of expiry of the lease or the date of early termination. , and return the factory to Party A. If Party B does not clean up the debris when returning the factory building, Party A will be responsible for the expenses incurred by Party A in cleaning up the debris.
2. When using the factory, Party B must abide by the laws and regulations of the People's Republic of China and Party A's relevant regulations on factory property management. If there is any violation, Party B shall bear corresponding responsibilities. If Party B violates the above regulations and affects the normal operation of other users around the building, Party B shall compensate for the losses caused.
8. Decoration Terms
1. Party A shall provide water and electricity facilities to the door of the factory (i.e. table) according to the current factory structure and existing intact facilities (including existing electricity load). (front), and all facilities behind the meter (including all water and electricity lines inside and outside the factory, etc.) will be constructed at Party B's own expense and will be owned by Party A free of charge upon expiration of the lease. During the lease period, if Party B needs to decorate or reconstruct the factory, it must submit a decoration or reconstruction design plan to Party A in advance, obtain Party A's written consent, and report to the relevant government departments at the same time. If the decoration or reconstruction plan may have an impact on the factory structure, public parts and other adjacent users, Party A may raise objections to this part of the plan, and Party B shall make modifications. The cost of alteration and decoration shall be borne by Party B.
2. The property rights of fixed attachments added during decoration and reconstruction belong to Party A, and Party B has no right to require Party A to subsidize them.
9. Relevant taxes and operating responsibilities
1. During the lease period, all taxes and fees incurred by Party B when renting the factory, including: water and electricity bills, telephone bills, environmental sanitation fees, and public security Party B is responsible for all government department charges such as fees, rental taxes and other industrial and commercial taxes, as well as various other social apportionments.
2. Party B must operate in compliance with the law. All claims, debts, legal, economic, safety, labor disputes and all unforeseen events that occur during the operation period are the responsibility of Party B and have nothing to do with Party A.
10. Contract cancellation and contract termination
1. Party B shall not terminate this contract in advance without the written consent of Party A. If Party B really needs to terminate the contract in advance, it must notify Party A in writing 2 months in advance and complete the following procedures before terminating the contract in advance:
(1) Return the factory to Party A;
< p>(2) Pay the rent during the lease period and other expenses incurred due to this contract;(3) Party B’s lease security deposit shall belong to Party A free of charge.
2. If this contract is terminated early or expires, and both parties fail to reach a lease renewal agreement, Party B shall move and return the factory to Party A on the date of termination or before the expiration of the lease period. All water, electricity, fire-fighting fixed facilities and all fixed decorations installed by Party B in Party A's factory shall belong to Party A free of charge. Party B shall not dismantle them and Party A shall not make any compensation.
3. If Party B needs to continue the lease when the lease expires, Party B shall submit a written request to Party A three months before the expiration of the lease, and then sign a new lease contract with Party A's consent.
11. Disclaimer
1. If Party A’s factory is damaged or Party B loses due to natural disasters or other force majeure, both parties will not be held liable for each other.
2. During the lease period, the requisition of factories due to government urban planning and construction development does not constitute a breach of contract by Party A. Party A will not make any compensation to Party B. The compensation issue will be handled in accordance with relevant government regulations.
3. This contract is signed by Party A and Party B on the basis of complying with the current relevant national policies, laws and regulations. If it conflicts with new national policies, laws and regulations during the lease period, causing this contract to have to be terminated, both parties will not hold each other accountable for breach of contract.
12. If Party B has any of the following circumstances, it will be deemed as a unilateral breach of contract by Party B:
1. Sublet or sublease the leased factory without Party A’s written consent.
2. Changing the purpose of the factory without Party A’s written consent.
3. The rent has not been paid for more than three days overdue.
4. Party B stops renting midway.
13. Liability for breach of contract
1. If Party A breaches the contract, double the deposit will be returned to Party B, and part of the rent paid by Party B since the date of breach will be refunded, and this contract will be terminated. .
2. If Party B breaches the contract, Party A has the right to unilaterally terminate this contract, take back the factory, confiscate the deposit, and the rent paid by Party B will not be refunded. At the same time, Party A has the right to dispose of the factory, and Party B also voluntarily and agrees to Party A's disposal method. If Party B fails to pay the relevant fees for leasing the factory, Party A has the right to lien the property in Party B's factory and apply for auction. The retained property will be used to offset all the expenses incurred by Party B due to the leasing.
14. Dispute Resolution
If a dispute arises during the performance of this contract, both parties shall first negotiate and resolve it on the basis of the principle of equality and mutual benefit. If the negotiation fails, either party may submit a request to Zhongshan City The people's court brings a lawsuit and resolves the matter through litigation.
15. Other Terms
1. For matters not covered in this contract, a supplementary agreement can be signed separately after both parties reach consensus through negotiation.
2. This contract is made in duplicate, Party A has one copy, and Party B has one copy. Each copy has the same legal effect.
3. This contract will come into effect after being signed and sealed by both parties and receiving the rental deposit payment from Party B.
Party A: (Seal) Party B: (Seal)
Signature of the legal representative of Party A: Signature of the legal representative of Party B:
Date of signing: ____ year ____Month_____ General Version 3 of Factory Lease Contract
Lessor: (hereinafter referred to as Party A)
Lessee: (hereinafter referred to as Party A) Party B)
In accordance with the "Contract Law of the People's Republic of China" and relevant legal provisions, in order to clarify the rights and obligations of Party A and Party B, this contract was signed through equal negotiation between both parties.
1. Party A will lease the use rights of acres of land located at the city road number and the buildings, structures, attachments, etc. on the ground to Party B for use.
2. Party B must conduct legal operations when renting the land, otherwise Party A has the right to take back the land use rights and terminate the contract.
3. Party B shall not sublease the land use rights without authorization. If sublease is required, Party A shall obtain written consent. Otherwise, Party A shall have the right to take back the land use rights and terminate the contract.
4. Party A should ensure that the basic facilities such as water, electricity, and heating on the land are complete, and help Party B coordinate related matters with the providers of water, electricity, and heating. However, the specific charging matters shall be determined by Party B negotiates with the provider of water, electricity and heating, and all costs will be borne by Party B.
5. During the lease period, Party B shall not arbitrarily change the condition of the land and the buildings, structures, attachments and water, electricity, heating pipe networks and other facilities on the land. If it is really necessary to change or expand the equipment It shall be implemented with the written consent of Party A in advance. If relevant procedures are required when modifying relevant facilities or expanding equipment, Party B shall handle them. Party A shall provide assistance according to the actual situation, and Party B shall bear the required expenses. Otherwise, Party B shall The original condition shall be restored and Party A shall be compensated for the losses caused thereby.
6. During the lease period, Party B shall bear the costs related to city appearance and environmental sanitation, three guarantees in front of the door, etc. State administrative fees shall be borne by Party A and Party B respectively according to relevant regulations.
7. Party B shall be responsible for all accidents that occur due to production and operation during the lease period and cause damage to others, and have nothing to do with Party A.
8. Within 10 days after the lease period stipulated in the contract expires or the contract is terminated by consensus between both parties, Party B shall handle the handover procedures with Party A. During the handover, Party B shall ensure that the staff evacuate and vacate its own equipment. Clean up and clean up the garbage and debris within the rental area.
9. The lease term is years, from year month day to year month day.
10. As agreed by Party A and Party B, the rent will be paid on an annual basis, with the rent paid in advance and used later. The annual rent is RMB, and Party B will pay it to Party A on the first day of each year. If the rent is overdue for less than 30 days, Party B shall not only make up for the rent owed, but also pay Party A a penalty of two thousandths of the annual rent. If the rent is overdue for more than 30 days, Party A has the right to terminate the contract, and Party B shall The party shall pay a penalty of 25% of the annual rent.
11. Party A charges Party B fees other than the agreed rent, and Party B has the right to refuse to pay.
12. During the lease period, if both parties terminate the contract due to force majeure or urban planning and construction, both parties will not be liable to each other for the resulting economic losses.
13. Dispute resolution methods:
14. Both parties may sign a supplementary agreement upon consensus, and the supplementary agreement shall have the same legal effect as this contract.
15. This contract will take effect after being signed and sealed by both parties.
16. This contract is made in four copies, with each party holding two copies, which have the same legal effect.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________year____month____day_______year____month____day