Construction unit start-up application report
Construction unit start-up application report

How to write the application report of the construction unit? The following are two application reports for the commencement of the construction unit that I carefully edited for you. Welcome to read!

Application Report of Construction Unit for Commencement 1 copy

To the project supervision unit:

In view of the fact that the construction organization design of the unit project declared in this application has been completed, the construction equipment has been basically mobilized to enter the site, the personnel and construction organization have been in place, and the conditions for commencement have been met. Apply for the commencement of the project of this unit, so as to make good preparations for the construction and urge the first batch of divisional (sub-divisional) projects to start as soon as possible.

Project manager:

Contractor:

Date of application: year month day

Report on Construction Unit's Application for Commencement II

Xxx development office:

The project (bid section) undertaken by our unit, construction machinery and other equipment have entered the site, the project department has been established, construction management personnel and workers have been in place, and the conditions for commencement have been met. Now we apply for the graduation ceremony and look forward to your approval.

Xxxx engineering co., ltd

Month, day, 20 years

Extended reading

What are the contents of the unit project commencement application report?

1. All contents in the application report for commencement shall be true, complete and accurate.

2. For the division (sub-division) project contracted by the construction unit, the commencement report shall be filled out separately.

3. The unit engineering construction must meet the conditions:

(1) Construction organization design or construction scheme approval;

(2) the construction drawings after came;

(3) the scene? Three links and one leveling? And temporary facilities to meet the construction requirements;

(4) The main materials and construction machinery and equipment have been implemented;

(5) Construction permit has been obtained;

(6) The engineering baseline and elevation have been rechecked.

4. The commencement report shall be valid only after it is signed and sealed by the construction, supervision and construction unit.

;