The preparer, reviewer, and technical person in charge in the completion stamp should be the signatures of relevant personnel of the project team of the construction unit. The preparer is the data clerk or construction worker, and the reviewer is the project construction engineer (project manager). The technical leader is the project engineer. Enter the date of completion acceptance (comprehensive acceptance).
The design change notice is the basis for the modification of a certain drawing after the change and modification. It has the same effect as the drawing and should be attached to the changed and modified drawing (as-built drawing) on ??the page.
The order of the as-built drawings should be the same as the order of the original design drawings.