2021 Emergency Plan for Flood Control Safety (6 general articles)
In daily study, work and life, we sometimes encounter unforeseen emergencies. In order to make timely decisions To respond to emergencies and reduce the consequences of accidents, it is often necessary to formulate emergency plans in advance. How should an emergency plan be prepared? Below is the emergency plan for flood prevention and safety in 2021 that I have collected (6 general articles). I hope it can help everyone.
Emergency plan for flood control safety 1
Purpose: In order to ensure the normal life and work order of the business owners and the safety of life and property, ensure the normal operation of each equipment, and ensure that each building and facilities and equipment for safe flood prevention in summer
Scope of application: projects under the company's jurisdiction
Supervision and execution: project manager (the manager on duty during the second working time)
Responsibilities : The project property department, engineering technology department, and safety prevention department are responsible for supervision and implementation
Flood prevention emergency procedures:
1. Flood prevention organization procedures
1. During the flood season Before arriving, a flood prevention team was established, with the project department manager as the team leader, the engineering department director as the deputy team leader, and the team members being the security department director, the property department director and the duty manager;
2. When danger occurs, The manager of the project department is responsible for the deployment of material and human resources, the director of the engineering department is responsible for on-site command, and the manager of the customer service center and the security department manager are responsible for allocating personnel from the department to cooperate in emergency rescue. When danger occurs at night or on weekends, the duty manager is temporarily responsible for command and promptly notifies other members of the flood control team to rush to the scene.
2. Flood prevention measures of the Engineering Department during the flood season
1. Set up a special storage warehouse for flood prevention equipment to store flood prevention equipment. It should mainly include several submersible pumps, drainage hoses, and waterproof distribution boxes. , woven bags, sand, shovels, etc.;
2. One key to the flood control equipment warehouse should be stored in the Security Department, Engineering Technology Department, and Project Department;
3. The arrival of the flood season Before that, maintenance personnel and security patrol personnel from the engineering department should carefully inspect
(1) Whether the drainage ditch on the roof platform is unobstructed, and at the same time remove the garbage on the roof;
(2) ) Check whether the sewage pump in the underground sump pit is sensitive and effective, and put the control in the "automatic" position;
(3) Check whether there is accumulation in rainwater wells, sewage wells, and rainwater pipes inside and outside the building, and Remove them to ensure smooth drainage;
(4) Check whether there is any leakage in important machine rooms such as the power distribution room and central control room. If it occurs, it should be dealt with in time.
3. Danger handling procedures
1. If rainwater pours into the underground machine room, engineering department personnel should promptly start the sewage pump to drain water, and use sandbags to block the machine room door to protect various important equipment . At night and on weekends, the duty manager on the one hand organizes personnel to carry out rescue operations, and on the other hand immediately notifies the project manager and other members of the flood control team;
2. The security personnel are commanded by the security department manager. Some personnel maintain order, and some Personnel assist the Engineering Department in eliminating dangers and providing rescue equipment;
3. Personnel from the Property Department clear water accumulation everywhere;
4. After danger occurs, a comprehensive inspection must be carried out to collect statistics on the flood situation The losses and material consumption caused, and timely replenishment of flood prevention materials to prepare for the next flood prevention;
5. The incident handling process must be recorded in detail, and the project manager shall report to the company leaders. Emergency Plan for Flood Control Safety 2
With the arrival of the rainy season, according to the Liuyang Municipal Safety Supervision and Administration Bureau’s notice on the current safety work of non-coal mining enterprises, flood and flood prevention work is imminent. In order to survive the flood safely, our mine has formulated an emergency plan for flood prevention and flood prevention, established a flood prevention and flood prevention leading group, and equipped it with sufficient materials, equipment and other flood and flood prevention supplies to ensure that the mine safely and smoothly passes through the flood season.
The emergency plan is as follows:
1. Emergency principles:
Our mine adheres to the principle of focusing on prevention, combining prevention with robbery, unified command, unified dispatch, obeying the overall situation, and carrying forward the principle of unity to fight floods spirit, under the unified guidance of the Mine Flood Control Leading Group, actively cooperate and unite to ensure that the mines survive the floods safely.
2. Work plan:
Develop a flood prevention and flood prevention safety management system, ensure that all members have flood prevention awareness, and implement the system to all teams and personnel. Timely conduct education on safe flood preparedness and safety responsibility education on flood prevention and control. Regularly check the readiness of flood control materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen logistics support and service work to ensure the safety of personnel, materials, equipment and on-site work.
3. Establish a frontline flood control headquarters and clarify responsibilities:
Commander-in-Chief: xxx
Deputy Commander-in-Chief: xxx
Members : xxxxxxxx
Commander-in-Chief: Responsible for overall mine-wide flood control and unified command of flood control work.
Deputy Commander-in-Chief: Responsible for implementing the preemptive plan and mobilizing flood-fighting personnel and necessary supplies. Prepare emergency equipment in a timely manner, quickly travel to the designated location according to the commander-in-chief's orders, and be responsible for the food, accommodation and other matters of the disaster relief personnel.
Members: Carry out the instructions of the commander-in-chief and be responsible for the supply and reserve of flood control materials, the deployment and transportation of equipment, and all matters related to rescue work. Medical team: composed of staff from Nanyue Village Health Center, responsible for treating those injured during the rescue process.
4. Emergency plan:
(1) Establish a frontline flood control headquarters with the mine director as the command, divide the responsibilities, clarify the responsibilities, ensure that the responsibilities are assigned to the people, strengthen the dispatch, Ensure that all actions are directed and all actions are subject to command. When the flood season comes, assign dedicated personnel to be on-site and set up a flood prevention and rescue team.
(2) Make a material supply plan and arrange the preparation of flood control materials. Before the flood season comes, prepare enough woven bags, sand, water pumps, shovels, raincoats and other flood control materials.
(3) The loaders and generators deployed at the rescue site should be maintained and repaired to ensure that the equipment can operate normally when the flood season comes and that the equipment can fully play its emergency role during special periods.
(4) Materials and equipment on the ground that are threatened by floods will be arranged by the mine commander and moved to high safety areas as much as possible.
(5) The commander-in-chief should organize flood control teams to clear flood drainage channels as much as possible according to changes in water levels, so as to minimize property losses in the mine.
(6) The custody team, headed by Xie Xiyuan, must distribute the tools, materials and supplies needed for flood fighting and rescue work in accordance with the requirements and instructions of the headquarters to ensure that the flood fighting and rescue work can proceed smoothly.
(7) The medical team is headed by medical staff from Nanyue Village Health Center. During the rescue period, medical staff must go to the scene in person to provide timely treatment to those injured during the rescue process. Those who are seriously injured must be sent to the hospital for treatment in a timely manner.
(8) Xie Haibo is in charge of the car team. During the rescue period, enough cars must be prepared to transport the injured and medical staff.
(9) The communication team is headed by Xiong Shanbao. After the accident, he is responsible for convening flood rescue personnel and contacting relevant superior units, and reporting the relevant spirit and instructions of superiors to the commander-in-chief in a timely manner.
(10) If the accident is too large and the unit cannot handle it, the mine rescue team should be notified immediately to request rescue.
5. Preparation quantities and storage locations of emergency equipment and materials:
Emergency plan for flood control safety in the factory storage room 3
1. Flood control situation and main issues Mission
Rebuild after being damaged by floods. The reservoir area (hereinafter referred to as the reservoir area) was first built in 2001. The reservoir area is mainly responsible for the water needs of nearly 3,000 hectares of paddy fields in Datun Town and fish farming in state-owned fisheries.
Because the embankment project is not perfect, emergency rescue operations must be carried out every year. Especially this year, due to the adoption of flood storage and water diversion measures, the water level in the reservoir area is relatively high. The current water level in the reservoir area has reached 132.45 meters. In addition, the Prison Town Lai Branch will still have 10 million square meters. Paddy fields are releasing water into the reservoir area. Due to strong winds and high waves in autumn, 4,420 meters of embankment are in danger, of which 2,100 meters are in serious danger.
In line with the principles of scientific decision-making and democratic decision-making, in order to ensure the safety of the reservoir area. The county government organized experts to conduct a demonstration on flood control in the reservoir area on March 1. According to the opinions of the expert group, it was determined that the general requirements for flood control emergency rescue in the reservoir area are to adhere to safety first, give priority to prevention, and make every effort to rescue. It is necessary to retain water and protect the embankment.
2. Specific arrangements for flood control work
(1) Establish a temporary flood control emergency rescue headquarters in the reservoir area to lead the organization. Based on the current actual situation in the reservoir area. The general commander is the deputy head of the county government, and the deputy commanders are the chief prosecutor of the Procuratorate, the director of the Water Conservancy Bureau, and the party secretary of the state-owned fishery. There are three working groups under the headquarters. The first is the rescue team, headed by the director of the state-owned fishery, who is mainly responsible for dispatching rescue manpower and materials, and organizing flood prevention and rescue operations. The second is the material team, headed by the party secretary of the state-owned fishery and the director of the Fisheries Bureau. It is mainly responsible for providing material support for emergency rescue. The third is the technical group, headed by the chief engineer of the Water Conservancy Bureau. It is mainly responsible for proposing plans for the emergency rescue in the reservoir area and guiding the rescue work throughout the process. This time the emergency rescue in the reservoir area is under the unified leadership of the headquarters, which will track, supervise and inspect the entire rescue work.
(2) The county and the fishery are jointly responsible for the funding. The emergency rescue in the reservoir area is expected to require 200,000 yuan. The county finance department will receive 100,000 yuan, and the fishery facilities will receive 100,000 yuan. Emergency rescue funds will be earmarked exclusively for the purpose, and will be uniformly dispatched, used and managed by the headquarters. Other needs such as woven bags, straw bales and other emergency supplies will be provided by the headquarters in a coordinated manner with relevant departments and towns.
(3) Focus on time and schedule. This time the emergency rescue in the reservoir area adopts a tough battle approach. Concentrate manpower and material resources to ensure that the danger is eliminated within ten days.
3. Several requirements
(1) Firm confidence. All localities and relevant departments must attach great importance to the emergency rescue work in the reservoir area and unify their thinking. It should be regarded as a central task at present to raise awareness and unify thinking. At present, we must do a good job in the ideological work of the majority of cadres and workers in the fisheries. It is necessary to strengthen positive publicity and guidance, educate cadres and officials to correctly view the current situation, overcome fear of difficulties and luck, and fully understand the scientificity, feasibility, and necessity of the county government's decision-making, thereby enhancing their confidence in emergency rescue work. and determination.
(2) Divide the troops and control the situation. This emergency rescue operation is under the unified leadership of the headquarters, with clear responsibilities. The technical team should come up with a rescue plan as soon as possible based on the current actual situation, and put forward clear requirements for what standards each hazardous work section should meet. The material team must prepare materials in advance according to the requirements of the technical team to ensure emergency needs. The rescue team must appoint rescue personnel as soon as possible, ensure the size of the team, reasonably allocate labor and arrange time, and improve efficiency. At the same time, the fishery must implement embankment patrol personnel and insist on patrolling the embankment 24 hours a day to ensure that timely measures can be taken in case of danger.
(3) Ensure safety. Flood prevention work has great responsibilities and must adhere to standards. All member units of the headquarters must understand and view this issue from the perspective of being responsible for the party and the cause, and the people's lives and property. They must strictly enforce work disciplines, adhere to engineering standards, and strictly operate procedures to ensure that no mistakes are made. At the same time, in view of the actual situation of stable traffic on the embankment and cold weather and cold water, various safety precautions and guarantee measures must be taken to ensure construction safety.
(4) Coordinated operations. This time, the emergency rescue work in the reservoir area was closely coordinated. A current priority for the county. All localities and relevant departments must have an overall view, establish a "game of chess" mentality, take the initiative, fulfill their responsibilities, and provide full support for emergency rescue work. Each working group of the headquarters should enter their roles as soon as possible, clarify their responsibilities, implement their tasks, and do a good job in coordinating their work and actively cooperating to ensure that the reservoir area can survive the flood safely.
Emergency plan for flood control safety 4
In order to prevent severe weather such as heavy rain and lightning, prevent possible flood disasters, and ensure the personal safety of teachers and students and campus property, this emergency plan is specially formulated based on the actual situation of schools in our town.
1. Establish a leading group for heavy rainfall and flood prevention
Team leader:
Team members:
2. Preparation work
p>
1. Before heavy rains, all primary and secondary schools should carefully check the condition of the school buildings to see if the roof is leaking and the walls are exposed to rain, clean sewer pipes, ditches and other drainage facilities, and repair any problems in a timely manner;
2. Educate teachers and students on safety knowledge about preventing heavy rain, lightning, and floods to prepare for rainy days;
3. Check the surrounding environment of the school to prevent accidents in the school caused by external reasons. Schools close to hillsides should pay close attention to the mountain conditions to prevent landslides and other disasters;
4. Check circuit equipment to prevent accidents caused by water;
5. There is a Jishui River Units with flood control tasks set up a flood control rescue commando team to implement personnel and responsibilities, and prepare sufficient sandbags, sand, shovels, raincoats, flashlights and other flood control equipment;
6. Inspect the Jiushui River where our central school is responsible for flood control 7. Each school determines the evacuation route and resettlement location in case of emergency, and organizes teachers and students to carry out self-rescue, mutual rescue, Escape drills.
3. Emergency measures
1. Pay attention to the weather forecast. In case of severe weather or entering the flood season, each school must be on duty 24 hours a day, and all personnel should keep communications open 24 hours a day so that they can be on duty in an emergency. All types of personnel can be deployed in a timely manner if the situation arises;
2. During heavy rain periods, school duty personnel and security personnel should frequently patrol throughout the school. Schools with boarding students should focus on inspecting student dormitories. If a danger is discovered, report it immediately to the supervisor on duty and the unit leader, and initiate emergency procedures;
3. In the event of strong thunder and lightning weather, lightning protection work must be done for school personnel and electrification and distance education equipment;
4. Once there is a danger in the school building, quickly organize the orderly evacuation of students and transfer them to safe areas. Teachers must first ensure the personal safety of students;
5. Timely communicate through campus radio, telephone, mobile phone and other media Use and communication tools to transmit information, report situations, and obtain support from all aspects to relevant departments and personnel;
6. Pay attention to the road conditions of students going to and from school. If the roads are damaged or there are safety hazards and students cannot go home, the school should take appropriate measures Place students and contact parents in a timely manner;
7. In accordance with the unified arrangements of the town government, organize personnel to complete the task of blocking the flood gates of the river embankments and preventing floods.
IV. Work Requirements
1. We must attach great importance to the ideological aspect, and in the spirit of being responsible for the cause of the party and the people, we must overcome paralysis, laxity, and carelessness, and conscientiously do a good job in all aspects. Preparation;
2. The work must be well implemented, the division of labor and responsibilities must be clear, and the material reserves must be in place;
3. The organization must be coordinated and effective to ensure the smooth flow of government orders. Emergency plan for flood control safety 5
1. Purpose
In order to protect the safety of employees, ensure the safety of life and property of engineering personnel during the rainy season and ensure normal construction at the construction site, To control losses to a minimum, formulate flood prevention emergency plans in accordance with the spirit of relevant national, provincial, municipal and county flood prevention documents.
2. Organizational Structure
Sichuan Aviation Construction Foxconn Employee Affordable Housing (Phase I) Fourth Bid Section Project Department Rainy Season Flood Control Emergency Leading Group:
Team leader: Liu Zhi
Deputy team leader: Yan Bing
Team members: Dong Lei, Yu Heng, Lin Xiaochun, Wang Lizhong, Wang Zhonghua
Sichuan Aviation Construction The Rainy Season Flood Control Emergency Rescue Leading Group of the Project Department of the Fourth Bid Section of the Foxconn Employee Affordable Housing (Phase I) Project Department is located in the project office.
Third-party rescue contact information:
Emergency telephone number 120, alarm telephone number 110, fire alarm telephone number 119
3. Basic principles
Flood prevention The work adheres to the policy of "safety first, constant preparation, prevention first, and all-out emergency rescue", actively formulates and implements flood prevention plans, strengthens drainage measures, scaffolding reinforcement, and management inspections of electrical equipment, strengthens the collection of weather forecasts, and ensures prevention and control. Suffer before it happens.
1), (Liu Zhi) is responsible for on-site guidance and coordination with various departments.
2), (Dong Lei), (Yu Heng), (Lin Xiaochun) are responsible for tracking and inspecting the construction and finished product protection of each working surface.
3), (Wang Lizhong) is responsible for the safety management of the construction site and does a good job in safety education for construction during the rainy summer.
4), (Yan Bing) is responsible for the reasonable stacking of on-site materials, protection from rain and moisture, the maintenance of various mechanical equipment, and the preparation of flood prevention equipment.
5), (Zhang Chengyi) is responsible for insulation inspection of temporary electricity, equipment and tools to prevent wire breakage, leakage, etc.
IV. Material preparation:
According to the specific conditions of the project department, prepare equipment and materials for flood prevention. Prepare water pumps, water pipes, tarpaulins, shovels, etc. Sufficient equipment for rain protection must be prepared, and the required equipment must be kept in good condition. Emergency plan for flood control safety 6
Due to the current land acquisition and resettlement restrictions, the China Railway No. 9 Bureau Group xx line xx project management department is unable to fully carry out construction. Here is a flood control emergency plan for the No. xx1 tunnel project we are constructing. Submitted to the leadership of the Infrastructure Center, the flood control emergency plan for the No. xx1 Tunnel Project is as follows;
1. Purpose
In order to respond to emergencies caused by this year’s special climate and heavy rains and floods, an orderly and efficient To handle the situation accordingly, minimize losses and maintain social stability, this plan is specially formulated.
2. Scope of application
This emergency plan is applicable to all employees of the China Railway No. 9 Bureau who are engaged in production of the xx1 tunnel project under construction in the xx section of the xx line. In the recent emergencies caused by special weather and heavy rains and floods, we will assume the responsibility of providing emergency help to others, the responsibility of emergency protection of corporate property, and the security protection of the existing lines of xx company. In the event of flooding in other places, assume the obligation to provide emergency help to people's property.
3. Organizational structure
The project department of the xx section of xx line xx has established a flood control emergency assistance leading group, and its office is located in the dispatching room of the project department of the xx section of xx line xx company , responsible for the flood control work of the entire pipeline section. The tunnel operation team has established a tunnel flood prevention emergency rescue leading group, which is responsible for the specific implementation of flood prevention work for all tunnel projects in the xx section of the xx line.
Tunnel Operation Team Flood Control Emergency Assistance Leading Group
Team Leader: xx
Deputy Team Leaders: xx, xx
First Group : xx, xx, xx, xx, xx, xx,
Mainly responsible for roadbeds, bridges, culverts, and tunnels that have not yet been constructed;
The second group: xx, xx, xx, xx , xx, xx, xx
Mainly responsible for Tunnel xx1;
4. Emergency plan
4.1 Adhere to the principle of "prevention first": all employees must establish Safety first, always maintain a high degree of vigilance. After entering the rainy season, designated personnel should insist on recording, listening and watching weather forecasts at all levels every day, especially disaster warnings, and take corresponding measures in a timely manner.
4.2 In the event of a sudden heavy rain or flood disaster, the following functional personnel will be activated immediately to fully devote themselves to disaster management.
4.2.1 The person in charge of each work site shall report the situation to superiors and relevant local departments as soon as possible, and be responsible for directing the evacuation of on-site personnel to high ground, rooftops and other places;
4.2 .2 The person in charge of on-site construction (foreman or foreman) is responsible for maintaining order, counting the number of employees, and preventing chaos.
4.2.3 Logistics personnel are responsible for providing simple medical treatment, ensuring on-site food hygiene, and storing necessary living and medical supplies.
4.2.4 The on-site technical person in charge is responsible for the storage and rescue of technical data, and is responsible for recording and taking photos of flood water levels and other disaster situations.
4.2.5 The communication liaison officer (temporarily appointed by the team leader) listens to the team leader’s instructions, reports the situation to the superior emergency center as soon as possible, and does a good job of communication inside and outside the site.
4.2.6 The on-site electrician will take the safest measures to cut off the main power supply as soon as possible.
5 On-site Disposal Countermeasures
5.1 Immediately organize the orderly evacuation of employees to a safe area, count the number of people in departments, and immediately report the disaster to the relevant departments.
5.2 On-site employees immediately rescue the injured, cut off the power supply, rescue national property, and minimize the loss of national property as much as possible.
5.3 The leading group organizes personnel to conduct a careful investigation of the property damage, record it, and write a written report to the construction company.
6. Emergency preparations and measures
6.1 Before construction, all employees engaged in production should be trained on flood prevention methods, so that employees on duty should be familiar with the flood prevention emergency plan, so as to ensure that every employee in the event of a flood Employees can take the most accurate emergency measures to reduce losses.
6.2 If necessary, relevant personnel should be organized to conduct drills to verify the effectiveness of emergency preparedness and plan implementation, and improve self-prevention and self-rescue capabilities in actual combat.
6.3 Clean and dredge the existing ditches, drainage and flood discharge channels within the construction area to ensure that there is no siltation, no blockage, no construction hazards, no obstruction of the river, and sufficient flood discharge capacity.
6.4 During the construction of the tunnel project, first of all, the prevention, interception and drainage facilities at the top of the tunnel door should be completed, and strive to enter the tunnel as soon as possible. After entering the tunnel, permanent and temporary protection of the sides and slopes shall be carried out. The earth and stone excavation of the open tunnel section shall be strictly carried out in accordance with the "Tunnel Engineering Open Tunnel Engineering Operation Instructions" to ensure the safety of tunnel entry construction.
6.5 The pyrotechnics warehouse must be equipped with lightning protection and grounding devices in accordance with regulations to avoid the use and transportation of pyrotechnics during thunderstorms.
6.6 The retaining wall protection of the waste dump site shall be implemented in advance according to the design requirements.
6.7 Proper waterproofing and drainage work for temporary projects. Pay special attention to the prevention and drainage work of temporary houses, sand and gravel yards and cement warehouses, steel bar stockpiling yards and processing yards, air compressor rooms, substations, pyrotechnics warehouses, and machinery parking lots to ensure the safety of personnel, machinery, and materials Overcome the floods. Temporary construction access roads have adequate prevention and drainage facilities to ensure smooth flow.
6.8 Carefully inspect and verify construction materials and equipment stored in low-lying areas, and move them to a safer location on higher ground in advance if necessary.
6.9 Construction machinery and personnel should strengthen lightning protection, anti-slip and anti-collapse measures during construction in the rainy season to ensure safe and orderly construction.
6.10 Carry out tunnel waterproofing and drainage work strictly in accordance with the "Tunnel Project Waterproofing and Drainage Work Instructions".
6.11 According to this emergency plan, prepare enough corresponding rescue equipment, equipment, and machinery to ensure the activation of this plan.
6.12 When encountering rescue tasks, you must obey the unified command and arrangements of the project department.
On 6.13, the flood control emergency assistance leading group of the tunnel operation team conducted a comprehensive special inspection of the tunnel project in this section. ;