Special rectification scheme for collapse prevention
Special rectification scheme for collapse prevention

Special rectification scheme for collapse prevention

I. Guiding ideology

Guided by Theory of Three Represents, we will follow the principles of rectification according to law, strengthening law enforcement, promoting in an all-round way, treating both the symptoms and root causes, and making unremitting efforts, and adhere to the safety production policy of safety first, prevention first and comprehensive management.

Second, the basis for remediation

The inspection shall be conducted in accordance with the Law on Work Safety, Regulations on the Administration of Work Safety in Construction Projects, Construction Safety Inspection Standard (JJ-), Several Provisions on Prevention of Falling Accidents in Construction Projects, and Several Provisions on Prevention of Collapse Accidents in Construction Projects (Jian Jian Jian [XX]No.) and other relevant laws, regulations, rules and standards.

Third, the overall goal

Through rectification, we will further implement the main responsibility of enterprise safety production, standardize the construction safety production behavior, improve the safety production situation on the construction site, improve the compilation and review of the special construction scheme for project fall prevention and collapse prevention, carry out construction in strict accordance with the scheme, improve the safety protection facilities and protection level on the construction site, reduce the illegal behavior of construction employees, resolutely eliminate the hidden dangers of accidents, and curb the occurrence of serious accidents and multiple accidents.

Fourth, organize and lead.

In order to ensure the smooth progress of the special rectification work and strengthen the target rectification effect, our bureau set up a leading group for the special rectification of anti-collapse and anti-collapse.

Team leader: Yang Ruiyong (Deputy Director)

Members: Xie (chief of construction engineering management section), Zhou Jiansheng (stationmaster of district construction engineering quality supervision station) and Chen Shunzhan (stationmaster of district construction engineering safety supervision station)

District construction engineering safety supervision station is responsible for the daily specific work. District construction engineering quality supervision station and district construction engineering safety supervision station are member units, and the supervisors of the two stations jointly form a supervision team.

Verb (abbreviation of verb) remedy scope

The scope of remediation includes scaffolding, vertical transportation equipment, all construction sites where the edge of the hole may fall from a height, and construction sites where the foundation pit (groove), slope, pile wall, formwork support system and temporary buildings (including construction enclosure) on the construction site may collapse. Dangerous sub-projects such as key projects, projects with low contract price, accident enterprise projects, unqualified projects in daily inspection, high-rise and super-high-rise building projects, deep foundation pits, manual digging piles, high formwork, and large steel structure installation belong to the key remediation scope.

Sixth, the main points of rectification

The focus of this special rectification is to prevent and control falling and collapse accidents in building construction; Compilation of special construction scheme and implementation of relevant safety technical measures; Construction safety protection facilities, equipment and the use of safety protection articles for construction personnel, etc.

Seven. Contents and requirements of repair

(1) Special rectification of falling accidents from high places

Should be equipped with enough and meet the standards according to the engineering situation, and put into use according to the specification requirements; The safety protection facilities of four-port, five-edge and unloading platforms should be standardized and instrumentalized, and the responsible person system should be implemented.

The preparation of the special construction plan for falling prevention should be scientific, targeted and operable, and should be approved and signed by relevant personnel. The construction site should be implemented in strict accordance with the specific requirements of the special plan, and a special emergency rescue plan should be formulated.

Special operations personnel should hold relevant certificates, and the construction unit should equip the operators with qualified safety protection articles such as safety helmets and safety belts, and the operators should wear and use them correctly according to regulations.

Before working at heights, the safety protection facilities shall be inspected and accepted. If it is necessary to temporarily remove or change the safety facilities, it should be approved and confirmed before implementation, and obvious warning signs should be set at relevant parts to explain the temporary removal or change of the safety facilities.

Scaffolding engineering and formwork engineering should be prepared according to the engineering situation and the relevant provisions of the special construction plan, set-up and demolition by professionals, with a dedicated channel, not climbing up and down the frame body or support system.

The scaffold board of the operation layer should be laid tightly, and the safety flat screen should be covered below; The inner side of the external upright post of the scaffold is fully enclosed with a dense mesh safety net that has passed the inspection, and no gap can be left. The dense mesh safety net should be reliably fixed on the frame; When the clearance between the scaffold board of the operation floor and the building is greater than cm, it should be completely closed to prevent people and materials from falling. ,

Special rectification scheme for anti-collapse

All kinds of operating platforms and unloading platforms should be erected according to the construction plan, the foundation should meet the bearing capacity requirements, the frame should remain stable, it is forbidden to connect with scaffolding, and the operating platform should not be overloaded.

In formwork engineering, when installing formwork, binding steel bar, pouring concrete and dismantling formwork, operators should be guaranteed to have a reliable foothold, and the operation surface should be provided with safety protection facilities according to regulations.

The construction load of formwork and its supporting system shall be uniformly stacked and shall not exceed the design and calculation requirements.

Purchase and lease of steel pipes and fasteners must check the production license, product quality certificate, production date, inspection certificate and product identification. Before use, it should be sent to the legal testing unit for testing, and steel pipes and fasteners with incomplete documents and unqualified testing should not be used.

Tower cranes, external elevators and tic-tac-toe frames shall be installed and dismantled by qualified units according to regulations.

(2) Special rectification of collapse accidents

The preparation of the special construction scheme for anti-collapse should be scientific, targeted and operable, and be approved and signed by relevant personnel, and strictly implemented in the construction site according to the specific requirements of the special scheme; And should formulate special emergency rescue plan.

Before foundation pit (groove), slope, foundation pile, formwork and temporary construction, the construction scheme shall be prepared according to the requirements of the design unit and the geological conditions, construction technology, operating conditions and surrounding environment. Deep foundation pit and ultra-high formwork engineering still need to organize scheme demonstration and review as required.

The construction unit shall plan the temporary drainage system in the construction area, and the temporary drainage shall not damage the foundation of adjacent buildings (structures) and dig and fill the slope. When excavating in areas with complex terrain and geological conditions where landslides and collapses may occur, the design unit shall determine the drainage scheme. When there is surface water confluence, drainage or underground water pipe leakage around the site, the construction unit should organize drainage and take protective measures for the foundation pit. When excavating foundation pits (troughs), slopes and foundation piles below the groundwater level, the construction unit shall reasonably choose dewatering measures to reduce the groundwater level.

When setting pit (trough) wall support for foundation pit (trough) and slope, the support design should be based on excavation depth, soil condition, groundwater level, construction method and adjacent buildings (structures). When removing the support, it should be removed layer by layer according to the backfill sequence of foundation pit (groove), and it should be removed and filled at the same time to prevent the slope from collapsing or damaging adjacent buildings, and reinforcement measures should be taken when necessary.

All kinds of building materials should be piled up at the edge of foundation pit (groove), slope and foundation pile hole, and piled up at a specified distance. During mechanical excavation of earthwork, operators are not allowed to enter the scope of mechanical operation to clean up or find slopes. After the excavation of foundation pit (trough), the underground structure and installation works should be carried out in time, and the excavation or backfilling of foundation pit (trough) should be carried out continuously. The construction plan should fully consider the inducing factors such as rainy season construction, and put forward pre-plan measures.

During formwork operation, steel supporting materials and bamboo and wood materials with serious corrosion, deformation, fracture, desoldering and loose bolts shall not be used as columns. The supporting column foundation should be firm, and the settlement of formwork support system should be strictly controlled according to the design calculation. The diagonal brace and the column should be firmly connected to form a whole.

During the construction of foundation pit (groove), slope, foundation pile and formwork operation, there should be special personnel to command and supervise. In case of displacement, cracking, leakage, etc., the construction should be stopped immediately, and the operators should be evacuated from the operation site, and the operation can only be started after the danger is eliminated.

When building materials, templates, construction machinery and other materials are stacked on the floor and roof, the construction unit shall strictly control the quantity and weight to prevent overloading. When the number of piles is large, the load should be calculated and the floor and roof should be reinforced.

Temporary buildings should be built safely and reliably, and temporary buildings built along the street, open space and at the foot of the mountain should take measures such as wind prevention, flood control, rainstorm prevention and debris flow prevention. The assembled trailer used in the construction site shall have the product certificate.

Eight. Implementation steps

The special rectification work for preventing falling and collapse on the construction site is divided into four stages.

The first stage: the investigation stage (XX to XX). All construction and supervision units carry out self-examination and self-correction, investigate potential safety hazards, eliminate them in time, and formulate corresponding rectification measures and plans for existing problems; The supervision team is responsible for the special inspection of the supervision projects, registering and filing the projects with problems one by one, and tracking and implementing the rectification. ,

Special rectification scheme for anti-collapse

The second stage: centralized rectification stage (from XX to XX), all construction and supervision units completely eliminate the existing safety hazards, and the supervision team will check the rectification situation and rectify the nonconformities within a time limit.

Three stages: acceptance stage (from XX to XX). Before XX, the supervision team will accept the rectification measures of the supervised project, and those who fail to pass the acceptance will be ordered to stop work immediately for rectification and be informed criticism; From May to May, the District Construction Bureau organized personnel to supervise the development of rectification work in our district, and reported the supervision on the website of Panyu District Construction Bureau.

Four stages: the summary stage (from XX to XX), the district construction bureau summarizes the experience and achievements of special rectification work.

Nine. job requirement

Raise awareness and strengthen leadership. Under the guidance of Theory of Three Represents, we should fully understand the importance, necessity and urgency of the rectification work, strengthen leadership, be pragmatic and ensure that the rectification work is effective.

Intensify publicity and communicate in time. Communicate this special inspection work to all construction supervision units and every project under construction, so that enterprises can complete self-inspection and rectification in the investigation and diagnosis stage. All units should determine the person responsible for the data collection and collation of special rectification work, analyze the situation in a timely manner, sum up work experience and report the work situation in a timely manner.

Seriously organize and rectify according to law. Seriously sum up the recent experience of special rectification of production safety in our region, formulate specific measures for special rectification of our department and unit according to the characteristics and weak links of construction casualty accidents in our region and the requirements and specific deployment of this plan, and seriously organize their implementation. The rectification plan of the enterprise should be put on the construction site for future reference.

Cross-check and implement responsibilities. The safety supervision station of the district construction project should carry out its responsibilities and follow up the rectification. The supervision teams and supervision offices should cross-check, perform their duties, cooperate closely, communicate with each other and make rectification together to ensure that the rectification measures are put in place.

Strengthen supervision and inspection, strict accountability. Our bureau and the district construction engineering safety supervision station will strictly supervise and inspect the rectification work of each unit and the performance of their duties according to law. Those who fail to perform their duties of safety supervision and management seriously, and those responsible for the accident will be dealt with severely according to law.

,