Report on application for commencement of construction

Application report for commencement of construction (generally 17 articles)

As people’s own quality improves, the frequency of use of the report is on the rise, and all the information mentioned in the report should be accurate. Let’s take a look at how the report is written. Below is the construction application report I compiled for you. It is for reference only. You are welcome to read it.

Construction Commencement Application Report Part 1

x Co., Ltd.:

After our x company won the bid, we actively organized relevant personnel and immediately established Dachahe (Conch Cement Plant) Bridge to G312 National Highway Section) The second bid section of the embankment management project project department selects personnel with strong technical strength and rich construction experience to serve as the project manager, technical person in charge, safety, operation and other major positions of this project, and select technology and practice, theory A rich subcontracting team stationed at the site on x month x, 20xx, with personnel, machinery, materials and other equipment all on site. With the coordination and cooperation of Party A, the "three connections and one leveling" work has been completed. We are now reporting to your department to apply for the start of construction.

Please review and approve.

Company For the engineering (bidding section) project, the construction machinery and other equipment have arrived at the site, the project department has been established, the construction management personnel and workers have been in place, and the conditions for starting construction are met. We are now applying to start construction, and we look forward to your approval.

xxxx Engineering Co., Ltd.

Application report for the start of construction on x, month x, 20xx 3

1. Acceptance unit:

Province Water Conservancy Department

2. Matters to be handled:

Approval for the start of water conservancy projects

(1) Water conservancy project construction projects directly under the Department.

(2) Provincial key water conservancy project construction projects and new construction, continuation, reconstruction and expansion, water supply (saving), water conservation, and hydropower with a total investment of more than 10 million yuan (approved feasibility study investment) and other various water conservancy engineering construction projects.

(3) Various water conservancy projects such as the removal and reinforcement of large, medium and small dangerous reservoirs and water-saving renovation projects in large and medium-sized irrigation areas subsidized by central funds.

3. Service procedures:

After the application materials of the starting unit are reviewed by the municipal (state) water conservancy (water affairs, water and electricity bureau), the application is submitted to the provincial water conservancy department.

4. Application conditions:

(1) The project legal person (or project construction responsible entity) has been established, the project organization and management structure and rules and regulations are sound, the project legal representative and management agency Members are already in place.

(2) The preliminary design has been approved, the project legal person and the project design unit have signed a drawing supply agreement, and the detailed construction drawing design can meet the three-month construction needs of the main project.

(3) The construction fund raising plan has been determined, the project has been included in the national or local water conservancy construction investment annual plan, and the annual construction funds have been implemented.

(4) The quality and safety supervision unit has been determined and the quality and safety supervision procedures have been completed.

(5) The construction and supervision units of the main project have been determined, and the construction and supervision contracts have been signed, which can meet the needs for the start of the main project.

(6) Construction preparation, land acquisition and resettlement can meet the needs for the start of the main project.

(7) The main equipment and materials required for construction have been sourced and can meet the construction needs of the main project.

5. Application materials:

(1) Construction start application report and construction start approval form in triplicate;

(2) Project legal person formation request and approval documents , Project legal person organization structure and main personnel (copy);

(3) Feasibility study report, preliminary design approval document (copy);

(4) Annual investment Planning documents and the implementation and arrival of construction funds (certifying materials);

(5) Quality and safety supervision documents (copies);

(6) Construction drawings and supplied drawings Agreement;

(7) Copies of the winning bid documents of the construction unit and the supervision unit, the notice of winning the bid, the signed project supervision contract and the construction contract (copies);

(8 ) Land acquisition approval procedures;

(9) Other supporting materials.

6. Time limit for processing:

From the date of acceptance at the administrative approval window of the department, a decision on whether to grant the administrative license shall be made within 20 working days; if within 20 working days If a decision cannot be made within 30 working days, a decision will be made within 30 working days with the approval of the department leader. If individual projects need to organize hearings, appraisals, expert reviews, inspections, testing, quarantine, etc., the time required will not be counted in the statutory time.

7. Legal basis:

(1) Article 13 of the "Construction Project Quality Management Regulations" (State Council Order No. 279): The construction unit shall not obtain the construction license or start construction. Before reporting, the project quality supervision procedures should be completed in accordance with relevant national regulations.

(2) Item 173 of the "Decision of the State Council on Setting Administrative Licensing for Administrative Approval Items that Really Need to Be Retained" (State Council Order No. 412).

(3) "Regulations on the Management of Water Conservancy Engineering Construction Projects" (Ministry of Water Resources Shuijian [1995] No. 128) Article 13: The project legal person or construction unit submits an application report for the start of the main project to the competent department. According to Approval authority can only be officially started after approval.

(4) "Interim Provisions on the Management of Water Conservancy Project Construction Procedures" (Ministry of Water Resources Shuijian [1998] No. 16) Article 8, Paragraph 2: The project legal person or its agency must report to the supervisor in accordance with the approval authority The department submits an application report for the start of the main project, and only after approval can the main project be officially started.

8. Charge standard: No charge

Date: Application report for commencement of construction Part 4

Comprehensive land consolidation project supervision department:

Signature As our construction organization structure has been established, all construction and management personnel have entered the site, construction equipment has been mobilized, and the construction organization design and various construction measures have been completed. According to the general and special clauses of the contract and the requirements of various regulations, we have We have met the conditions to start construction. We are now applying for the start of this project, please review it.

Applicant: Hebei Xingrun Construction Engineering Co., Ltd.

Application report for starting construction on XX, XX, XXXX, Part 5

Unit project name and number:

p>

First unit: water conservancy project

Project scope: DL000~DL740

Contractor (stamped): Shenzhen Tiehan Ecological Environment Co., Ltd. Meixian Xincheng Dasha River Lip Section Waterfront Park and Ecological Leisure Zone Phase I Project Department

Application Date: Year, Month, Day

1. Project Overview

This The construction scope of the division ranges from DL000 to DL740, with a total length of 0.74 kilometers; its main contents include: river bank protection engineering, embankment road engineering, and embankment connection engineering.

2. Progress plan

The construction progress plan of this division is as follows:

1. River dredging: It is planned to start construction on July 1, 20xx. Completed on July 15th.

2. Rip-stone fixing and slope protection: It is planned to start on August 1, 20xx and be completed on August 10, 20xx.

3. Gabion retaining wall: It is planned to start construction on August 10, 20xx and be completed on August 25, 20xx.

4. Earth excavation: It is planned to start on August 3, 20xx and be completed on August 20, 20xx.

5. Stone excavation: It is planned to start on August 1, 20xx and be completed on September 10, 20xx.

6. Earthwork backfilling: It is planned to start on October 5, 20xx and be completed on August 20, 20xx.

7. Reinforced concrete drainage pipe culvert: It is planned to start construction on August 10, 20xx and be completed on September 15, 20xx.

8. C20 concrete flood control wall: It is planned to start construction on August 10, 20xx and be completed on September 25, 20xx.

3. Resource Allocation

1. Main construction machinery configuration: This project has many projects and requires a large amount of machinery and equipment. The main machinery and equipment are detailed in the following table:

2. Construction materials: Arrive at the site 3 days in advance according to construction progress and needs.

3. Labor allocation: The average daily labor force is 85 people.

IV. Progress plan assurance measures

4.1 Construction management measures

(1) Strengthen project management, and the project department will work closely with the owner, supervision engineer and design unit , unified leadership of construction, unified command and coordination, overall responsibility for construction progress, quality and safety, etc., and ensuring the implementation of the progress plan in terms of organization and form.

(2) Strengthen construction management measures and formulate practical and feasible measures to ensure continuous construction.

(3) Adopt a "process management" model during project construction and follow up and inspect according to national quality standards anytime and anywhere. Strive to complete it in one go to ensure the implementation of the schedule.

4.2 Technical Guarantee Measures

The engineering department must conscientiously do a technical briefing to ensure that the technology is clear and the construction methods are appropriate. All construction personnel must understand the technical requirements, construction methods, and quality. The goal is clear.

Strengthen inspection and acceptance work, correct problems in a timely manner, and reduce rework and waste. For concealed projects, contact the supervisor and construction site representatives in advance to conduct acceptance and visa approval of the concealed projects in a timely manner.

4.3 Measures to ensure material supply and equipment investment

Propose a material demand plan one week in advance according to the plan. The material supply department should conduct scientific management and rational allocation to ensure the continuity of material supply. Timeliness.

Organize the arrival of machinery and equipment in a timely manner according to the needs of the project progress to ensure that all types of construction machinery and equipment are in good working condition.

4.4 Human Resources Guarantee Measures

Make labor arrangements according to the working surface and actual conditions to meet labor needs and ensure that the next process can be entered on time or in advance. It is necessary to ensure sufficient on-site labor force during holidays and busy farming seasons, and to achieve early prediction, early arrangement, and early implementation, and must not cause construction stagnation.

During the construction process, strengthen labor management and improve work efficiency to speed up the construction progress. Commencement Application Report Part 6

Contractor: (Full name and seal)

Project Manager: (Signature)

Expand CB14 Contract Project Commencement Application Form

p>

CB14 contract project start application form

(Contracting [] combined start number)

Contract name: Contract number:

To: (Supervision Organization)

The contract project we have undertaken has completed all preparatory work and has the conditions to start construction. We are now applying to start construction, please review and approve it.

Attachment: 1. Construction start application report.

2. Documents proving the conditions for starting work. Application Report for Commencement Part 7

1. Whether the construction site has three connections and one level, and whether various procedures have been completed; ()

2. The construction organization design has been completed and approved ; ()

3. The construction drawings and engineering geological survey reports have been reviewed to meet the specification requirements; ()

4. Whether the building red line has been approved by the Planning Bureau and the construction setting out has been inspected; ()

5. Whether the mechanical equipment has been brought into the site; ()

6. Whether the construction materials are available and inspected; ()

7. Whether the third-level worker safety education has been carried out, and construction safety and technical explanations have been carried out for each type of work; ()

8. Whether on-site safety protection measures are sufficient; ()

9 , Quality education and technical briefing have been carried out. ()

(Construction unit) Project technical person in charge;

Year, month and day

Opinions of the construction unit

(Official seal)

Project person in charge:

Year, month and day

Opinions of the supervision unit

(Official seal)

Project person in charge:

Year, month and day

Opinions of the construction unit

(Official seal)

Project leader:

Year and month Daily Start Application Report Part 8

Our ****** Co., Ltd. is undertaking the ****** project and has completed the establishment of the project department as required. The materials and machinery construction team have been fully organized and organized The project manager, chief engineer and other personnel conducted a construction site survey and found that the ******* project has met the conditions for commencement and applied for commencement.

Attachment:

1. Declaration form for the start of construction of the contract section

2. Construction management organization chart

3. Project entry Mechanical equipment table

4. Project site construction manpower table

************ Co., Ltd.

Date: ***year**month* *Day Commencement Application Report Part 9

xxx Development Office:

Hereby, for the xxxx project (bidding section) undertaken by our unit, the construction machinery and other equipment have arrived, and the project department It has been established, the construction management personnel and workers are in place, and the conditions for starting construction are met. We are now applying to start construction, and we look forward to your approval.

Engineering Co., Ltd.

Report 10 for the start of construction on xx, xx, 20xx

Project name

Project location

Building area

Structure type

Level

Construction unit

Project cost

Contracting method

Contracting unit

Planned number of people entering the site

Number of people entering the site

Commencement date

Completion date

p>

Completion date of contract agreement

Review status

Basic conditions for starting construction

The project contract has been signed

Design process Review, drawings have been jointly reviewed, and technology has been exchanged

The civil engineering project has met the installation conditions

The construction organization design (construction plan) has been prepared

(1) Construction technology The measures have been determined

(2) The construction drawings and construction budget have been prepared

(3) The main materials have arrived and the supply can be guaranteed

( 4) The supply of finished and semi-finished products can be guaranteed

(5) The main construction machinery and equipment has arrived at the site

(6) The labor force has been implemented and the progress plan has been prepared

< p>Contracting unit: (Signature and seal)

Year, month and day

Construction unit: (Signature and seal)

Year, month and day Supervision unit: (Signature and seal)

Year, month and day

1. Procedure for submission of commencement report:

Project commencement submission form → Commencement report → Construction site management inspection record (regional submission for inspection There are differences)

2. Instructions for filling in:

1. The project name and structure type should be filled in according to the construction project planning permit

2. Construction unit, construction unit , The name of the design unit and supervision unit shall be filled in according to the quality supervision registration form

3. The project address, construction area, and contract cost shall be filled in according to the construction project planning permit

4. Start date and plan The completion date shall be filled in according to the registered contract or quality supervision registration form

5. Construction project construction license issuing unit and number: filled in according to the construction license or commencement report

6. Construction drawing review Fill in the application report for commencement of work based on the construction drawing review certificate Part 11

Our XX Co., Ltd. is undertaking the XX project and has completed the establishment of the project department as required. The materials and machinery construction team have been fully organized, and the project manager and general manager have been organized. Workers and other personnel conducted a construction site survey. The XX project has met the conditions for commencement and applied for commencement.

Attachment:

1. Declaration form for the start of construction of the contract section

2. Construction management organization chart

3. Project entry Mechanical equipment table

4. Project site construction manpower table

XX Co., Ltd.

Date: XX year XX month XX application report for start of construction Part 12

After our XX company won the bid, we actively organized relevant personnel and immediately established the project department for the second bid section of the Dacha River (section from Conch Cement Factory Bridge to G312 National Highway) embankment management project, selecting personnel with strong technical strength and rich construction experience. Serve as the project manager, technical person in charge, safety, operation and other major positions, and select a subcontracting team rich in technology, practice, and theory to station at the site on x, x, 20xx, with all personnel, machinery, materials and other equipment. With the coordination and cooperation of Party A, we will do a good job of "three connections and one leveling" and now report to your department to apply for the start of construction.

Please review and approve.

XX Company

20xx year x month Development Corporation's construction of Xianglong Huatong Logistics Park 7#-11# warehouse project) (9#, 10#, 11# warehouse) project, on January 15, 20xx, in order to ensure the quality of the project, our company studied to stop steel structure operations for this project Construction, our project department now plans to completely stop work on January 15, 20xx.

Before the shutdown, our company will carry out finished product protection and on-site safety hazard investigation on the current project completion status. Put up "warning signs" on unused power distribution cabinets, power lines, etc. and lock them. Carry out safety inspections on the living area and turn off the power in a timely manner. During the shutdown period, full-time personnel will be arranged to conduct safety inspections on site. They will be responsible for identifying potential safety hazards at the construction site and living area and for ensuring that everything is appropriately sized.

Before the suspension of work, the surrounding enclosure of the project had been fully implemented as required. All safety work has been fully implemented as required. Construction is expected to resume on March 15, 20xx. We are now applying to relevant departments to inspect our construction site and issue instructions to stop work.

Please give me your instructions!

Applicant unit:

Application report for the start of construction on December 27, 20xx Part 14

xxx Development Office:

According to the requirements of the construction contract , we won the bid and undertook the construction of the sixth section of the provincial cultivated land development special fund project of Xingshupo and Yaodaowan, Xiyan Town, Yu County. The on-site organization personnel are ready to enter the site, the construction machinery and equipment have entered the site as required, and the construction organization design has been completed as required and submitted together with the start-up report form. All work is ready. We are now requesting your approval to start construction.

This is reported.

XX

Application report for commencement of construction on XX, XX, month XX, Part 15

xxx Development Office:

Hereby, my unit will bear xxxx For the Engineering (Section ?) project, construction machinery and other equipment have arrived, the project department has been established, construction management personnel and workers have been in place, and the conditions for starting construction are met. We are now applying to start construction, and we look forward to your approval.

Engineering Co., Ltd.

Application report for the start of construction on xx, xx, 20xx 16

Our company x Co., Ltd. is undertaking the project and has completed the establishment of the project department as required , the materials and machinery construction team have been fully organized, and the project manager, chief engineer and other personnel have been organized to conduct construction site inspections. The project has met the conditions for commencement and application for commencement of construction has been made.

Attachment:

1. Declaration form for the start of construction of the contract section

2. Construction management organization chart

3. Project entry Mechanical equipment table

4. Project site construction manpower table

>

1. Factory start-up plan arrangement

At present, all the construction personnel of our xx factory are in place, the mechanical equipment has been brought into the site and debugged, the raw material testing and testing has been completed, the test section paving has been completed, and various The indicators all meet the design requirements, the preparations are ready, and the construction conditions are met. We hereby apply to start construction.

2. Construction organization structure

In order to ensure the smooth progress of the project, our unit has established the project management department for the second section of the S329 Taifei first-class highway intermediate repair project in Shandong Province. It is formed by personnel with rich experience in maintenance construction and management.

3. Factory start-up target commitment

1. Quality target: The quality indicators of this project all meet the technical specifications and acceptance requirements of the bidding documents. The quality assessment of the acceptance of the bid section project: Qualified; quality assessment of completion acceptance: excellent.

2. Construction period target: completed before September 12, 20xx.

3. Safety goal: ensure that no safety accidents occur.

4. Civilized construction goals: This project creates a standardized construction site for civilized construction.

5. Environmental protection goals: abide by national laws and regulations and not pollute the surrounding environment.

6. Management objectives: Promote total quality management, implement optimized combination, dynamic management, flow operations, reasonable crossover, and balanced production. Achieve excellent construction quality, safe production without accidents, guarantee the contract period or complete construction tasks in advance, and create a civilized construction site.

IV. Equipment personnel entering the site

1. Personnel entering the site. According to the construction situation of the test section, we have added new personnel and have invested enough construction equipment. And technical and management personnel can completely ensure the smooth progress of the project.

2. Equipment arrival situation. In terms of equipment, we have invested in a fiber sealing machine imported from France, a ZL50 loader, two gravel spreaders, and two glue machines. A road roller, a traffic control vehicle, a piece of traffic safety control equipment, etc., fully meet the normal construction needs.

5. Guarantee measures to achieve the goal commitment

1. Adopt advanced and stable fiber sealing special vehicles produced by the French Segma company, and adopt advanced construction methods and processes Put into construction and production.

2. Mobilize our unit’s elite management personnel and the strongest technical force, and form a strong project management department.

3. Fully consider various factors that are not conducive to construction progress and quality, and leave room for comprehensive consideration in construction arrangements, personnel and equipment allocation, construction, and construction methods.

Sincerely,

Salute!

Applicant unit: xxx

20xx, x month xx day;