Electric power transformation project contract template

Power Transformation Project Contract Template (1)

Party A: _________

Telephone: _________

Party B: _________

Telephone: _________

Based on the trial installation, testing and acceptance of the energy-saving transformation project, Party A and Party B are satisfied with the energy-saving transformation, and now formally sign the "Energy-saving Transformation Project Contract" Conduct comprehensive energy-saving renovations on all electrical equipment located in _________.

1. The type and quantity of electrical equipment and the corresponding type and quantity of energy-saving equipment

2. After negotiation between the two parties, Party B adopts the method of buying out the energy-saving equipment in one go. The specific payment method is as follows: 30% of the total price of the energy-saving equipment shall be paid to Party A within three days from the date of signing of the contract. After receiving the payment, Party A will immediately organize the production of the energy-saving equipment. Within ________ days, ensure that the equipment is transported to the installation site and engineering and technical personnel are organized to start installation. When 50% of the total amount of the entire energy-saving transformation project is completed, Party B will pay another 30% of the total project amount to Party A, and the remaining 40% will be paid to Party A in one lump sum after the entire energy-saving transformation project is completed and accepted.

3. The standards and methods for acceptance shall be in accordance with the standards and methods specified in Section ___________ of the "Trial Installation Agreement".

IV. Rights and obligations of both parties

1. Party A:

① The energy-saving equipment produced must comply with national product quality requirements and technical indicators. All equipment in the contract will be subject to free warranty and maintenance within two years. It will also provide Party B with free professional guidance and consultation on the use and maintenance of Liangsheng's energy-saving equipment, as well as free upgrade services for related functions and software. If the equipment fails after two years, Party B will still be responsible for repairs, but Party B will be responsible for the material costs.

② If the equipment fails during operation, Party A will send personnel to the scene within 24 hours after receiving the notice from Party B.

③ After the installation and operation of the energy-saving equipment, Party B shall not cause any damage to the electrical equipment, otherwise, Party B will bear all economic losses.

2. Party B:

① Assign special personnel to assist in the power-saving renovation project and provide a convenient working environment for Party A’s engineering and technical personnel.

② It is not allowed to add electrical equipment without authorization, causing the load of the energy-saving equipment to exceed a certain capacity, causing unnecessary losses. If it is really necessary to add electrical equipment, Party A should be notified and power-saving equipment should be added accordingly.

③ You are obliged to maintain the installed energy-saving equipment and do not allow any human damage.

5. Matters not covered in this contract shall be resolved through negotiation between the two parties on the basis of equality and friendship.

6. This contract is made in _________ copies. Party A and Party B each hold ________ copies, which are equally valid.

Party A: _________ (seal) Party B: _________ (seal)

Representative: _________ (signature) Representative: _____________ (signature)

_________ ____month____________month______year_electricity transformation project contract template (2)

Party A:

Party B: _______________

1. Project Overview

1. Project Name:

2. Project Address:

3. Contracting Method:

2. Party A’s work

1. Provide Party B with a copy of the confirmed construction drawings or practice instructions, and make an on-site explanation to Party B. Provide Party B with water, electricity and other facilities required for construction, and explain the precautions for use.

2. Designate Bian Qiang as Party A’s representative at the construction site, responsible for the performance of the contract. Supervise and inspect project quality and progress.

3. Party B’s work

1. Formulate the construction plan and progress plan according to Party A’s construction drawings and instructions, and submit them to Party A for approval.

2. Designate _____ as Party B’s representative at the construction site, responsible for contract performance. Organize construction according to Party A's requirements, ensure quality and quantity, complete construction tasks on schedule, and resolve various matters that Party B is responsible for.

3. Strictly implement construction specifications, safe operating procedures, and fire safety regulations. Carry out construction strictly in accordance with drawings or instructions, and make various quality inspection records. Participate in completion acceptance and prepare project settlement.

4. Safety precautions must be taken at the construction site. Any safety problems caused during the construction period shall be borne by Party B.

5. During construction, the original building structure and various equipment and pipelines shall not be dismantled or modified at will without the consent of Party A.

IV. Agreement on construction period

1. The completion time shall be _____year___month___day before the construction period promised by Party B.

2. Failure to start work as scheduled or stopping work midway without special reasons will affect the construction period and will not be postponed.

3. Due to force majeure factors (work electricity, earthquakes, thunderstorms, etc.), the construction cannot be carried out, and the construction period will be postponed.

4. The construction period can be adjusted or extended appropriately according to the actual situation.

6. Agreement on project price and settlement

1. The price approved by the Municipal Finance Bureau shall be used as the basis for payment. If the one-time contracted by Party B is RMB _____ yuan, if calculated based on the construction period, it will be RMB _____ yuan/day.

2. A one-time payment will be made after the project is accepted and accepted. Party A will no longer charge a deposit, but if any line problems occur within 1 year from the date of completion, it will be Party B's construction responsibility, and Party B will be responsible for repairs and changes.

VII. Liability for breach of contract

1. Party B shall properly protect the equipment and existing lines provided by Party A. If any loss is caused, Party B shall compensate according to the price.

2. Party B shall pay liquidated damages to Party A if the construction period exceeds the construction period. The liquidated damages shall be settled on a daily basis and the amount shall be deducted according to 10% of the project cost.

8. Supplementary Provisions

1. This contract is made in two copies, each party holding one copy, which has the same legal effect.

2. This contract will automatically terminate after the performance is completed.

Party A:

Telephone:

Party B:

Telephone:

Year, month, day power transformation project Contract Template (3)

The construction unit (hereinafter referred to as Party A): (hereinafter referred to as Party B):

In accordance with the principles of voluntariness, fairness and good faith, both parties shall, in accordance with the "People's Republic of China "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and "Construction and Installation Project Contract Regulations", combined with the specific conditions of the project, the following contract terms have been reached through friendly negotiation between the two parties. Please *** Comply with the implementation.

Article 1: Project Overview

1. Project name: XX Provincial Party Committee Farm 0.4KV line and distribution room renovation and installation project.

2. Project location: XX Road, XX District, XX City, XX Province.

3. Project content: 1 new power distribution room, all electrical equipment and electrical materials and dismantled parts of the circuits in the first bid section.

4. Start and completion dates

(1) Planned start date:

(2) Planned completion date:

(3 )Planned total construction period:

Article 2: Contract price

1. This project is the general contractor of Party B, and the contract price of the first bid section is RMB. Capital letters

2. During the construction process, Party A is responsible for the coordination between the power supply department and each power user and residential household.

Article 3: Payment method

1. Party A shall pay the total contract price to Party B within three days from the date when the contract is signed and takes effect.

2. Party A shall pay Party B the full amount of the project within fifteen days after the first bid section is renovated and energized.

Article 4: Project delay period

If any of the following circumstances occurs, Party B will not be responsible:

1. Construction changes and construction changes required by Party A Design changes.

2. Because the line path is not smooth.

3. Construction delays due to natural disasters, heavy rain or unforeseen factors.

Article 5: Rights and Obligations of Party A

1. Party A shall provide Party B with construction convenience and conditions.

2. Party A will handle and bear full responsibility for coordination and compensation work such as land acquisition, green crops, trees, and house demolition.

3. Party A shall reimburse Party B for the corresponding expenses due to waiting work and newly increased project quantities caused by Party A.

Article 6: Rights and Obligations of Party B

1. Party B shall conduct safe and civilized construction.

2. Strengthen construction site management and strictly implement safety measures. If a personal safety accident is caused by Party B during the construction period, Party B will be responsible for it. Any accident not caused by Party B will be borne by the responsible party.

3. Party B shall carry out construction in accordance with the technical requirements and specifications of power supply operations, ensure quality, and complete the work on time.

Article 7:

1. Both parties A and B are required to abide by this contract. Any matters not covered shall be resolved through negotiation between the two parties.

2. This contract will terminate automatically after power is supplied and Party A pays Party B the project payment.

3. This contract is made in two copies, with Party A and Party B each holding one copy.

Party A (seal) Party B (seal)

Legal representative: Legal representative:

Person in charge: Person in charge:

p>

Telephone number: Telephone number:

Bank account: Bank account:

Account opening bank: Account opening bank:

Signing date: Year, month and day.