The fire protection report should include design instructions, relevant professional design drawings, main fire protection equipment, fire protection products and building components and building materials with fire protection performance requirements, focusing on reflecting the mandatory fire protection technical standards for engineering construction in accordance with the national Required design content.
Fire protection design documents should be arranged in the following order:
1. Cover: project name, design unit, date.
2. Title page: The names of the legal representative of the design unit, the chief technical person in charge, the general person in charge of the project, and the persons in charge of each major, and they shall be signed or stamped with authorization by the above persons.
3. Design file directory.
4. Design instructions.
5. Design drawings.
Extended information:
Declaration conditions for fire protection audit of building fire protection design
1. Fill in the "Fire Protection Audit Application Form for Building Fire Protection Design", with automatic fire protection facilities For projects, the "Automatic Fire Protection Facilities Design Fire Protection Review Application Form" should be filled in;
2. Topographic map of the unit where the construction project is located (1/1000), project overview and brief description;
3 , Two copies of the 1/500 measured general floor plan of the construction project, the project approval document from the Planning and Economic Commission, and a red line map of the urban construction planning department;
4. National and provincial key projects and other automatic fire protection facilities The construction project should submit a special article on fire protection design
5. The design brief, instructions, and industrial building should have production process flow, raw materials and semi-finished products used, physical and chemical properties, quantity, and transportation and storage methods of the finished product. and other information;
6. A complete set of civil engineering, structural, water, electricity, HVAC and fire protection system drawings;
7. The design of building fire protection facilities must be undertaken by a legally qualified unit. The drawings must have the design certificate number, the name of the design unit and the signatures of the designer and reviewer, stamped with a special design seal, and issue an "Engineering Fire Protection Design Self-Audit Form";
8. Copy of the corresponding qualification certificate of the design unit pieces.
Baidu Encyclopedia--Fire Protection Report
Baidu Encyclopedia--Fire Protection