In our daily life, there are more and more occasions to use meeting minutes, which are generally written in the third person. Want to learn to draft meeting minutes but don't know who to consult? The following is the summary of the construction engineering meeting I compiled for you, for reference only. Let's have a look.
Minutes of Architectural Engineering Meeting 1 Meeting Time: 20xx February 28th14: 30—15:15.
Meeting place: Office of Project Department
Participants:
Project department: XXX, XXX, XXX
Labor service team: XXX, XXX, XXX
Owner: XXX
Recorded by: XXX
Theme of the meeting: Questions about XX in 20xx.
Meeting contents:
Management personnel of project department:
XXXX 1:
(1), during the two sessions, workers are not allowed to go out without authorization, and untrained workers are strictly prohibited from entering the construction site.
(2), if you need to use open flame operation, you must hold a hot card issued by the security department of the project department, and complete labor protection articles and fire fighting equipment.
(3), workers must wear qualified safety helmet when entering the construction site, and must go through a safe passage.
(4), aerial work must be in strict accordance with the safety technical disclosure content operation, it is forbidden to illegal operation.
(5) During the construction, the civil protection articles shall not be dismantled at will.
6. All hand-held tools and large machinery of the labor service team must be accepted by the project department, and they can enter the site only after they are qualified.
All landowners, smoking is strictly prohibited on the construction site.
Today, it is forbidden for electricians to connect wires.
2.XXXX:
(1), entering the decoration period, all disciplines need to cooperate with the construction and communicate with each other to ensure the smooth progress of the work.
(2), strictly implement the model guide policy, to ensure the construction quality.
(3) The plugging and reinforcement of the secondary structure pipeline should be completed as soon as possible.
(4), the labor force needs to strengthen the system of self-inspection and mutual inspection to ensure the survival rate of construction at a time.
(5), the professional construction of construction waste should be cleaned up in time.
Minutes of Architectural Engineering Meeting 2 Project Name: Teaching Complex Building of xxx Primary School in XX District, XX City
Meeting place: field office.
Meeting time: 20xx65438+February 10.
Construction unit: Education Bureau of Jianghan District, xx City, Zhang Jiujian and Liu Ping.
Design unit: xxxx Architectural Design Co., Ltd., xxx.
Survey unit: xx Survey and Design Institute, Peng xx.
Supervision unit: XXX xx Building Technology Development Co., Ltd..
Construction unit: xx Zhong Da Construction Co., Ltd., xxx.
Supervision unit: Jianghan District Construction Management Station of xxx City.
Meeting contents:
Organized by Party A, the comprehensive teaching building project of xXX Primary School in Jianghan District of XX City was completed and accepted on February 20xx 10, and the summary opinions are as follows:
Construction unit: Since the project started, it has been constructed in strict accordance with the design drawings, design changes and specifications. The construction of each division shall be supervised by the supervision engineer. After each working procedure is completed, we shall conduct self-inspection first, and then report it to the supervision engineer for acceptance. After the supervision engineer has passed the acceptance, the next working procedure can be carried out. In the control of raw materials, all incoming materials have product certificates and re-inspection reports, and can only be put into use after inspection. The design, survey, construction, supervision and pipe construction station of the foundation and main branch of this project have passed the acceptance, and now it is reported to the completion acceptance of this project.
Supervision unit: The project started on May 8, 20xx and was completed by the end of August, with tight construction period and fast construction progress. Our supervision engineer carries out the whole process of tracking supervision and quality control, and strictly requires the construction unit to carry out the construction according to the contract requirements, design drawings and specifications. Engineering materials shall strictly implement the system of on-site witness sampling and inspection, and shall be used in this project after passing the re-inspection. The technical data of this project is basically complete, and the engineering data file is true, complete and effective. The quality of each sub-division and sub-division project meets the requirements of design and construction specifications, contractual requirements, mandatory standards for engineering construction and relevant national laws and regulations, and it is agreed to be completed and accepted.
Survey unit: The geological conditions of this project are surveyed by our unit, and the foundation adopts prestressed static pressure pipe pile foundation and reinforced concrete cap foundation. According to the results of foundation acceptance and settlement observation of this project, it meets the specification requirements and agrees to the completion acceptance of this project.
Design unit: The overall construction of this project is very good, which is consistent with the design drawings, but the interior of the water retaining line of the outer balcony needs to be re-treated, and it is hoped that the settlement observation work in the later period will be strengthened. After participating in the construction and acceptance of the project at various stages, the project meets the requirements of design and construction specifications, meets the requirements of mandatory standards for engineering construction, and the project structure is safe and reliable, and the completion acceptance is agreed.
Construction unit: the overall construction quality of this project is good, and it meets the completion acceptance conditions as a whole. We agree with the opinions of all parties and carry out the completion acceptance of the project. But if there are some minor problems, please ask the construction unit to rectify as soon as possible. Outdoor fire hydrants need to move towards the wall, the installation of steel door peephole needs to be improved, the leaking part of bridge hanger needs to be painted with antirust paint and topcoat, and the bridge and fire pipe nodes need to be cleaned well.
Housing management station: According to the on-site acceptance, the overall construction quality of the project is good and the structural safety is good. What needs to be put forward is that, for safety reasons, PVC pipes leaving the roof should be clamped, rainwater grates should be added to the roof outlet, and protective measures should be taken for the height difference between the overhead ground on the first floor and the outdoor ground. There is a small amount of stagnant water in the balcony floor drain outside the library, which needs to be adjusted. Agree to the completion acceptance of this project, and require the construction party to deal with and improve the places that need rectification as soon as possible, collect and sort out the data, and complete the completion record.
Minutes of Building Engineering Meeting 3 Project Name:
Conference theme: summary of engineering construction requirements
Moderator: xxx
Host position (title):
Meeting date: xxxx, xx, xx
Meeting place: construction site
Units and personnel attending the meeting:
Meeting contents:
1, quality control: use raw materials and components carefully, put an end to the use of materials that have not been inspected or failed to pass the inspection, check the factory certificate documents, and urge the construction unit to sample and test according to national regulations. Notify the supervisor to witness the sampling for inspection, and use it only after passing the inspection.
2, the specific requirements of key processes are:
A, formwork engineering: according to the specification and design requirements, the arch frame should arch, and pay attention to the elevation and axis position. Check the signature first, and then inform Party A and the supervisor to accept the visa.
B. Reinforcement engineering: Pay attention to joint position, lap length, anchorage length, allowable percentage of joint area, hook length and angle, and layout of reinforcement in encryption area. Conduct self-inspection first, and then notify Party A and the supervisor for acceptance and signature.
C. Concrete engineering: ensure the mixing time, pay attention to the thickness of protective layer of reinforcement, set mortar pad, set horse stool between double-layer reinforcement, pay attention to the pouring sequence (along the beam direction), vibrator operation method and construction joint lien. When cast, the builder and foreman of the construction unit are required to be on site, and carpenters and ironworkers are sent to follow. Keep the pressure test block as needed.
3. Progress control: urge the construction unit to reasonably organize parallel and cross operations according to the project progress plan, and the builder shall formulate the construction progress plan and submit it to the supervision unit.
4, must pay attention to the safe use of electricity, to achieve three-level protection, the use of iron distribution box, equipped with full-time electrician. Workers must wear safety helmets when entering the construction site, and the tower crane should be inspected frequently. No drunken operation is allowed.
Minutes of Architectural Engineering Meeting 4 Meeting Time: Sunday, March 23rd, 20xx
Meeting place: project meeting room
Participants: XXX, XXX
Moderator: XXX
Absent: XXX
Minutes of meeting: XX
Meeting contents:
A, engineering personnel to report the situation.
1, XXX: civil engineer, in charge of the community.
At present, the construction progress of this residential area is as follows:
(1) Under normal circumstances, 1 trench piling is expected to be completed in September 10.
(2) Municipal wiring problem: Netcom has completed well layout and is currently completing wiring tasks; In terms of gas pipelines, the construction progress is backward, and the situation remains the same despite repeated urging.
(3) Review the positioning of Building 6 and Building 7.
(4) The elevations of the square and buildings 4 and 5 have been determined.
(5) The temporary construction road of brick slag on the side of Buildings 6, 7 and 8 was cleared today.
(6) Graded sand cushion is suggested to be changed to gravel cushion.
2.XXX: civil engineer, responsible for the park project.
The current progress report of the community is as follows:
(1) Cooperate with Gong Wei to complete the elevation survey of the residential area.
The current progress of the park is reported as follows:
(1) The backfilling of the old canal in the park has been completed;
(2) Determine the elevation of the lake bottom today, release the lake in the afternoon, and finish the linear work in two days.
(3) The geotextile at the bottom of the lake will be completed by the end of the month;
(4) Complete the masonry of the mortar rubble of the retaining wall, and complete the foundation construction of the small waterfall.
(5) Children's Square cannot be constructed due to the increase of large arbor foundation, so a new scheme is designed.
(6) The paving of the main square is temporarily suspended due to the requirement of government leaders to add Go and put chess array in the main square, and the design drawings are needed. The relevant government departments will determine the design scheme before construction.
(7) By the end of the month, 50% of the pavement of the North Square and the frame columns of the teahouse structure will be completed.
(8) Measure the height of rockery in the afternoon, and plan to complete the rockery construction at the end of the month.
(9) Planting trees and shrubs in the site will be completed 80% as planned. Due to the undecided price of turf, the problem of turf entry was postponed.
(10) The earthwork excavation on the north side of the artificial lake will be completed before August 26th.
3.XXX: Mainly responsible for contract work.
At present, the contracts for fountains and CFG piles in Buildings 6, 7 and 8 have been completed, and it is necessary for leaders to determine the general contracting scheme of the community.
Two. XXX summarizes the current site situation and makes work arrangements.
1. In view of the current situation, community construction is now the focus, and it must reach plus or minus zero in the end of June of 10. According to the schedule, the construction period of 1 building is strictly guaranteed, and the piling work of 10 trough must be completed in September of 10.
2. Personnel changes: Due to the shortage of residential projects, XXX cooperated with XXX and transferred back to the park project on August 25th.
Park project: XXX is mainly responsible, XXX and XXX cooperate with each other, and it will be completed at the end of August and the beginning of September according to the government's established goal. Three people will communicate, combine the work arrangement and hand in a work plan.
Residential project: XXX is mainly responsible for it, and XXX and the upcoming colleagues cooperate with each other. Three people work out a feasible work plan according to the site situation and the project characteristics and the established construction period.
3, for the layout of the park, XXX should pay close attention to docking with the design, and determine the layout scheme of 80 trees and the modeling design scheme of 4 structures in time; For the water curtain film design company to enter the site within 2 days, XXX should cooperate with Guo Gong; After the leader determines the plan, he needs to build a landscape wall.
4. When greening, XXX needs to record the seedlings that enter the site every day, and make standard comparison item by item. XXX is responsible for data summary. And determine the price of today's lawn to ensure that it enters the market according to the actual progress.
5. Collect information about park benches, trash cans and signs, arrange photos, and report to the leaders for final determination.
6, engineers need to be mature before doing things, to have the right way of thinking.
Three. XXX's evaluation summary of the current project progress.
1, for the inspection work of government departments in late August and early September, the price and paving scope of the lawn should be determined. For rockeries, water curtain fountains and lakes, we must pay close attention to the construction period.
2. For the choice of design, we should pay attention to the final effect and not blindly follow. For the selection of benches, trash cans and signs, two or three schemes, including drawings and pictures, need to be prepared and submitted to government leaders for approval.
In view of the current competitive pressure in the market, the issue of schedule is the most important. The construction unit has entered the site, so pay attention to the selection and coordination methods of the management personnel of the construction unit to make them obey the management. In residential areas, we should pay attention to the construction progress, focusing on the 1 building, and implement the plan every day, supervise the construction unit according to the daily progress, and urge the construction unit to quickly carry out the temporary image construction work; And with the construction unit to do a good job of taking over the safety aspects such as water and electricity.
4. The requirement for work is that the work arranged by the leaders should be reported in time and planned every day. Engineers should meet at any time to solve existing problems without delay.
5. Guide the engineering department to solve the existing site management problems, as follows:
(1)XXX: There is a delay in changing the gas pipeline in the residential area.
(2) To determine the species of grass on the hillside of the park as soon as possible;
(3) Make a daily nursery stock entry schedule and communicate with responsible personnel such as XX.
(4) Supervise the construction unit to proceed as scheduled. XXX contacted the person in charge of No.1 Middle School today to determine the opening position.
(XXX reflects that the budget reported by the culvert construction unit is inconsistent with the contract.
Problem, the manager gave the budget content to Wang.
(6) Engineers should pay attention to the way of coordination and have their own working principles.
Four. Meeting summary
According to the current situation, I hope everyone can cultivate correct work style and thinking in this team, and work together to solve practical problems.
Summary of Architectural Engineering Conference 5 Organizer: Architectural Engineering Co., Ltd.
Meeting time: XX, xx, xx, xx, xx, xx, xx, xx:
Meeting place: company meeting room
Participants in participating units
Company, various project departments, etc.
Moderator:
Recorder:
On the afternoon of xx, xx, XX, the above-mentioned project engineers and technicians were invited to make disclosure for the project of x# Building, which opened the resettlement house years later.
Conference content
Speech by Technical Director:
Say goodbye to the old year and welcome the new year. The x# building project of resettlement housing has gone through X years safely and smoothly. Now we have ushered in a new X year. I hope everyone will work together and make great achievements again! The follow-up work plan is as follows:
1. Due to the increase of the company's projects, a main builder () and a material buyer () are now added. The main builder is responsible for all quality, safety and team-to-team coordination in the project. All the builders, safety officers and teams on site must obey the command of the main builder; Zhou Jianan is the main material purchasing department, which cooperates and assists Zhou Jianan's work. All materials, such as hospitality, alcohol and tobacco, are purchased by the materials department. See the flow chart for details. The overall responsibility is.
Second, the construction plan:
(See attachment for details)
Third, strengthen the communication between the project and the team, conduct a thorough investigation of each team, and do a good job of daily workload statistics; Strengthen process management, strictly implement the regular meeting system, attend regular meetings on time, and put an end to unreasonable absence.
Fourth, carry forward the spirit of self-sacrifice and vigorously advocate the spirit of dedication. Project department personnel need to go to work on time. If they go out for something, they need to ask for leave from the person in charge. When the holiday project is under normal construction, the project department will not have a holiday.
The builder's speech:
A, communicate with the team after the adjustment of the construction scheme;
Second, if the scaffold is loose, it should be reinforced;
Third, the team members should arrive as soon as possible.
Speech:
The progress plan shall be implemented after being approved by the team.
Speech:
I upgrading, maintenance and repair of equipment;
Second, scaffolding needs padding;
Third, strengthen border protection.
Speech:
First, material procurement needs and coordination;
Second, strictly follow the procurement system.
Remarks: There is no doubt that the participants will discuss the above contents!
Standard format of minutes of construction engineering meetings II
construction unit
Zonghe real estate co., ltd
construction organization
Construction engineering group
Supervision unit
Guizhou province architecture design research
Design organization
Jingsen Engineering Design Consulting Co., Ltd. Theme:
Inspection and coordination of quality, safety, progress and data implementation of the second phase B group project in 20xx year 165438+ 10. Question:
Engineering quality: the installation integrity of steel binding formwork is not good, and there are mistakes and omissions. The integrity of formwork installation is not good, and the concrete pouring process is not strictly implemented according to the plan, resulting in the deviation of wall column reinforcement and the damage of water and electricity embedded pipes. Safe and civilized construction: electricity consumption for temporary construction on the construction site, site sanitation, pile hole coverage, etc. Does not meet the specification requirements. Progress: the plan management is seriously lacking, and the project progress is lagging behind. Data: the data of the construction unit is lagging behind and out of sync with the field entities; The technical treatment plan is incomplete, the report is not timely, not targeted, and the information communication is not smooth.
Coordination conclusion:
1. It is forbidden for the construction unit to take care of the contract. Now that the quality inspector, safety officer, technician and water and electricity builder are all in place, civil builders are required to strengthen hierarchical management. Submit the project organization structure quality assurance management system and safety management assurance system before this Saturday, and implement the relevant responsibility system to the team within three days.
2. Party A and the supervisor participate in the hidden acceptance throughout.
3, supervision put forward rectification requirements, timely tracking inspection records rectification implementation, in strict accordance with the contract.
4. Before this Friday, the construction scheme of bored piles left over from buildings 13#, 14# and 24# was determined on site, and the construction of pile foundations left over from buildings 13#, 14# and 24# was completed this month.
5. Report the rectification plan for safe and civilized construction before this Saturday, and send it to the supervisor for review. If the rectification still fails to meet the contract requirements before 12 this month, it will be regarded as a breach of contract and linked to the review of progress payment.
6. Before this Saturday, confirm the hydropower related problems with the project owner, submit the hidden data of 8#, 9# and 25# before next Monday, and submit the special construction plan for hydropower and the inspection procedures for materials entering the site before next Wednesday.
7. Submit the monthly plan before next Monday.
8. The technical scheme and relevant visa determined on site shall be sent to the supervisor and the contractor in written form within 48 hours.
9. The information such as engineering contact list submitted by the construction unit shall be reported by the supervisor within 24 hours, and the owner shall reply within 24 hours.
10, the quality and safety technical disclosure meeting of the construction party was attended by the supervisor, and relevant information was collected.
1 1. The project visa submitted to Party A in the early stage of construction shall be handled before the 20th of this month.
Participants of the construction unit
Date, year and month
Participants in the supervision unit
Date, year and month
Participants of the construction unit
Date, year and month
This form is in triplicate, one for the construction unit, one for the supervision unit and one for the construction unit.
6 minutes of the construction project meeting of the construction unit
Xx zonghe real estate co., ltd
construction organization
Xx construction engineering group
Supervision unit
Guizhou province architecture design research
Design organization
Xx Jingsen Engineering Design Consultant Co., Ltd. Theme:
Inspection and coordination of quality, safety, progress and data implementation of the second phase B group project in 20xx year 165438+ 10. Question:
Engineering quality: the installation integrity of steel binding formwork is not good, and there are mistakes and omissions. The integrity of formwork installation is not good, and the concrete pouring process is not strictly implemented according to the plan, resulting in the deviation of wall column reinforcement and the damage of water and electricity embedded pipes. Safe and civilized construction: electricity consumption for temporary construction on the construction site, site sanitation, pile hole coverage, etc. Does not meet the specification requirements. Progress: the plan management is seriously lacking, and the project progress is lagging behind. Data: the data of the construction unit is lagging behind and out of sync with the field entities; The technical treatment plan is incomplete, the report is not timely, not targeted, and the information communication is not smooth.
Coordination conclusion:
1. It is forbidden for the construction unit to take care of the contract. Now that the quality inspector, safety officer, technician and water and electricity builder are all in place, civil builders are required to strengthen hierarchical management. Submit the project organization structure quality assurance management system and safety management assurance system before this Saturday, and implement the relevant responsibility system to the team within three days.
2. Party A and the supervisor participate in the hidden acceptance throughout.
3, supervision put forward rectification requirements, timely tracking inspection records rectification implementation, in strict accordance with the contract.
4. Before this Friday, the construction scheme of bored piles left over from buildings 13#, 14# and 24# was determined on site, and the construction of pile foundations left over from buildings 13#, 14# and 24# was completed this month.
5. Report the rectification plan for safe and civilized construction before this Saturday, and send it to the supervisor for review. If the rectification still fails to meet the contract requirements before 12 this month, it will be regarded as a breach of contract and linked to the review of progress payment.
6. Before this Saturday, confirm the hydropower related problems with the project owner, submit the hidden data of 8#, 9# and 25# before next Monday, and submit the special construction plan for hydropower and the inspection procedures for materials entering the site before next Wednesday.
7. Submit the monthly plan before next Monday.
8. The technical scheme and relevant visa determined on site shall be sent to the supervisor and the contractor in written form within 48 hours.
9. The information such as engineering contact list submitted by the construction unit shall be reported by the supervisor within 24 hours, and the owner shall reply within 24 hours.
10, the quality and safety technical disclosure meeting of the construction party was attended by the supervisor, and relevant information was collected.
1 1. Before 20th of this month, complete the engineering visa submitted to Party A in the early stage of xx construction.
Participants of the construction unit
Xx year xx month xx day
Participants in the supervision unit
Xx year xx month xx day
Participants of the construction unit
Xx year xx month xx day
This form is in triplicate, one for the construction unit, one for the supervision unit and one for the construction unit.
Minutes of Architectural Engineering Conference 7 Organizer: xxxx Architectural Engineering Co., Ltd.
Meeting time: XX, XX, XX, xx: xx in the morning.
Meeting place: company meeting room
Participants in participating units
Xxx, xxx, xxx, xxx, xxx, xxx, xxx, xxx, xxx, xxx, xxx, xxx, xxx, XXX, XXX, and so on.
Moderator: xxx
Recorder: xxx
On the afternoon of xx, xx, xxXX invited the above-mentioned project engineers and technicians to conduct the disclosure work for the x# building project of XX resettlement house after the opening of the year.
Conference content
Technical director xxx speaks:
Say goodbye to the old year and welcome the new year. The x# building project of xx resettlement house has passed the xxxx year safely and smoothly, and now it has ushered in a new xxxx year. I hope everyone will work together and make great achievements again! The follow-up work plan is as follows:
A, due to the increase of the company's projects, add a main builder (xxx) and a material buyer (xxx). The main builder is responsible for all the quality and safety of the project and the coordination between teams and groups. All the builders, safety officers and teams on site must obey the command of the main builder; Zhou Jianan is the main material purchasing department, and xxx and xxx cooperate and assist Zhou Jianan. All materials such as hospitality, tobacco and alcohol shall be purchased by the Material Purchasing Department. See the flow chart for details. Xxx takes overall responsibility.
Second, the construction plan:
(See attachment for details)
Third, strengthen the communication between the project and the team, conduct a thorough investigation of each team, and do a good job of daily workload statistics; Strengthen process management, strictly implement the regular meeting system, attend regular meetings on time, and put an end to unreasonable absence.
Fourth, carry forward the spirit of self-sacrifice and vigorously advocate the spirit of dedication. Project department personnel need to go to work on time. If they go out for something, they need to ask for leave from the person in charge. When the holiday project is under normal construction, the project department will not have a holiday.
The builder xxx speech:
A, communicate with the team after the adjustment of the construction scheme;
Second, if the scaffold is loose, it should be reinforced;
Third, the team members should arrive as soon as possible.
Xxx speaks:
The progress plan shall be implemented after being approved by the team.
Xxx speaks:
I upgrading, maintenance and repair of equipment;
Second, scaffolding needs padding;
Third, strengthen border protection.
Xxx speaks:
A, material procurement needs xxx, xxx to cooperate;
Second, strictly follow the procurement system.
Remarks: There is no doubt that the participants will discuss the above contents!
;