Current location - Quotes Website - Signature design - Commitment letter of performance
Commitment letter of performance
10 Performance Commitment Model

In our daily life, we use the letter of commitment every day, which is more binding than verbal commitment. What kind of promises have you seen? The following is my 10 performance commitment. Welcome to read the collection.

Performance Commitment 1 As the legal representative of the Company, I solemnly declare and promise that all the information and data provided in the Registration of Basic Information of Enterprise Construction in Hunan are true and valid; During the construction period in Hunan, this enterprise will strictly abide by the relevant laws, regulations and provisions of the state and Hunan Province, abide by laws and regulations, operate in good faith, and accept the supervision of construction administrative departments at all levels and relevant institutions. At the same time, we will fulfill the following commitments. In case of violation, the enterprise is willing to bear corresponding responsibilities and accept the punishment made by the construction administrative department according to relevant laws and regulations until it withdraws from the Hunan construction market. (This undertaking is made in duplicate, one for the provincial construction administrative department and the promisor)

Legal representative of the enterprise (signature)

(Official Seal of Enterprise)

date month year

1, not colluding with the construction unit or other construction enterprises, or seeking the bid by improper means;

2, do not provide forged (including "cloning"), altered official documents and related certificates, licenses, certificates or false information;

3, do not exceed the scope of the enterprise qualification level approved to undertake the project;

4. No construction is allowed without a construction permit;

5. The contracted project shall not be subcontracted or illegally subcontracted, and the qualification shall not be transferred or allowed to be linked by others;

6, seriously abide by the national mandatory standards for engineering construction and the relevant national safety regulations and technical regulations;

7, earnestly do a good job in the construction site safety protection, to ensure that there is no more than three engineering construction quality and safety accidents;

8, the construction site conforms to the requirements of civilized construction, does not affect the urban environmental sanitation;

9, to fulfill the obligation of engineering quality warranty;

10, do not lie, conceal or delay the report of engineering quality and safety accidents, protect the scene of the accident, and cooperate with the accident investigation of relevant departments;

1 1, and timely and accurately submit industry statistics to relevant project management departments.

12, relevant professional (executive) personnel and key positions are in place, and skilled workers who should hold relevant certificates should hold relevant certificates;

13, do not default or deduct the wages of migrant workers.

14. If a serious bad behavior record or a second or more general bad behavior record is published, its Hunan Construction Grade Certificate will be cancelled, and it is not allowed to apply for construction registration in Hunan Province within one year;

15. In case of a safety accident in Hunan Province, the construction registration certificate of Hunan Province shall be cancelled; in case of a general accident, the construction registration of Hunan Province shall not be applied for within one year; In the event of a major accident, it is not allowed to apply for construction registration in Hunan within three years; In the event of a serious accident, the company will withdraw from the Hunan market and will no longer apply for construction registration in Hunan.

16. Strengthen project management and control, ensure that the acceptance rate of projects under construction is 100%, and all of them will be established as provincial or municipal safety and quality standardization demonstration sites, otherwise no extension will be applied after the expiration of the validity period.

Sean Sub-district Office of the People's Government of Sujiatun District, Shenyang, China 2.

The bidder has carefully read the bidding documents of the first bid section (project name) of the supporting infrastructure project of COFCO's 300,000-ton rice deep processing project, and voluntarily participated in the bidding of the above projects. We hereby solemnly promise to the tenderee on the following related matters:

1. This bidder voluntarily completes this construction task according to the requirements of the bidding documents and the construction contract.

2. Abide by the laws and regulations of People's Republic of China (PRC), Liaoning and Shenyang on bidding, and consciously maintain the order of the construction market. Otherwise, agree to cancel the bidding qualification and accept the punishment.

3. Abide by the time schedule stipulated in the tender documents and the on-site discipline of relevant meetings. Otherwise, agree to cancel the bidding qualification and accept the punishment.

4. Accept all the contents of the tender documents. Otherwise, agree to cancel the bidding qualification and accept the punishment.

5. Ensure that the contents of the bidding documents are free from any falsehood. If it is found to be false during bid evaluation, it is agreed to deal with the invalid bid documents and confiscate the bid bond; If fraud is found after winning the bid, it is agreed to cancel the qualification of winning the bid and confiscate the bid bond, and accept the severe punishment given by the bidding administrative department according to law.

6. Ensure to submit the performance bond and sign the contract in accordance with the bidding documents and the bid-winning notice. Otherwise, agree to accept the penalty for breach of contract by the tenderer and confiscate the bid bond.

7. Ensure that all contents within the scope of the construction contract are completed according to the stipulations of the construction contract; Otherwise, the bidder will be punished by the tenderer for violating the promise, and its performance guarantee will be confiscated.

8. Ensure that after winning the bid, the project department (group) personnel will be sent to the project subject to tender as promised in the tender documents, and equipped with complete construction equipment. Otherwise, agree to accept the liquidated damages and confiscate the performance guarantee.

9. Ensure close cooperation with the construction unit after winning the bid.

10. Ensure that the adjustment of project cost is handled according to the principles stipulated in the bidding documents and the construction contract.

1 1. Guarantee not to participate in bidding and bidding. Otherwise agree to accept the most severe punishment from the construction administrative department.

The bidder will be bound by the tender documents and promise to modify the tender documents within the stipulated bid validity period and contract validity period. If there is any violation of the above commitments, we will consciously accept any punishment given by the construction administrative department in accordance with laws, regulations and relevant regulations.

Bidder (seal):

Legal representative (signature or seal):

Performance Commitment Letter 3 Project Name: Building Area:

Project address: Project cost:

Owner (Party A): Project Manager:

Employer (Party B): Tel:

In order to strengthen the supervision and management of the construction market, standardize the activities of the contracting parties of engineering construction projects, and protect the legitimate rights and interests of the state, collectives and parties, this undertaking is formulated in accordance with the laws, regulations and policies of the state on engineering construction.

Article 1 Commitments of Party A and Party B

(a) consciously abide by the relevant laws and regulations of the state and Anhui construction market and the current regulations and policies of huangshan district construction market.

(two) consciously obey the management and supervision of the competent department of construction in huangshan district.

(3) Consciously maintain the normal order of the construction market in huangshan district.

(four) found that the other party in the construction activities of illegal, illegal, in violation of the agreement, timely remind the other party or reflect to the competent department of construction.

Article 2 Commitment of the Construction Unit

(a) the construction period is less than one year, and the funds are not less than 50% of the project cost; If the construction period exceeds one year, the funds in place shall not be less than 30% of the project cost.

(2) Pay the project payment (progress payment) in full according to the way and time of the construction contract signed by both parties and the progress of the project.

(three) in accordance with the relevant provisions of the Measures for the Administration of Construction Contracts and Contract Valuation and the Interim Measures for the Settlement of Construction Project Price, the completion settlement shall be handled with the construction unit in a timely manner within the prescribed time limit.

(four) the detention of the construction project quality warranty gold shall not exceed 5% of the total project settlement, and shall be settled with the construction unit one year after the project is completed and accepted.

Article 3 Commitment of the Construction Unit

(a) strictly implement the principles and policies of engineering construction, as well as mandatory standards and norms related to construction and installation.

(two) in accordance with the provisions of the contract between the two parties, complete the project construction on schedule, with good quality and quantity.

(3) According to the Labor Law of People's Republic of China (PRC) and other relevant regulations, recruit migrant workers and sign labor contracts with them.

(four) to establish and improve the wage payment system for migrant workers, pay the wages of migrant workers in a timely manner, and not less than the local minimum wage, and shall not maliciously default on the wages of migrant workers.

Article 4 This letter of commitment, as an annex to the project construction contract, has the same legal effect as the project construction contract, and takes effect immediately after being signed by both parties.

Article 5 This letter of commitment is made in triplicate, one for each party and one for the District Construction Committee.

Commitment:

Unit of Party A: (Seal) Unit of Party B: (Seal)

Legal representative: (signature) Legal representative: (signature)

Address: Address:

Tel: Tel:

Year, month, sun, moon, sun.

Supervision department:

Huangshan District Construction Committee: (Seal)

date month year

Performance commitments Article 4 In order to strengthen the management of this project, strictly fulfill the construction contract signed with Party A, successfully complete this project, ensure the project quality, safety and construction period, and avoid the risk of labor and project payment recovery, as the contractor of XX project, I solemnly promise to the company as follows:

1. As the contractor of this project, I promise that I will always stay at the construction site from now until the date of project completion and acceptance, and carry out project management in strict accordance with the requirements of relevant project management and contract terms.

Second, it is agreed to pay the performance bond at the rate of ×× 10,000 yuan, and assume the usual management responsibilities in the construction process.

III. Strictly abide by the national safety production system, carry out the construction in accordance with the safety operation specifications, and do a good job in safety protection. According to the terms of XXX, I am willing to bear all the responsibilities and expenses arising therefrom.

Four, strictly abide by the national construction quality norms and standards, to ensure the quality of the project in line with the contract, if complaints or disputes caused by engineering quality problems, resulting in losses to the company, and ultimately borne by our company.

Five, strengthen the organization and management, scientific and standardized construction, to ensure the construction progress, such as losses caused by the delay in the construction period to the company, I voluntarily bear.

Intransitive verbs strengthen the awareness of contract performance evidence and ensure the integrity of project acceptance data and price settlement data. If the company suffers losses due to the loss or lack of construction materials, I am willing to bear it.

Seven. The ×× clause in the project contract stipulates that if Party B is found to be cheating, it shall compensate Party A for the loss of 3% of the total project price, and I am willing to bear it.

Eight, according to the terms of the contract, if I can't perform the contract as promised in the tender documents (including equipment and staffing), I am willing to compensate the corresponding losses.

Nine. Article XX of the contract stipulates that the information filled in by the contractor in the tender is an integral part of the contract documents, and the contractor shall fully fulfill its commitments. Otherwise, the contractor shall pay the liquidated damages to the owner according to the standard of ×× clause. If I can't guarantee the full performance of the agreement, I am willing to bear the compensation for breach of contract stipulated in the corresponding terms.

Ten, according to the law of employment, to ensure that the mount guard personnel have qualified certificates or qualifications, if the company losses due to violation of labor laws and regulations, I voluntarily bear.

11. Abide by laws and regulations, pay employees' remuneration in full and on time, and ensure that wages are not in arrears. If there are any complaints or disputes caused by labor disputes, which cause losses to the company, I will ultimately bear them.

Twelve, strengthen the safety risk control, to ensure that the construction personnel to buy safety insurance.

Thirteen. For matters not covered in this contract, I will voluntarily bear the liquidated damages of Party A..

My above guarantee is an unconditional promise, and I waive my right of defense when the company claims compensation from me.

Organizer (signature and seal):

date month year

Performance Commitment Article 5 On * * month * * of 20xx, a production dispatch meeting will be held in the project management department of * * contract section. * * Project Manager * *, Chief Engineer * *, Resident Engineer * * and Management Office * * of the Contract Section attended the meeting. According to the spirit of Fujii Expressway contractors' meeting and project management work meeting organized by the project office on July 10, 20xx, and the working goal of "working hard 100, vigorously promoting standardization construction", combined with the characteristics of tight time, heavy task, high standard and great difficulty of this project, the project manager * * represents the * * contract.

I. Pulling and hardening of vertical and horizontal construction access roads (steel trestles a2, a7 and a8) have been completed. The percentage of the total mileage of * * kilometers is * *, and the requisition of spoil ground has been completed (or it is planned to be completed on * * of 20xx). The whole contract section can be completed before 20xx * * to ensure concrete transport vehicles.

2. Construction of concrete mixing station, steel bar processing plant, small-scale cover slab prefabrication yard and beam slab prefabrication yard (attached with the plan of each temporary building)

The concrete mixing stations 1 and 1 are located at the pile number of * *, covering an area of * * square meters, the hardened area of * * square meters, the silo area of * * square meters, and the partition wall of * * meters high, which can store * * cubic materials. The mixer is of * * type, with an output of * * cubic meters per hour and * * sets.

The webmaster is * * *; No.2 concrete mixing station is located in pile * *, covering an area of * * square meters, with a hardening area of * * square meters, a silo area of * * square meters and a partition wall of * * meters high, which can store * * cubic materials. The mixer is a * * model, producing * * cubic meters per hour, * * concrete truck and * * concrete pump truck, which are mainly used for

2. The CNC steel processing machine arrived at the site on xx, xx, 20xx. 1 steel bar processing plant is located at the pile number of * *, with an area of * * square meters and a hardened area of * * square meters, mainly providing steel bar processing for * * structures. On * * month * day of 20xx,No. 1 steel processing plant team * was completed and put into use. The second steel processing plant is located in pile * *, with an area of * * square meters and a hardened area of * * square meters. Mainly for * * structure to provide steel processing. Completed and put into use before 20xx * *, the second steel processing plant has a team of * * * people, including * * skilled workers and * * factory director.

3. The small-scale cover plate prefabrication yard is located at the pile number of * *, covering an area of * * square meters and the hardened area of * * square meters. It was built and put into use 20xx years ago. There are * * people in the small cover panel team, and the person in charge is * * *. All small cover panels were produced in * * month of 20xx. 4. 1 Bridge Precast Yard is located at the pile number of * *, covering an area of * * square meters, with a hardened area of * * square meters, including * * T-beam bases and * * sets of T-beam templates, and * * T-beams are produced by * * bridges, with an average annual output of * * T-beams of 20xx. The average daily production of * * plates and beams was completed before * * day of * * year, and the first plate and beam was produced on * * day of * * month, 1 Liang Chang * * team.

The field length is * *; The second bridge prefabrication yard is located at * * pile number, covering an area of * * square meters, with a hardened area of * * square meters, including * * T-beam bases and * * sets of T-beam templates. * * * The bridge will produce * * T beams, and the average daily production of * * T beams will be completed before 20xx.

Three. Sign a contract for the supply of raw materials (the contract agreement is attached to the signed contract)

1. At present, there are * * steel manufacturers that have signed contracts, and there are * * companies that plan to sign contracts on * * of 20xx.

2. There are * * cement manufacturers that have signed contracts, and there are * * cement manufacturers that plan to sign contracts on * * in 20xx.

3. At present, * * manufacturers have signed the external additives, and * * manufacturers plan to sign the 20xx * *.

….

Four, subgrade earthwork construction arrangement

Subgrade 1 work area: the length of work area is * *, the site technical director is * *, and the site management personnel is * *, so it needs to complete * * million earthwork. The main supporting machinery includes * * excavators, * * loaders, * * bulldozers, * * road rollers, 65438+20xx graders and * * dump trucks.

Subgrade 2 work area: the work area is * *, and the on-site technical director is * *, which is used for on-site management.

* * Personnel, * * The main machines that need to complete * * 10,000 earthwork are: * * excavators, * * loaders, * * bulldozers, * * road rollers, 1 graders, * * dump trucks ... It is estimated that earthwork will be completed every month and every day for 20xx years.

….

Five, the bridge pile foundation and substructure construction arrangement

1 team, bridge pile foundation and substructure 1 team: team leader * *, site technical director * *, site management personnel * *. * * * There is a * * bridge with a * * pile foundation, * * * needs a * * drilling rig, and the existing * * drilling rig is planned to arrive at the * * drilling rig on * * month, * * * needs * * kilowatts of electricity, and the temporary electricity consumption has been completed (or connected) * * kilowatts, and the self-provided generator set is * *. * * * There are * * caps, * * piers, * * capping beams and * * caps on the bridge substructure. * * * has * * equipment: * * crane * * platform, formwork * * square meters, steel pipe support * * tons.

2. The second team of bridge pile foundation and substructure: the team leader is * *, the on-site technical director is * *, and the on-site management personnel is * *. * * * There is a * * bridge with a * * pile foundation, * * * needs a * * drilling rig, and the existing * * drilling rig is planned to arrive at the * * drilling rig on * * month, * * * needs * * kilowatts of electricity, and the temporary electricity consumption has been completed (or connected) * * kilowatts, and the self-provided generator set is * *. * * * There are * * caps, * * piers, * * capping beams and * * caps on the bridge substructure. * * * has * * equipment: * * crane * * platform, formwork * * square meters, steel pipe support * * tons.

Six, circular pipe culvert, cover channel construction layout

1, round pipe culvert: the team leader is * *, the technical director is * *, the site construction personnel is * *, * * needs to complete * * round pipe culvert, and the existing equipment is * *, which is planned to be completed every * * days1; The leader of the second group is * *, the technical director is * *, and the on-site construction personnel are * *, so it is necessary to complete * * circular pipe culvert, and the existing equipment is * *, and it is planned to complete 1 culvert every * * days.

2. Cover channel: the team leader is * *, the technical director is * *, and the site construction personnel are * *, so it is necessary for * * to complete the cover channel. The existing steel formwork is * * square meters and the steel pipe supports * * tons. It is planned to complete foundation 1 and wall 1 every * * days. The second team leader is * *, the technical director is * *, and the site builder is * *, so it is necessary for * * to complete * * to cover the passage. The existing steel formwork is * * square meters and the steel pipe supports * * tons. It is planned to complete foundation 1 and wall 1 every * * days.

….

VII. Commitments for unfinished construction tasks

If the above commitments are not completed on the time node, I voluntarily invite the legal representative of the unit to Fuji Project Office and Section A Project Management Office on **20xx to explain the reasons and make reasonable adjustments to the organizational structure and construction organization design of the project management department. If the site has not been greatly improved within 20 days after the arrival of the legal representative, and it has not been recognized by the supervision engineer, I will request the headquarters of * * Company to change the project manager and leave Fuji Expressway automatically on the grounds that I am not competent for the employee.

Commitment: (signature)

Reference:

Letter of Commitment for Performance Article 6 In order to better implement the standardized management of safety production in project law construction, fully control the occurrence of major casualty accidents, ensure the safety of employees and prevent the state and collective economy from suffering losses, the policy of "safety first, prevention first" is earnestly implemented in accordance with national, provincial and municipal regulations on safety production, and the first phase of "Donghe Yujinwan" project in Guangyuan City is ensured to be a civilized and standardized chemical site in Mianyang City. My construction labor team promises:

A, strictly implement the building construction safety inspection standard (JGJ59-99) and the Supplementary Provisions on Safe and Civilized Construction, the building construction safety production inspection standard, safety production technical specifications and operating procedures, so that the safety team's production and civilized construction can reach excellent standards.

Second, in the process of construction, our team consciously abides by the safety operation procedures and the safety production responsibility system and safety rules formulated by the company and the project management department, and does not command illegally or take risks; Seriously do a good job in safety education at the team level, and assist the project management department and the company to carry out safety education at the company level and the project level.

Three. Ensure that no safety accidents (including near misses) occur during construction. Safety indicators: zero death, zero serious injury and zero general minor injury. When a safety accident occurs, it shall be handled according to the labor contract and occupational health, safety and economic responsibility contract signed with the project management department.

Four, do a good job in safety education and safety technical disclosure, regularly carry out safety team activities, give full play to the initiative, put forward predictive questions to the project department before construction, put forward methods, formulate measures, do a good job in prevention, nip in the bud.

Five, organize the team workers to learn and be familiar with the "technical regulations for safety in construction engineering" and related safety regulations.

Regulations, rules and regulations, workers of various professional types are familiar with the safety technical operation procedures of this type of work, workers who do not understand the safety technical procedures and safety objectives are not clear, and workers who have not received safety technical education are not allowed to participate in the construction work of this team. During the construction period, the education rate of workers will be guaranteed to be 100%.

Six, the construction site materials neatly stacked, beautiful, safe, all kinds of materials piled up and transported shall not exceed the prescribed height and weight.

Seven, in the construction subject to all safety inspection, supervision and decision.

Eight, in the construction, if you don't follow the safety operation procedures, relax safety awareness, illegal operation, the resulting safety accidents shall be borne by our team.

Nine, this letter of commitment in duplicate, the project intends to, our team each hold a copy.

Construction service team:

The first person responsible for production safety:

Second person responsible for production safety:

date month year

7 Zhangqiu Municipal Government Procurement Center Performance Commitment Letter:

If we win the bid for street lamp equipment (not ZQDL-20xx-008), our unit promises to fulfill all the responsibilities and obligations before signing the contract according to the requirements of the bid-winning notice after receiving the notice of winning.

If we breach the contract, we are willing to pay you 30% of the amount involved in the breach of contract as liquidated damages within 5 days; We are willing to obey the opinions on handling the facts of breach of contract and promise to bear all the consequences and responsibilities caused by our breach of contract.

Hereby promise!

Bidder ((official seal): Yangzhou Xinghui Lighting Co., Ltd.

Authorized person/agent (signature or seal):

Tel: 05 14-4xxxxx 99

Chuan Zhen: 05 14-4xxxxx 99

Date of commitment: April 20, 2000.

8 Zhangqiu Municipal Government Procurement Center Performance Commitment Letter:

If we win the bid for street lamp equipment (not ZQDL-20xx-008), our unit promises to fulfill all the responsibilities and obligations before signing the contract according to the requirements of the bid-winning notice after receiving the notice of winning.

If we breach the contract, we are willing to pay you 30% of the amount involved in the breach of contract as liquidated damages within 5 days; We are willing to obey the opinions on handling the facts of breach of contract and promise to bear all the consequences and responsibilities caused by our breach of contract.

Hereby promise!

Bidder ((official seal): Yangzhou Xinghui Lighting Co., Ltd.

Authorized person/agent (signature or seal):

Tel: 05 14-4xxx999

Chuan Zhen: 0514-42xxxxx9

Commitment date: April 20, 2006

Performance commitment Article 9 Fire control works are composed of fire alarm system, automatic sprinkler system and fire hydrant system. With the aim of "reasonable price, quality assurance, excellent service and reputation first", relying on the strict internal management of the company, we will carry out technical checks in accordance with relevant specifications, carefully organize construction plans and personnel, and ensure the project quality to be completed on schedule. And on this basis, make the following service commitments:

1. The price of equipment and materials provided by this project and the rate of installation and commissioning are calculated according to the most favorable charging standard based on the 20xx quota.

2. In the process of engineering construction, if there is any contradiction or inconsistency between the engineering drawings and the relevant fire protection codes, timely point out and put forward reasonable suggestions to Party A and the design department, and then carry out the construction after approval, so as to make the engineering materials and labor force get the most reasonable configuration.

Three. In the process of fire control audit and declaration of this project, if there are any specific problems that are difficult to solve, our company will assist Party A to handle them reasonably and properly, so as to meet the requirements of the code, solve the specific problems, and obtain the unanimous opinion of all parties.

Four, after the completion of the project, our company is responsible for fire detection declaration (declaration form and other information will be filled in by you with the assistance of our company) and submitted to the relevant fire supervision department for acceptance.

Five, after the project completion acceptance and delivery, our company is responsible for the free repair and maintenance of fire control facilities within two years to ensure the normal operation of the equipment. After receiving the fault notice, send someone to eliminate it within 24 hours and patrol once every quarter.

Six, after the completion of the project, Party A is responsible for the operation of fire control facilities, and compulsory training for management personnel, imparting professional knowledge, so that they can operate correctly and eliminate common obstacles.

Seven, to assist the operation and management personnel to formulate the maintenance and maintenance system of fire control facilities.

Performance commitment letter 10 xxx:

My unit voluntarily participates in the bidding of XX-XXX-XXX-X project, and guarantees that the qualification certificate, business license, professional title and qualification certificate, performance or relevant supporting documents provided by my unit are true and effective. Ensure that there is no collusion in bidding, bid buying or bid selling.

If we are lucky enough to win the bid, in the process of project construction, our unit must make scientific planning and elaborate organization to ensure the construction period, quality and safety, and ensure that all the main personnel (including project manager, project technical director, builder, quality inspector, safety officer and other management personnel and technicians) promised in the tender are in place on time, and shall not leave at will without the consent of the owner; Ensure that the main construction machinery and equipment of this contract project are put into the construction site according to the time promised in the tender; Ensure that the winning project is not subcontracted illegally, and accept the inspection and supervision of the owner and his representative at any time.

If our company violates any of the above commitments during bidding and project implementation, we are willing to accept the penalty of confiscation of bid bond or performance bond, unconditional withdrawal and other penalties from the owner.

Bidder: xx (seal)

xxx

Date: 20xx year x month x day