unit project name unit quantity
division project name construction unit
unit project name, Site self-evaluation date
self-evaluation opinions of the construction unit 1. Self-evaluation opinions:
2. Self-evaluation quality grade:
Final inspection personnel (signature)
Supervision company's random inspection opinions:
Supervision engineer (signature)
Joint team's verification opinions 1. Verification opinions:
2. Quality grade:
years. Reservation
(signature)
List of reference materials (1) Geological catalogue □
(2) Measurement results□
(3) Test report (core test, soft foundation bearing capacity test, Structural strength, etc.) □
(4) Other ()□
joint
small
group
into
member company name position, Signature of professional title
project legal person
supervision unit
design unit
construction unit
operation management
Note: the design unit should send geological engineers to participate in the acceptance of important concealed unit projects. All items involved in the list of reference materials should be marked with "√" in the "mouth". If there are other materials, the name of the materials should be indicated in brackets.