How to carry out fire inspection and acceptance, and what matters should be paid attention to?
I. The following materials shall be provided when applying for fire control acceptance:

(a) the construction project fire inspection declaration form;

(two) the project completion acceptance report;

(three) the quality certificate of fire protection products;

(four) the building components, building materials and interior decoration materials with fire performance requirements meet the national standards or industry standards and the factory certificate;

(five) fire facilities, electrical fire prevention technology inspection documents;

(six) the legal identity certificate and qualification certificate of the construction, project supervision and testing unit;

(seven) other materials that need to be provided according to law.

Second, the fire acceptance considerations:

1, the requirements put forward during fire control audit should be fully met;

2, automatic fire control facilities have been tested, and in good condition and effective;

3. Safe evacuation meets the specification requirements;

4. The quality of fire protection products is qualified and the quantity is guaranteed;

5, decoration materials conform to the requirements of the specification;

6, flammable and explosive settings meet the requirements;

Third, the fire acceptance process:

1, after the completion of the construction project, the construction unit shall apply to the public security fire control institutions for fire control acceptance of the project completion, and it can only be put into use after passing the acceptance.

2. After accepting the case, the public security fire control institution shall check whether the information meets the requirements. If it does not meet the requirements, it shall promptly inform the applicant to complete it, and notify the construction unit to make relevant preparations before acceptance 0-2 days before acceptance.

3, according to the provisions of the fire engineering acceptance procedures, by not less than two fire supervisors to the scene for acceptance, to participate in the acceptance of the fire supervisor should be dressing the, wearing a public security fire supervision and inspection certificate, the specific acceptance procedures are as follows:

(1) Introduction of all units involved in the acceptance. The construction unit introduces the general situation of the project and self-inspection, the design unit introduces the design of the fire protection project, the construction unit introduces the construction and commissioning of the project, the supervision unit introduces the project supervision and the testing unit introduces the testing situation.

(2) Organize on-site inspection and acceptance. Acceptance personnel should check and test at the same time, and truthfully fill in the fire acceptance record form.

(3) Summary and acceptance. Each team shall report the acceptance respectively, and make an evaluation according to the Guangdong Provincial Fire Protection Acceptance Evaluation Rules (Trial) formulated by the Corps, and truthfully record the evaluation conclusion in the acceptance record, and put forward preliminary opinions to the construction, construction, design and other participating acceptance units, and timely put forward rectification opinions to the construction unit if it does not meet the requirements of the specification.

4, to participate in the acceptance of the construction, construction and design units to express their opinions or ask questions, fire control institutions acceptance participants should give a reply, can not be answered on the spot should be given instructions.

5, fire engineering acceptance or review, all units to participate in the acceptance of personnel and fire control institutions to participate in the acceptance of personnel to sign the acceptance declaration form.

6. The project acceptance organizer shall fill in the acceptance opinions in time, submit the batch form, organize the acceptance files and send them to the leaders for approval.

7, the construction unit issued a receipt to the window, to retrieve the acceptance opinions;

8. When the acceptance review is unqualified, the construction unit shall organize all relevant units to carry out rectification according to the problems raised in the "Opinions on Fire Control Acceptance of Building Projects", and re-apply to the fire control institution handling the case for re-inspection after rectification. The re-inspection procedure is the same as the application acceptance procedure.

9. If the acceptance of the construction project is unqualified, the application materials will not be returned. When applying for reinspection, the application materials are the same as the normal application and acceptance materials.