Zibo Municipal Infrastructure Project Completion Acceptance Record Form Format
Construction Management Completion Acceptance Certificate Table 2 Project Name zhoucun district East Street Reconstruction Project Commencement Date April 2, 2008 Project Quality Evaluation During the construction process, the construction was organized in strict accordance with the drawing design and change requirements and technical specifications for municipal road construction. In order to ensure the quality of the project, all relevant units carry out strict pre-control and control from seven aspects: (1) establish and improve the quality assurance system; (2) quality plan precontrol; (3) Pre-control combat readiness; (4) Pre-control the production factors; (6) measurement management; (6) Construction quality inspection; (7) Quality inspection and testing. Quality control information is complete. Appraised by relevant units and companies, the project can meet the requirements of structural safety and use function, reach the excellent standard of "Quality Inspection and Evaluation Standard of Municipal Road Engineering" CJJ 1-90 "Quality Inspection and Evaluation Standard of Municipal Drainage Pipe and Canal Engineering" CJJ 3-90, and is rated as an excellent project. Completion date of construction unit Zhoucun Municipal Engineering Company on June 30, 2008 Contract cost (ten thousand yuan) 6,543.8+0,000 construction final accounts (ten thousand yuan) Acceptance scope and quantity: the reconstruction project of the north section of Zhoucun East Street (0+000-0+465.5) has a total length of 465.5m, with three boards in cross section, motorways 10.5m and sidewalks. Two φ400 reinforced concrete pipes are newly built, with a single length of 4 10m, socket joints and 30 sewage inspection wells. Date of completion inspection and acceptance: participated in the opinions of the completion inspection and acceptance unit. Signature of the construction unit: (Seal) Signature of the design unit: (Seal) Signature of the supervision unit: (Seal) Signature of the construction unit: (Seal) Problems and solutions: No signature of the survey unit: (Seal) Signature of the inviting unit: (Seal)