Current location - Quotes Website - Signature design - Decoration Design Cooperation Agreement
Decoration Design Cooperation Agreement

Party A:

Party B:

Party A’s responsibilities

1. Party A provides customer resources or design projects to Party B

2. Party A pays the design fees on time. During the design or construction process, if Party A fails to pay the design fees on time, Party B has the right not to follow up on the project

3. Party A submits to Party B Make clear written review opinions on the drawings, and sign and confirm the finalization of the staged drawings

4. Party A shall fully respect the work results of Party B and shall not arbitrarily change the signed and confirmed design and construction drawings. If changes are necessary for special reasons, Party B should be notified in advance, and the plan will be revised after both parties agree to negotiate. If changes are required, Party B shall additionally pay the design fee for this part of the project volume.

Party B’s responsibilities:

1. Party B must produce plans and drawings on time according to the drawing time schedule. If the drawing time is delayed due to Party B’s unilateral reasons, each day of delay will be Party B shall pay 0.1% of the total contract amount. Pay liquidated damages to Party A.

2. Party B shall dutifully provide design suggestions to Party A and do its best to complete the design.

3. During the construction process, Party B shall closely cooperate with the construction and be responsible for quality supervision and process guidance of the construction work.

4. It is not allowed to modify the construction plan during the construction process. Strictly select materials and the construction level standards of the construction team to ensure that the project achieves the design effect.

Cooperation method 1:

p>

After Party A provides the design project or customer resources, Party B will use its own independent resources to follow up and design. For the design project entrusted by Party A, the base price is about 60 yuan/square meter and the design fee will be charged (charged to Party A). External customers will be charged the actual project design fee (charged to the customer). Party B and Party A will share the profits in proportion (Part B’s share 70%, Party A accounts for 30%), during which Party A is obliged to provide certain company qualifications and other resources to assist Party B in completing the design project (mainly for external customers)

Cooperation method 2:

< p> Under the premise of cooperation mode 1, Party B will be stationed in Party A's company to work together, and jointly build the company, making the company's external influence greater. Party A provides necessary office conditions to Party B, and Party B pays Party A a certain amount of affiliation fees. Internal administration is independent and external administration is unified.

The following content is supplementary content to the agreement:

Design scope and content:

1. Interior decoration scope: main space renderings scheme design, each main space elevation Area drawing and construction drawing design and civil water and electricity system drawing design.

2. Professional designs such as indoor fire protection systems, air conditioning and ventilation systems, kitchen equipment systems, professional water circulation purification systems, audio broadcasting and other weak current systems are not included.

3. It does not include reconstruction or illegal construction of civil or metal structure designs.

Design, construction follow-up and supervision stages:

Phase 1: Scheme design

Party B must consult Party A to clarify project parameters, Party A’s goals and Other requirements include researching the project style design concept, etc., and preliminarily determining the preliminary plan. The owner must sign to confirm the functional layout plan and the project space theme style positioning content.

a. Draw preliminary floor plan, hand-drawn schematic diagram and design concept copy to express the interior design concept.

b. Based on the floor plan signed by Party A.

c. The time is approximately valid working days.

The second stage: Plan in-depth design stage, carry out rendering design

a. Carry out plane in-depth design and rendering design according to the design direction copy signed by Party A.

b. The time is about effective working days.

c. (__) main space renderings.

d. The final decision must be signed and confirmed by the owner.

The third stage: construction drawing stage

a According to the plan determined by both parties, carry out detailed design and produce drawings

b, the time is about __ effective Working days

c. Drawing content: floor plan, ceiling plan, masonry drawing, floor paving drawing, switch and socket positioning drawing; the final decision must be signed and confirmed by the owner, and the drawings in the deepening design stage of the plan are in the form of A3 paper submit.

d. The final construction drawing must be signed and confirmed by the owner.

The fourth stage: construction follow-up and supervision stage:

a. Party B shall provide Party A with a full set of construction drawings in triplicate; on the premise of meeting the project design standards, Party B shall Obliged to assist Party A in reviewing the budget, construction schedule, and construction process of the construction unit, and provide relevant suggestions to ensure the smooth progress of the project.

b. Provide phased design guidance based on the actual construction conditions on site;

c. After the hard decoration project is completed and cleaned, soft decoration will be provided after all furniture and accessories are admitted. On-site decoration guidance service is provided once, with the participation of the chief designer and soft decoration designer.

Design fee and payment method:

1. Design fee:

1. Both parties negotiate to complete all the work within the scope of this design contract, with a total price of RMB 10,000. Yuan, the unit price is Yuan/square meter. If there is any increase or decrease during the design process, separate agreement will be made.

2. The above fees do not include stamp fees, management fees and taxes for design qualifications.

3. The above design fees do not include any form of consumption deposit.

2. Payment method:

(1) After the contract is signed, Party A pays Party B __% of the total design fee, which is __ million yuan;

(2) After Party B completes the second design stage (rendering), Party A will pay Party B __ % of the total design fee, which is __ million yuan;

(3) Party B After completing the third design stage, Party A will be provided with a full set of construction drawings in triplicate, and Party A will pay Party B __% of the total design fee, which is __ million yuan;

(4) The project is completed and opened for business Within the next 10 working days, Party A will pay Party B the entire balance of the total design fee __%, that is, __ million yuan.

Party A: Party B:

Signature (seal) of legal representative: Signature (seal) of legal representative: