There are 5 models and templates for engineering construction work summary.
Time is like running water, gone forever. We are growing day by day. We have to start writing a summary, too. Can better calmly face the next stage of work. So how can we write an excellent work summary? Maybe you are looking for something like "A Complete Collection of Engineering Construction Work Summary Models and Templates". Welcome everyone to read the collection and share it with people around you!

Summary of engineering construction work: 1. 1. The unity of understanding has laid a solid ideological foundation for engineering construction.

(A) the unity of understanding of the company's leadership team has added confidence and determination to win the project construction. The construction of the West-to-East Gas Pipeline Project is a severe test and challenge for the petroleum construction team that has never participated in the construction of large-diameter pipelines. The leading group of the company also fully realized that only by building this project into a boutique project and a brand project can the company embark on the road of diversified development, seek new economic growth points for the company's development, and step into the benign road of sustainable development. So there was a decisive decision of "brand first, benefit second, and all work should give the green light to the west-east gas transmission". From the preparation of the project department to the smooth completion of the project, no matter from the deployment of manpower, material resources, financial resources and equipment, it has received the cordial care of the company leaders and the full support of all departments. During the project construction, members of the company's leadership team visited the site for many times to express their condolences to the inspection and guidance work, and timely coordinated and solved the difficulties and problems encountered in the construction. It has added confidence and determination to win the project construction.

(2) The unified understanding of the personnel of the project department has enhanced the collective sense of honor and mission of the participating employees.

From the first day of the establishment of the project department, the project department has educated the employees who participated in the war and strengthened a belief that no matter how difficult it is, we must fight this battle well, win honor for the headquarters and reassure the company leaders. This belief runs through the whole process of project construction. Let every employee do his best and devote himself to the project construction. On June 27th, the groundbreaking ceremony of the fourth and fifth sections of the West-East Gas Pipeline was an unforgettable day for all the staff of the project department. Since we didn't undertake the construction task alone, we can only attend the groundbreaking ceremony as an operating unit, and we can't display any flags and signs. Although the headquarters leaders tried their best to strive for the next step and displayed the banner of our company, every employee in the project department was greatly shocked and felt humiliated. This fully shows that if you don't do it, there will be no position, and no matter how excellent your technical strength is, you will be beaten and suffer indignities. Through this small setback, you have strengthened the belief of all the staff in the project department to fight this battle well, and you must prove your strength with practical actions. As long as you give the opportunity, you will certainly create impressive achievements. Facts have proved that we have not failed to live up to the trust of leaders and the expectations of oil builders, and the achievements have also made the main force of pipeline construction sit up and take notice.

Second, unite as one, work hard and strive for first-class performance.

(a) careful planning, high standards, strict requirements, to create a first-class camp.

The West-to-East Gas Transmission Project has higher requirements for the construction of construction camps. If the camp is not set up according to the standard, and the acceptance is unqualified, it will never be allowed to start. Therefore, as early as April, the project department organized manpower to plan the setting of the construction camp, went to the site for six times, drew the layout of the camp, rationally laid out the barracks, offices, living quarters and auxiliary facilities, carefully divided the locations of facilities, garbage bins, sewage pools and emergency passages, and even unified the bedding and daily necessities of the staff dormitory. At the same time, the camp has been improved and revised. In order to reflect the characteristics of high standard and high starting point, the company also invested more than 300,000 yuan to transform and decorate 28 camping rooms, conference rooms and bathrooms. More than 260 colorful brocade with strong corporate culture atmosphere were drawn. It took only 20 days from April 25th, XX to May 65438+May 5th. According to the planning, a management and construction camp with complete facilities, neatness, exquisiteness and convenient life was built in Lop Nur, a hundred miles no man's land. On May 26th, it passed the acceptance of Korla Supervision Branch, and no unqualified items were found. It has been highly praised by Korla supervision office, foreign supervision office and leaders of West-East Gas Transmission Company.

(2) Strict and scientific intensive training has built a platform for further improving the comprehensive quality of employees participating in the war.

In order to realize the goal of building the West-to-East Gas Pipeline Project into a high-quality and brand-name project. More than 50 managers and construction operators with high professional quality and exquisite technology are transferred from the whole company to form the project department. As a young team that has never participated in the construction of large-diameter pipelines, it knows nothing about the technical requirements, construction standards, completion acceptance and other standards of pipeline construction, so the project department tried its best to collect and sort out a set of standards. From May 25th to June 25th, it took more than one month to study more than 30 management systems and process specifications in stages and levels. In order to integrate theory with practice and adapt to site construction as soon as possible, the project department conducted intensive training on simulated site to enable operators to master construction methods and processes in actual operation. In order to further consolidate and improve the technical level, operators were organized to observe, learn and communicate at the construction site of China No.1 Pipeline Company, the main force of pipeline construction, and good results were achieved. In order to strengthen the style construction of the construction team and achieve the goal of semi-military management, during the training period, a five-day military training was also conducted. Through these intensive trainings, the cohesion, combat effectiveness and technical level of the project department have been improved as never before.

Summary of engineering construction work 2 I graduated from Shanxi Communications Technical School in 20xx, and have been engaged in highway engineering construction and supervision since graduation. He has participated in the construction of Wuzi Expressway, Lanshang Expressway, Xinfu Expressway, Wangcheng Expressway, Xingfen Expressway and Zhao Yong Expressway. From 20xx to 20xx, he participated in the correspondence study of Central Radio and TV University, and from 20xx to 20xx, he participated in the correspondence study of Dongbei University of Finance and Economics. In 20xx, I was named as an assistant engineer. My professional and technical work is summarized as follows:

I. Main work performance

In 20xx, I participated in the construction supervision of subgrade, bridge and culvert engineering of Wuzi Expressway as a supervisor. This is my first project since I joined the work. At the beginning of the project, the company leaders put forward high requirements for the personnel of our supervision department. Everyone at the scene represents the quality and image of the company's employees. For the sake of the company's reputation, in strict accordance with the requirements of the specification, in the process of supervision, I implemented all-round, all-weather and whole-process supervision, especially for concealed works, never letting go of every link, leaving no hidden dangers, and handling problems in the bud. I successfully completed the supervision task arranged by the leader. I have accumulated some supervision theories for myself in subgrade, bridge and culvert, and groped for and summarized some construction experience.

From August of 20xx to February of 20xx, 12, worked as the construction supervisor of highway subgrade, bridge and culvert engineering in Shaanxi Lanshang Expressway, Xinfu Expressway and Wangcheng Expressway. In the process of supervision, familiar with the design drawings of the project in charge, clear all kinds of engineering design parameters, refine the inspection of concealed works, and put an end to quality hidden dangers; Seriously study and master the inspection standards and norms, and clarify the guiding ideology in practical work. For the quality control in the process of engineering construction supervision, especially for the control of safe and civilized production, we must achieve "four diligence" (finding problems in advance); Walking frequently (patrolling and checking); Keep your mouth shut (talk more and ask more questions when you find problems); Manual attendance (make relevant records in time and issue a written notice). For the construction of key parts of the project, it is necessary to arrive at the station in advance, check the construction preparation work, and make a written record of the station in time and completely. Do a good job in daily patrol, inspection and inspection of each process of general construction. To conduct a comprehensive quality management of the construction unit, the project department is required to establish and improve the quality assurance system, so as to ensure that there are reports on commencement, measures for construction, positioning review for technical disclosure, tests on materials and equipment, records on concealed works, quality inspection and information on completion. The project quality is guaranteed, and all projects have reached excellent quality after handover and acceptance.

20xx works as an assistant subgrade engineer in Wangcheng Expressway. Combined with previous supervision experience, I have a new understanding of the project. During the days and nights of 1 years, I devoted all my energy and enthusiasm to the project supervision. Ideologically, we should further establish a sense of responsibility as a master, love our jobs, promote enterprises, decline enterprises, shame enterprises, serve the construction units enthusiastically, be strict with ourselves and ensure the quality and progress of the project. For indoor data, it is required to keep pace with the project, avoid the missing items and distortion of the data as much as possible, and classify and standardize the data according to the data sorting method. In the process of project construction supervision, the workload is heavy, the construction period is tight, the quality requirements are high, and the local interference is great. I overcame many difficulties, carefully organized and arranged, humbly asked the director and actively communicated with the construction unit. As a bridge engineer, I strictly examine and approve the construction design of various sub-projects, personally check the quality of formwork, reinforcement and concrete in key parts, and carefully explain the technical requirements to the supervisor. If it doesn't meet the requirements, I will call the technical staff of the construction unit to find out the reason. Diligent, quality is guaranteed, and quality is sought.

Since 20xx, I have worked as a subgrade engineer and a bridge engineer in Xingfen Expressway and Zhao Yong Highway. In the process of project construction supervision, the workload is heavy, the construction period is tight, the quality requirements are high, and the local interference is great. I overcame many difficulties, carefully organized and arranged, humbly asked the director and team leader, and actively communicated with the construction unit. As an engineer, I strictly examine and approve the construction design of each sub-project, personally check the key parts, and carefully explain the technical requirements to the supervisor. If it doesn't meet the requirements, I will call the technical staff of the construction unit to find out the reason. Diligent, quality is guaranteed, and quality is sought. Bridge and culvert structure inspection, subgrade construction lofting supervision, concealed engineering review, elevation control supervision. Work conscientiously, conscientiously complete the work assigned by the director's office, actively cooperate with the construction unit, unite and cooperate, and ensure the project quality and progress meet the requirements of the management office.

Second, the professional learning situation

Technical level is the foundation of our work. Today's engineering construction technology is changing with each passing day, and new materials, new equipment, new processes and new technologies are applied rapidly. Supervisors can't be competent for supervision work if they can't improve their professional level and study hard. I know that my theoretical foundation is still weak, and I have carefully examined the existing problems from the aspects of thought, work and life, so I have carefully studied the learning materials issued by the company and given me a profound education. On this basis, I comprehensively reviewed my thoughts and work style by studying the company's study materials carefully, combining my own work practice, my own actual situation and the principle of seeking truth from facts. Always keep a clear head and be firm and unambiguous; Attitude is not enthusiastic; Act unswervingly; Stand firm. In daily work, resolutely resist all kinds of decadent ideas, and strive to suffer hardships first and enjoy them later. Study hard on professional technology and construction supervision knowledge, constantly improve the level of business and supervision, and do not disclose matters that all parties to the supervised project think need to be kept confidential.

Put personal interests above collective interests, act according to the rules, seriously abide by the company's rules and regulations, seek truth from facts, and not be lazy. Strengthen self-construction, strict requirements and self-pressure. Always maintain a positive and enterprising spirit, consciously obey and serve the overall situation in the work, consciously link your work with the overall situation, adhere to high standards and strict requirements, strive to do your job well, and successfully complete the tasks assigned by the leaders. Besides correspondence study, I also attended several short-term trainings, covering experiments, safety and so on. I usually read as many books and papers related to my major as possible. In a word, I use all my spare time to enrich my professional knowledge and be a qualified supervisor. In order to adapt the professional technical level and professional technical working ability to the development of highway construction, I need to continue to learn professional technical knowledge, constantly sum up experience, constantly enrich my professional theoretical level and practical construction ability, push my professional technical position to a new level, and do my duty for the development of highway construction.

Project construction work summary model encyclopedia III. Basic situation of the project:

1, project scale: (List the main quantities of each sub-project according to the measurement results-see attached table)

2. Project address: No.39, Agricultural College Road, Qinghe East Road (Mengdumei Factory Building, Wall, Office Building)

3. Contract term: 20xx years x months x days.

4. Contract cost: 43,4301.14 yuan (note: after completion acceptance, it will be settled according to the reduced total price 10%).

Second, the contractor

Construction unit Panyu District Agricultural Institute

Supervision unit: Guangzhou Jianfa Supervision Co., Ltd.

Construction unit: Century Construction Engineering Co., Ltd., person in charge: Zeng.

Third, the construction management

Our company immediately set up a project management department to be responsible for the construction organization and management of the whole bid section from the date of being entrusted by the Institute of Agricultural Sciences. In order to complete the project task on schedule with good quality, we prepare a detailed construction organization plan in time according to the design drawings and relevant contract documents, and make technical disclosure to the construction personnel of this project, and adjust the construction plan in time according to the actual situation to ensure the project is completed on schedule.

During the construction, construction technicians are required to be familiar with the design drawings, and their responsibilities are disclosed during the construction. At the same time, through professional ethics education and the use of economic leverage, the enthusiasm of the construction team is fully mobilized, and the project progress and economic benefits are pursued on the basis of ensuring quality.

Iv. major construction projects

1, material: putty ash, Nippon paint.

2. Construction features: spraying, railing painting and star tile flour brush.

Five, the project schedule control:

The progress of this project is carried out in an orderly manner as planned, and the construction tasks are completed within the contract time limit. The contract duration is 0 calendar days and the actual duration is 50 calendar days. There is no delay in the construction period of this project. Completed on 20xx, x month, x day.

Item quality of intransitive verbs

During the construction of this project, we strictly implement the quality management system from beginning to end, that is, the self-inspection of the construction personnel, the inspection of the company's quality inspectors, the signature of the supervision engineer's spot check and acceptance, and strengthen the inspection and test, which fundamentally ensures the construction quality.

Seven, safety construction measures

In the engineering construction, our company firmly established the idea of "safety first, prevention first", established and improved the project safety production system, set up a safety production leading group, and gradually established a safety production responsibility system, forming a powerful safety production guarantee measure to find and eliminate unsafe factors at any time. At the same time, each sub-project has formulated a careful technical scheme for safe production. After the team enters the site, the team members are provided with complete technical disclosure and three-level education, and regular safety education and safety inspection activities are conducted. During the construction of the main structure, due to strict measures, no safety accidents occurred and the accident rate was zero.

To sum up, due to our strict measures and proper management in terms of quality, safety and civilized construction, we attach importance to the supervision and strong cooperation of relevant leaders, design institutes, Jianfa supervision companies, town quality supervision service stations, town dress project management team and relevant personnel of the Academy of Agricultural Sciences, the project construction has been effectively guaranteed in all aspects, and the construction is progressing smoothly. Our self-evaluation of this project is qualified, and we are now applying for completion acceptance.

Summary of engineering construction work 4 I joined the work in a certain year and have been engaged in the front-line work of landscape engineering construction, in order to integrate theory with practice, improve my professional knowledge and skills, master the theory and technology of this major in a solid and systematic way, and timely understand and master the advanced research and development trends and directions of landscaping industry at home and abroad. In the process of construction site management, as a landscape professional engineer, I actively communicate with other professional engineers and engineers in the design department and audit department, try my best to solve the problems in construction as quickly as possible, and take effective pre-control measures for possible problems in advance. I have participated in the organization and technical management of major projects and have rich experience in construction management, and have the ability to solve major technical problems in garden construction and design. Love your job, abide by professional ethics, and have excellent work performance. It has been rated as an excellent manager for many times, laying a solid foundation for the construction management of the project. Gradually become an excellent engineering and technical personnel. Now my work in the landscape engineering industry is summarized as follows:

I. Ideology and politics

Since I joined the work, I have strictly abided by the laws and regulations of the country and never participated in any illegal and disciplinary activities. While paying attention to improving ideological and moral character, we should also pay attention to the cultivation and improvement of personal cultivation and professional ethics. I always insist on studying the laws, regulations, rules, systems, norms and standards related to landscape engineering construction, so as to be loyal to my duties, abide by the law, be honest and self-disciplined, work hard and constantly strive to improve the quality of my work. Since work, I have been modest, studious, conscientious and have a good professional ethics. Be able to respect the post and love the industry, abide by the law, be down-to-earth, and work diligently and meticulously; Help others in life, unite and be friendly, and care for others. Can lead the team, unite as one, give full play to the collective wisdom and strength, and devote yourself to the work. Can actively unite colleagues, so that they can constantly improve their professional level and be better qualified for the job as soon as possible.

In my work, I have accumulated a lot of professional knowledge through my painstaking research and hard study on the theoretical knowledge of landscape architecture. At the same time, I also participated in the construction management of many landscaping projects, and achieved good economic, ecological and social benefits, making contributions to greening and beautifying the city.

Second, the attitude is correct, rigorous and scientific.

Landscaping is a very hard industry, exposed to the sun and rain, belonging to outdoor workers, with a very hard attitude and rigorous and scientific work spirit. We should not only ensure the survival rate of seedlings, but also ensure the quality of the project, and be strict with ourselves.

Third, professional and technical level.

I have been engaged in landscaping since I joined the work in a certain year. In my work, I have accumulated a lot of professional knowledge through my painstaking research and hard study on the theoretical knowledge of landscape architecture. At the same time, I also participated in the construction management of many landscaping projects, and achieved good economic, ecological and social benefits, making contributions to greening and beautifying the city. There is no end to learning, and career is just a continuation of students' career. It is important to apply the theoretical knowledge learned in school to work and further improve and sublimate it. With the care, help and support of leaders and colleagues, I closely focused on the company's work, gave full play to my post functions, constantly improved my working methods and improved my work efficiency. Based on the principle of "obeying leaders, uniting comrades, studying hard and working hard", we always adhere to high standards and strict requirements and successfully complete various tasks.

Only by in-depth practice can we gain something and really learn something. After taking part in the work, in order to become a better urban greening worker, I systematically studied botany, arboriculture, landscape ecology, landscape engineering, floral science, pest and disease science, CAD landscape design, and national landscaping budget, and continued to learn and enrich my knowledge, fully combining theory with practice.

Encyclopedia summary of engineering construction work mode template 5 I. General situation of the project

The site is located in Henggang, Longgang District, Shenzhen. The southeast of the site is Shenhui Road, and other areas are 2 ~ 13-storey buildings. There are four foundation pits in the site, namely 1, No.2 foundation pit, No.3 foundation pit and No.4 foundation pit, and there is a planned road between two adjacent foundation pits. 1 foundation pit is located in the east, No.2 foundation pit is located in the north, No.3 foundation pit is located in the south and No.4 foundation pit is located in the west. The total area of foundation pit in the site is about 39,459.7 square meters, the total perimeter of foundation pit is about 1, 549.438+0 meters, and the excavation depth is about 8. 2 ~ 9.7 meters. The foundation pit supporting works undertaken by our company are 1 and No.2 foundation pit. According to the differences of environmental conditions and geological conditions, the design scheme of foundation pit adopts double-row piles, composite soil nailing wall and sloping combined soil nailing wall respectively.

Second, the quality assurance system and quality management measures

1. In order to ensure the engineering quality, a special safety construction scheme shall be prepared before construction, submitted to the supervisor for examination and approval, and an expert group shall be organized to conduct expert argumentation on the special construction scheme, so as to improve the related questions raised by experts.

2. In the whole construction process, the project department is equipped with quality inspectors, safety officers, material engineers and site builders. In the process of construction, our company strictly implements relevant laws and regulations and carries out the construction according to the design requirements.

3. During the construction process, after the self-inspection of each working procedure is completed, it shall be reported by the builder, and the project department shall organize special inspection personnel. After passing the special inspection, it shall be reported to the supervisor for acceptance. After the acceptance, the next working procedure can be carried out.

Third, the construction process and process monitoring

Construction process:

1, 1# foundation pit supporting piles: construction started on February 24th, 2010.

2. 1# micropiles for foundation pit support: from 20×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××

3. 1# Jet grouting pile between piles of foundation pit: started on February 6th, 20×××××, with a total length of 456m, and was completed on February 20th, 20×××××××.

3. Prestressed anchor cable construction: construction started on February 26th, 20th, and started on February 26th, 20th.

4. 1# foundation pit combined with soil nailing wall sloping: the slope ratio is 0.5, and the total number of soil nails in 1# foundation pit is 2,847 respectively, and the shotcreting area is 7 1 100 m2, which was basically completed on February 27th, 20th and March 25th, 20th.

5. 2# foundation pit slope combined with soil nailing wall: the slope ratio is 0.5 and 1 respectively, the total number of soil nails in 0 # foundation pit is 2 148 respectively, and the sprayed concrete area is 4,900 m, which was completed on March 20th, 20 10.

Four, quality assurance information review

1. The purchased materials are witnessed and sent for inspection. Seven groups of cement physical properties were tested, and all the test results were qualified. The mechanical properties of 8 groups of steel bars were tested, and the welded joints of 2 groups of steel bars were all qualified. The test results of 48 groups of concrete specimens were all qualified.

2. On-site construction records, reinforced concealed acceptance records, underwater concrete records, concealed acceptance records, composite soil nailing wall construction process records and other related materials should be filled in in real time according to the construction site, and submitted to relevant units for review, signature and seal. The relevant information is complete and meets the acceptance requirements.

3. After the project is completed, the construction unit entrusts Shenzhen Xin Sheng Yuan Construction Engineering Quality Inspection Co., Ltd. to carry out strength inspection on supporting piles, prestressed anchor cables, soil nails and crown beams. * * * 22 supporting piles are tested, and the test results are18 Ⅰ piles and 4 Ⅱ piles, and the test results are rated as qualified; 92 prestressed anchor cables, and the tensioning results are qualified; 49 soil nails were tested for pullout resistance, and the test results were qualified.

Verb (abbreviation of verb) safety and civilized construction

Since the start of this project, our project department has organized the project construction in strict accordance with the technical specifications for building construction safety, established and improved the safety management system, implemented closed construction on the construction site, and rationally arranged the construction site to be civilized and clean. Set up five signs, one map and safety production slogan in eye-catching position, prepare special safety construction plan, and pass expert review. The Project Department shall have full-time security officers who shall be responsible for daily safety inspection, attendance and safety education. In the process of construction, timely rectify the potential safety hazards raised by relevant units, and severely punish those who violate safety production rules and regulations. No quality and safety accidents occurred during the construction.

Sixth, the project self-evaluation.

In the construction process, we always adhere to the principle of "quality first, safety first", strictly implement the provisions of relevant codes and regulations, always adhere to the premise of quality and safety, seek truth from facts without any luck, and finally complete the construction and production tasks with good quality and quantity. To sum up, the company and the project department self-check and evaluate the quality and safety level of this project as qualified. We still have some shortcomings in the construction process. Please criticize and correct us.

Construction unit (seal): engineering company

Project Manager (signature):

Date: Year Month Day