2. Prepare materials, three certificates (certificate of conformity, fire protection type permission, inspection report) of various related raw materials, hidden records, and debugging reports of various systems, etc.
3. Please ask a qualified testing unit to test the electrical testing, water system, alarm linkage system and other systems, and issue a test report;
4. Fill in the application form for the completion and acceptance of fire protection project issued by the local fire department, and attach the relevant information required by the local fire department, mainly including the application form, drawing review opinions, commencement report, three certificates of raw materials, hidden records, construction records, debugging reports of various systems, inspection reports, etc.
5, after the fire department to review the data qualified, determine the time to the scene for acceptance, mainly for on-site inspection, system testing, etc. ;
6, acceptance, fire inspection report issued within the prescribed working days, unqualified issued rectification opinions, after the completion of the rectification to acceptance;
7. The following acceptance can only be carried out after the fire control is qualified.