Commitment letter of construction progress 1 If our company is lucky enough to win the bid, XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
1, our company accepts all the bidding conditions in this tender.
2. We guarantee that if our bid is accepted, we, as bidders, are willing to implement the provisions specified in the terms and conditions of the contract agreement in the bidding documents. If it cannot be completed on schedule, we will pay a penalty of RMB 5,000 yuan as compensation for each day of delay, and your company has the right to terminate the contract and contract out separately. If the liquidated damages are not enough to make up for the losses caused to your company, we will make up for them. Your company can directly deduct the liquidated damages and losses that our company should bear from the project payment payable. If we need to participate in the project acceptance and provide relevant information after the termination of the contract, our company will give all cooperation.
Commencement time: subject to the commencement order of the owner's project department.
Completion time: the actual completion time calculated in the commencement order is the accurate construction period: 60 calendar days.
3. Contact Party A's management personnel after entering the site, and cooperate with Party A's construction period and related cooperation matters. The specific construction time of each construction period shall be subject to the construction task book issued by Party A. ..
Hereby promise!
Person in charge of legal person:
Commitment letter for construction progress 2: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
After receiving your contract documents, our company will immediately organize relevant personnel to conduct careful and meticulous research, and prepare the construction organization plan according to the scope and requirements of the contract documents. Now, combined with our actual situation, we will _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
1. Commitment to contract conditions: acknowledge and accept the requirements of your contract documents and be bound by the contract conditions;
2. Time limit commitment: Our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;
3. Project quality commitment: ensure that the construction is carried out in accordance with the technical and quality requirements of the contract documents, ensure that the project is qualified and reach the excellent engineering standards;
4. Commitment to safe and civilized construction: Strictly abide by the People's Republic of China (PRC) Law on Work Safety, Regulations on Work Safety Management of Construction Projects, Regulations on Work Safety License and other laws and regulations to ensure that no major accidents occur.
5. Commitment to submit settlement data: submit complete and effective settlement data at one time within _ _ days after the formal handover of the project;
6. Wage payment commitment of migrant workers: establish a roster of migrant workers, publicize the wage payment of migrant workers on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure migrant workers.
Capital can be put in place in full and on time.
7. Warranty commitment: Our company promises to be responsible for any quality defects and their consequences of this project within the warranty period stipulated in the contract, and fulfill the warranty obligations in time according to the contract.
Commitment: xxx
Time: XX, xx, xx, xxxx
Commitment Letter of Construction Progress 3 In order to ensure the quality and time limit for the road construction project of Taixin Road in Lixin County, we hereby make the following commitments regarding the company's participation in the bidding project:
1. Our company voluntarily pays the bid bond and credit bond of 700,000 yuan, agrees to all the contents stipulated in the tender documents, and attends the bid opening meeting on time, otherwise the construction unit will confiscate the bid bond and credit bond, and the losses caused to the construction unit will be borne by our company.
2. If our company wins the bid, it will pay the performance bond and credit bond of 700,000 yuan in full as stipulated in the tender documents, and ensure that it is completed according to the bid-winning time limit. Accept the monthly assessment of the construction progress by the construction unit. If the construction cannot be carried out according to the construction schedule provided by our company, we will voluntarily accept the punishment of the construction unit until the contract is terminated, and bear the losses caused to the construction unit.
3. Ensure that the project is not subcontracted or subcontracted illegally. Ensure that the project manager, management personnel, technicians and construction machinery are equipped as promised in the tender documents, accept the assessment and attendance of the construction unit and supervision unit, and hand over the registered builder's certificate of the project manager and the post certificates of bidders such as technical director, safety officer, quality inspector, builder and material engineer to the construction market management department of Lixin County for retention, and get them back with the completion acceptance certificate after the project is completed and accepted. If there are illegal subcontracting, subcontracting, linking, lending qualifications and other bad construction market behaviors, our company is willing to accept the legal treatment of the construction administrative department.
4. If our company wins the bid, our company will be responsible for handling any violation of project quality, safety and relevant provisions of the contract during the construction process, and the expenses shall be borne by our company.
Bidder (official seal): legal representative (signature)
20xx year month day
Commitment Letter on Construction Progress of Northwest Sichuan Gas Mine 4 of China Petroleum Southwest Oil and Gas Field Company:
In order to ensure the smooth completion of the production road reconstruction project (K3+480 to K5+550) in Qionglai operation area of Northwest Sichuan Gas Mine, according to the Notice of Northwest Sichuan Gas Mine on Implementing the "Two Commitments" System for Foreign Construction Teams and Material Suppliers, our unit solemnly promises:
1, 20xx March 1, go to the grass-roots unit to handle the entrance permit and special operation permit, and start the preparation work before entering the site.
On March 2, 2.20xx, the construction team of our company entered the site for construction.
3. Complete the construction within 38 working days from the mobilization date, and promise to complete the construction before April 8, 20xx.
Relevant personnel of our unit are familiar with the contents of this letter of commitment and are willing to seriously implement it. If you violate this commitment, you are willing to bear all corresponding responsibilities; If the project is not completed on time, it shall bear the corresponding liquidated damages in accordance with the contract.
The validity period of this letter of commitment is: from the commencement date of this project to three months after the completion and acceptance of the project, and it will take effect from the date of signing.
Signature of the promisor:
Commitment unit (seal):
20xx year month day
Commitment letter of construction progress 5 In order to ensure the quality and time limit for a project in changchun road, Lixin County, we hereby make the following commitments regarding our company's participation in the bidding project:
1, voluntarily pay the bid bond and credit bond of 700,000 yuan, agree to all the contents stipulated in the tender documents and attend the bid opening meeting on time, otherwise the construction unit may confiscate the bid bond and credit bond, and the losses caused to the construction unit shall be borne by our company.
2. If our company wins the bid, it will pay the performance bond and credit bond of 700,000 yuan in full as stipulated in the tender documents, and ensure that it is completed according to the bid-winning time limit. Accept the monthly assessment of the construction progress by the construction unit. If the construction cannot be carried out according to the construction schedule provided by our company, we will voluntarily accept the punishment of the construction unit until the contract is terminated, and bear the losses caused to the construction unit.
3. Ensure that the project is not subcontracted or subcontracted illegally. Ensure that the project manager, management personnel, technicians and construction machinery are equipped as promised in the tender documents, accept the assessment and attendance of the construction unit and supervision unit, and hand over the registered builder's certificate of the project manager and the post certificates of bidders such as technical director, safety officer, quality inspector, builder and material engineer to the construction market management department of Lixin County for retention, and get them back with the completion acceptance certificate after the project is completed and accepted. If there are illegal subcontracting, subcontracting, linking, lending qualifications and other bad construction market behaviors, our company is willing to accept the legal treatment of the construction administrative department.
4. If our company wins the bid, our company will be responsible for handling any violation of project quality, safety and relevant provisions of the contract during the construction process, and the expenses shall be borne by our company.
Bidder (official seal): legal representative (signature):
20xx year month day
Commitment letter of construction progress 6 In order to ensure the construction quality and time limit for a project of Fumenghe Bridge on Guangming Road in Lixin County, we hereby make the following commitments for our company to participate in this bidding project:
1. Our company voluntarily pays the bid bond and credit bond of 700,000 yuan, agrees to all the contents stipulated in the tender documents, and attends the bid opening meeting on time, otherwise the construction unit will confiscate the bid bond and credit bond, and the losses caused to the construction unit will be borne by our company.
2. If our company wins the bid, it will pay the performance bond and credit bond of 700,000 yuan in full as stipulated in the tender documents, and ensure that it is completed according to the bid-winning time limit. In terms of project progress, I will voluntarily accept the assessment of the construction unit on a monthly basis. If I can't carry out the construction according to the construction schedule provided by our company, I will voluntarily accept the punishment of the construction unit until the contract is terminated, and bear the losses caused to the construction unit.
3. Ensure that the project is not subcontracted or subcontracted illegally. Ensure that the project manager, management personnel, technicians and construction machinery are equipped as promised in the tender documents, accept the assessment and attendance of the construction unit and supervision unit, and hand over the registered builder's certificate of the project manager and the post certificates of bidders such as technical director, safety officer, quality inspector, builder and material engineer to the construction market management department of Lixin County for retention, and get them back with the completion acceptance certificate after the project is completed and accepted. If there are illegal subcontracting, subcontracting, linking, lending qualifications and other bad construction market behaviors, our company is willing to accept the legal treatment of the construction administrative department.
4. If our company wins the bid, our company will be responsible for handling any violation of project quality, safety and relevant provisions of the contract during the construction process, and the expenses shall be borne by our company.
Bidder (official seal):
Legal representative (signature):
20xx year month day
Commitment letter of construction progress 7 1. The masonry of the complex building is scheduled to be completed on August 19, 20xx (including constructional columns).
2. The concrete of the solar energy base on the roof of the northern section is scheduled to be completed on the 6th.
3. Slag concrete pouring in the gutter is planned to be completed on the 9th of this month.
4. The leveling and calendering of cement mortar under waterproof of flat roof and inclined roof is planned to be completed on June, 2004 14.
5. The leveling and calendering of reinforced concrete main body, brick wall concrete building, roof slope board and cement mortar under roof waterproofing in auxiliary workshop, boiler room and fire pool are planned to be completed before September 5 (Note: the pouring parts of commercial concrete in boiler room and fire pool: bottom plate and shear wall. The rest of C 15 concrete cushion adopts self-mixed concrete, and the concrete is transported by on-site loader. )
6. The reinforced concrete main body (including the foundation part) of the underground passage in the east section is planned to be completed within 20 days from the second day after the foundation excavation is completed (the handover date is subject to the on-site signature). The above six tasks can be completed on time, and the project payment will be paid to Party B within five days after acceptance. If the task is not completed on time, the project department will punish Party B (the main team) for every day of delay. If the above tasks can be completed one day ahead of schedule, the project department will reward Party B (the home team) with a bonus of 4‰ of the total project amount, and will punish Party B (the home team) for each day of delay.
In case of force majeure during construction, this letter of commitment shall be postponed according to the actual signature of the site foreman, and construction shall be carried out in light rain.
Commitment: xx
Xx year xx month xx day
Commitment letter of construction progress 8 In order to ensure the quality and time limit for the project of Guoqiang Road (including Zhongguo Bridge of Guoqiang Road) in Lixin County, we hereby make the following commitments regarding our company's participation in the bidding project:
1. Our company voluntarily pays the bid bond and credit bond of 500,000 yuan, agrees to all the contents stipulated in the tender documents, and attends the bid opening meeting on time, otherwise the construction unit will confiscate the bid bond and credit bond, and the losses caused to the construction unit will be borne by our company.
2. If our company wins the bid, it will pay the performance bond and credit bond of 500,000 yuan in full as stipulated in the tender documents, and ensure that it is completed according to the bid-winning time limit. Accept the monthly assessment of the construction progress by the construction unit. If the construction cannot be carried out according to the construction schedule provided by our company, we will voluntarily accept the punishment of the construction unit until the contract is terminated, and bear the losses caused to the construction unit.
3. Ensure that the project is not subcontracted or subcontracted illegally. Ensure that the project manager, management personnel, technicians and construction machinery are equipped as promised in the tender documents, accept the assessment and attendance of the construction unit and supervision unit, and hand over the registered builder's certificate of the project manager and the post certificates of bidders such as technical director, safety officer, quality inspector, builder and material engineer to the construction market management department of Lixin County for retention, and get them back with the completion acceptance certificate after the project is completed and accepted. If there are illegal subcontracting, subcontracting, linking, lending qualifications and other bad construction market behaviors, our company is willing to accept the legal treatment of the construction administrative department.
4. If our company wins the bid, our company will be responsible for handling any violation of project quality, safety and relevant provisions of the contract during the construction process, and the expenses shall be borne by our company.
Bidder (official seal): legal representative (signature):
20xx year month day
Commitment letter of construction progress 9 1. The brick masonry of the secondary structure of the comprehensive building is planned to be completed before August 18, 20xx (including the structural column and concrete belt of the first floor wall).
2. The solar foundation concrete for the roof of the northern section is scheduled to be completed on the 30th of this month.
3. It is planned to complete all concrete pouring of slag inside the inclined roof before August 2, 20xx.
4. Cement mortar priming for flat roofs and sloping roofs shall be completed before August 20th, 10.
5. The reinforced concrete main body, brick wall masonry, roof slope plate and cement mortar leveling layer under waterproof roof of boiler room and fire pool of auxiliary workshop are planned to be completed before September 5, 20xx. (Note: Pouring parts of commercial concrete in ancillary buildings: water pump house, fire pool floor and shear wall. The rest of C 15 concrete cushion adopts self-mixed concrete, and the existing loader is used for concrete transportation).
6. The reinforced concrete main body (including foundation part) of the underground passage in the east section is planned to start on August 10, and be completed before September 15, 20xx.
7. All indoor and outdoor timber, steel bars, steel pipes and garbage shall be cleared to the site stacking point designated by the foreman, which is scheduled to be completed before 30th of this month.
8. The above seven items can be completed on time, and the project payment shall be paid to Party B according to the contract terms within five days after acceptance. If the task cannot be completed on time, the project department will punish the creative team for every day of delay. 0 The liquidated damages shall be 5% of the total cost of the comprehensive building project, in days.
Commitment:
Date: Year Month Day
Commitment letter of construction progress 10 1. The masonry of the complex building is scheduled to be completed on August 19, xxx (including constructional columns).
2. The concrete of the solar energy base on the roof of the northern section is scheduled to be completed on the 6th.
3. Slag concrete pouring in the gutter is planned to be completed on the 9th of this month.
4. The leveling and calendering of cement mortar under waterproof of flat roof and inclined roof is planned to be completed on June, 2004 14.
5. The leveling and calendering of reinforced concrete main body, brick wall concrete building, roof slope board and cement mortar under roof waterproofing in auxiliary workshop, boiler room and fire pool are planned to be completed before September 5 (Note: the pouring parts of commercial concrete in boiler room and fire pool: bottom plate and shear wall. The rest of c 15 concrete cushion adopts self-mixed concrete, and the concrete is transported by on-site loader. )
6. The reinforced concrete main body (including the foundation part) of the underground passage in the east section is planned to be completed within 20 days from the second day after the foundation excavation is completed (the handover date is subject to the on-site signature). The above six tasks can be completed on time, and the project payment will be paid to Party B within five days after acceptance. If the task is not completed on time, the project department will punish Party B (the main team) for every day of delay. If the above tasks can be completed one day ahead of schedule, the project department will reward Party B (home team) with a bonus of 4‰ of the total project cost of the comprehensive building one day ahead of schedule, and will punish Party B (home team) for each day of delay.
If this cause encounters irresistible human conditions, press.
Subject to the actual signature of the site foreman, it needs to be postponed, and it is the same with light rain in general.
Commitment: xxx
Time: XX, xx, xx, xxxx
Commitment letter of construction progress 1 1 Yongning County Transportation Bureau:
In order to ensure the smooth completion of the Tanglaiqu Bridge on schedule, according to the requirements of the county government and the county transportation bureau, our unit solemnly promises:
1, 20xx65438+1before October 28th, the construction of the project department, the reinforcement test of cast-in-place piles and the mix proportion of fair-faced concrete have all been completed, the steel bars, acoustic pipes and processing equipment used under the bridge have all been put in place, the temporary laboratory has been set up, the drilling platform has been padded, and the commodity mixing station has been determined.
2.20xx began to process the reinforcing cage of bored pile on February 8th, began to pour pile on February 28th, and completed the substructure on March 25th. 1 year, precast bridge slabs will be started on March 6th, and 50% bridge slabs will be installed before April 5th.
Relevant personnel of our unit are familiar with the contents of this letter of commitment and are willing to seriously implement it. If you violate this commitment, you are willing to bear all corresponding responsibilities; If the project is not completed on time, it shall bear the corresponding liquidated damages in accordance with the contract.
The validity period of this letter of commitment is: 20xx 65438+ 10/8 ~ 20xx from April to May, and it will take effect after being signed.
Signature of the promisor:
Commitment unit (seal):
Xx,xx,XX,XX