As people’s understanding of the law deepens, the status of the contract cannot be ignored more and more. The contract coordinates the relationship between people. , the relationship between people and things. So does anyone know the format of the contract? The following is a template of a wooden formwork construction contract that I compiled (selected 5 articles). I hope it will be helpful to everyone.

Wooden formwork construction contract 1

Contract issuing party: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

According to the needs of the project, Party A will contract the formwork and installation project to Party B for construction. In accordance with the "Economic Contract Law of the People's Republic of China" and "Construction Management Regulations" and relevant laws and policies, combined with the actual situation on site, the project will be carried out after Both parties fully negotiated, clarified the relationship between responsibilities, rights and interests, and reached the following terms, which both parties must abide by and implement.

1. Contracting Content

Party B shall contract all the installation and dismantling of the formwork for the employee apartments and comprehensive buildings in the form of labor and material contracting.

2. Contracting Price

Staff apartments and comprehensive buildings are calculated based on the actual contact area between concrete and formwork according to the drawings and changes to the drawings, and are calculated in yuan per square meter.

3. Formwork and support

For this project, Party B must provide two complete sets of formwork for employee apartments and comprehensive buildings, including new peripheral panels and column formwork. Old panels are allowed to be used for other forms. Party A provides steel pipes and fasteners, and Party B takes care of the rest. Among them, there are three sets of beam bases in the comprehensive building. The bottom backing plate is not required to use channel steel. Party A needs to compact and level it, and Party B uses plates to back up the steel pipes.

IV. Payment method

Living expenses of RMB 100 will be paid after pouring concrete on each floor of each building. After the second floor, the settlement will be based on 60% of the work done; after the main structure is completed, 70% will be paid. Project payment (including previous work

5. Construction period

Party B must sign a monthly progress plan with Party A every month, and it must be completed with quality and quantity, otherwise all construction period losses will be borne by Party B (Except if the project payment is in arrears)

6. Responsibilities of both parties

Party A’s responsibilities:

1. Provide the project drawings and corresponding design changes. /p>

2. Provide the horizontal elevation and axis layout required by the template.

3. Provide the electricity, wires, and lighting required for the construction site.

4. Accommodation, canteen, and beds are provided.

5. Welded wall panel positioning steel bars, crowbar steel bars, and cement supports are provided by Party A.

6. Steel pipes and fasteners cannot be provided. If Party A supplies timely supply, the construction period shall be postponed and the corresponding losses of the carpentry shall be borne.

7. If Party A causes a shutdown of more than half a month (including half a month), Party B is allowed to withdraw.

Party B's responsibilities:

p>

1. Party B must review the day’s attendance sheet with Party A every day, and make a salary sheet at the end of each month and submit it to Party A. Workers’ wages will be paid directly to the workers by Party A, and all personnel entering the site must provide their identities

2. Quality requirements: Organize construction according to drawings, construction specifications, operating specifications, and national quality inspection and assessment standards to ensure one-time acceptance. A fine of 1,000 yuan will be imposed for each failure.

3. The squad leader must conduct various safety technical briefings and three-level safety education for the squad members, and conduct quality inspections before, during, and after the shift to eliminate quality problems.

4. “Safety first, prevention” must be followed. In accordance with the production policy and safety production operation regulations of "mainly based on the safety of the people", it is strictly prohibited to command illegal operations. Otherwise, Party B will be responsible for any safety accidents caused by itself, and Party A will not be responsible for the amount within 30,000 yuan (in the case of more than 30,000 yuan, Party A will pay 50%, Party B pays 50%)

5. Must obey the unified command and arrangements of Party A’s management personnel, must abide by the rules and regulations of the company and the project department, and at the same time, actively cooperate with other teams and agree with each other. , do a good job in unity, safeguard Party A's rights and interests, and do a good job in product protection.

6. If there is mold explosion, Party B will be responsible for handling the excess. All material losses will be paid by Party B at the price.

7. Party B will not provide material invoices or labor fees, nor will it provide any construction materials.

This contract is made in two copies. Party A and Party B each hold one copy. This contract will take effect from the date of signature by both parties. During the validity period of this contract, both parties shall abide by the terms of the contract. Any unilateral breach of contract shall bear corresponding consequences. responsibility.

Signature of Party A’s representative: Signature of Party B’s representative:

Date: Date: Wood formwork construction contract 2

Party A:

Party B :

This project is Zhongqing Finance and Trade Plaza (location: former Finance and Trade School). After negotiation between Party A and Party B, Party B voluntarily contracted Party A's carpentry services and part of the small timber work for the project. Based on the principles of equality, mutual benefit, fairness and voluntariness. Both parties *** agree to abide by the following contract.

1. Contract content and scope:

1. Construction drawings and design changes of the building of the project. Specific parts (including other parts that are not within the scope of the contract, they shall all fall within the scope of the contract)

2. Tools: Party A only provides one large circular saw, and Party B brings its own electric saw and cables , electric drill raincoat, crowbar, and other tools needed for carpentry.

3. Safe and civilized construction: You must wear a safety helmet when entering the construction site. Drinking and barebacking are not allowed to enter the construction site. It is strictly prohibited to bring children into the construction site. Violators will be fined 20 yuan per time. Fighting, theft, and hanging objects from high altitudes are not allowed at the construction site. The minor ones will be fined 500 yuan per time, and the serious ones will be handed over to the public security organs.

4. Party B must obey the management of the owner, supervisor, and construction personnel of Party A, and abide by professional ethics. Work can only be carried out (such as the time to remove the formwork).

5. In the event of a work-related injury, Party B shall pay the cost within 200 yuan each time.

2. Operating procedures and quality:

1. The distance between shelves and poles should be no more than 1.1m. Sweeping poles and shears should be erected. Beam bottom plates and leveling poles must be erected horizontally. On the poles, it is strictly prohibited to connect with the external frame, and the beams in the intersection area must be supported (the transfer layer shall be reinforced and constructed according to Party A's requirements).

2. The displacement of the base plate shall not exceed 3mm, the flatness of the cast-in-place plate shall not exceed ±5mm, the inner and outer angles must be vertical, straight and square, and the misalignment shall not exceed 2mm.

3 . The first hoop of the column should not be larger than 25cm from the floor. The rest of the standard floors should be vertically oriented according to 60cm, 70cm or 80cm wall limbs. The spacing should not be greater than 45cm. The exterior walls, interior walls and bottom moldings should be pasted with double-sided tape. A control rod hoop must be added 25cm below the wall floor to bury the old wall on the lower floor to ensure quality.

4. Complete 7 standard floors in one month.

5. The height of the side formwork and hanging formwork is 2cm greater than the actual size. The axis deviation is 5mm. Beams larger than 40cm are equipped with screw rods. The hanging formwork is not allowed to pull wire support on the steel bars. It must be The cast-in-place formwork is supported by wires, and the hanging formwork for toilets, kitchens, balconies and other parts must be operated by adding formwork to the wood.

6. The height of columns and shear walls shall be cut according to the actual size of 1cm. Party B will be responsible for sealing the seams if they are larger than 1cm, and Party A will be responsible for sealing the seams if they are less than 1cm.

7. All holes of embedded parts shall be made and supported by Party B (such as flues, cable holes, channel steel holes, tower base, etc.).

8. Each layer of template must be cleaned before installation. The damaged ones must be replaced.

9. The starting price for all formwork explosions and collapses is 50 yuan. Party B will handle it by itself without pricing.

10. Party B must be present when the owner, supervisor and Party A of each floor inspect and accept the property.

11. Someone must be on site to protect the mold when pouring concrete. Otherwise, it will cost 300 yuan per layer/layer and another person will be required to protect the mold.

12. Party B must carry out construction according to the quality progress required by the owner to supervise Party A. Otherwise, Party A has the right to terminate the contract with Party B, and Party B will withdraw unconditionally. The pricing method shall be paid according to the four clauses.

3. Unit price list: Remarks on unit price per square meter (settled according to actual connected area)

Non-standard layer unit/㎡

Conversion layer unit/㎡

p>

Standard layer unit/㎡

Cylinder (standard layer) unit/㎡

Stairway unit/㎡

Formwork part press ( Completed and qualified) 60%/㎡, demolished formwork is 40%/㎡. If you leave midway, you will be settled at 60%/㎡ of the completed qualified project (payable in one month).

4. Payment method:

Accounts are settled on the 30th of each month, and the salary for the previous month is paid before the 15th of the following month, and the day after the project is completed.

5. Materials:

1. Party A provides nails, wire, and the cost will be deducted from Party B’s monthly salary.

2. The discoverer of random sawn wood squares and wooden templates. The fine for wooden work is 20 yuan/piece, and the fine for wooden formwork is 100 yuan/piece. Deducted from the salary of the current month. Pour board.

3. After capping, the materials should be classified and stacked neatly according to the place designated by Party A.

4. The construction site should be cleared after the work is completed.

6. Others

Contract the project and pay a deposit of 500 yuan after signing the contract (complete one floor 3. Shelves must be left in place when dismantling the cast-in-place panels. Shelves are absolutely not allowed. After the settlement is completed, the deposit will be refunded when the salary is paid). If you do not enter the market on time, you will leave the market midway. The deposit is non-refundable.

7. This contract is made in two copies, one copy each for Party A and Party B. It will take effect after signature. It will automatically expire after the completion of the project and the wages are paid in full.

Party A:

Party B:

Year, month and day wooden formwork construction contract 3

Contract issuing unit: (referred to as Party A) < /p>

Contracting unit: (referred to as Party B)

According to the "Contract Law of the People's Republic of China" and the "Labor Law of the People's Republic of China" as well as the laws and regulations of this industry relevant regulations. Following the principles of equality, voluntariness, fairness and honesty, the two parties have reached an agreement on the carpentry engineering matters of the Langxiangdi project, and this contract is hereby concluded.

Article 1: Project Overview

1. Project Name: Langxiang Mansion

2. Project Location: Yuhong District, Shenyang City.

3. Contract scope: woodworking projects and ancillary projects within the site, nails and wires used in carpentry. (Including the retention and sealing of various reserved holes, the cooperation of other types of work, the placement of waterstops, wood loading and unloading trucks, woodworking material loading and unloading trucks, the removed formwork, and the timber are neatly classified and stacked at the locations specified by Party A. Trimming and nailing of woodworking turnover materials. Chiseling caused by mold expansion. Temporary facilities and civilized construction work content)

 4. Contracting form: labor fee. Yuan per square meter for the negative floor. Yuan per square meter above one floor. (The crane workers and lift mechanics will be provided by Party A, and the costs will be shared proportionally)

Article 2: Unit price and payment method:

1. The amount of completed work shall be paid annually in 20_ , 80% of the completed project quantity will be paid after the main body passes the acceptance inspection of the six-story capping.

2. 90% will be paid after the main body passes the acceptance inspection of all capping.

3. 95% will be paid after passing the completion acceptance.

4. The warranty will be paid to 100% upon expiration.

Article 3: Project deadline

September 2, 20_-November 30, 20_.

Article 4: Scope of responsibilities of Party A

1. Supervise Party B to enter the site according to the construction schedule and complete the construction tasks as required.

2. Party A is responsible for providing Party B with various construction machinery and tools, materials and drawings used during the construction process. Provide technical briefing and technical guidance before construction.

3. Party A will send a dedicated person to conduct quality supervision during the construction process.

4. Pay project fees according to the contract.

Article 5: Scope of Responsibility of Party B

1. Party B submits to Party A’s unified management.

2. Party B will send a construction site representative to handle relevant matters during the construction process, form a quality management team according to Party A’s requirements, strictly implement Party A’s construction plan, construction requirements, and complete the work on time.

3. Party B carefully constructs the project in strict accordance with the drawings and Party A’s technical briefing, and sends full-time personnel to inspect and accept the quality of the project every day.

4. Party B shall not damage or waste Party A’s materials at will. Wooden squares, wooden supports, templates, etc. shall not be cut off at will when Party A has raw materials of similar size. Violators will be fined 200 yuan each time. Turnover materials such as clamps and wall bolts are given a 3% loss. The excess amount will be compensated at the original price.

Special tools must be returned promptly after use, and any lost tools will be compensated at the original price. Maintain the tools you use, protect the materials you use, ensure that the site is clean after work is completed, and construction is carried out in a civilized manner.

5. Party B fills in the form to request payment according to Party A’s payment request procedure. Party B is responsible for any incomplete information (including the payment request form and the real-name salary sheet signed by the on-site staff)

< p>6. Party B will be responsible for cleaning up any slurry or concrete leakage caused by Party B’s lax formwork support. If the cleaning is not done in time and any losses are caused, Party B will be responsible for compensation.

Article 6: Project quality requirements:

1. The quality of this project is high quality.

2. During the construction project, if Party B causes a quality accident, Party B will be responsible for all costs. Party A shall impose a fine according to the seriousness of the accident.

3. This project is subject to project acceptance based on the "Construction Acceptance Specifications" and "Construction and Installation Quality Inspection Standards" issued by the state.

Article 7: Project Maintenance

The warranty period of this project is calculated from the date of completion of the project handover procedures. The term is one year. During the warranty period, Party B shall promptly repair any quality defects caused by construction reasons. If the repair is not done or the repair is not timely, Party A will send someone to repair it, and the costs incurred will be deducted from the warranty money.

Article 8: Responsibilities of Party A and Party B for production safety

1. Responsibilities of Party A

1. Organize and monitor Party B who enters the site Construction workers are provided with safety education on compliance with rules and regulations. Party B's construction captains and special work operators who inspect Party B must pass the training and examination by the relevant superior departments before taking up their posts with certificates.

2. Provide “three-level education” to Party B’s new construction workers who have passed the examination before they can take up the job.

3. Party A shall provide all safety facilities and safety tools, appoint dedicated personnel to inspect the safety facilities, and provide explanations for each branch project.

4. Carry out safety inspections on the operating behavior of Party B’s employees, and investigate and punish those who violate regulations and disciplines.

2. Responsibilities of Party B

1. Do a good job in safe production and civilized construction, implement standardization, standardize the construction site, obey Party A’s personnel management, and cooperate with Party A’s management personnel in various tasks inspection and supervision. Actively accept penalties for illegal operations, promptly rectify hidden dangers when found, and promptly report safety issues encountered during construction to Party A's personnel. If a safety accident is caused by Party B's own fault, Party B shall be responsible for it, and any expenses incurred shall be borne by Party B himself.

2. Party B must set up a safety officer to be responsible for the safety production management of on-site construction, and carry out targeted and specific work according to the construction organization design or construction plan, by division of parts, projects, and types of work. Safety technical disclosures must be kept for review.

3. Party B is not allowed to dismantle or modify the living and production facilities and equipment provided by the project department or Party A without authorization.

4. Construction workers should use safety helmets, safety belts and other protective equipment reasonably, otherwise Party B will be responsible for any safety accidents caused.

5. Fighting is strictly prohibited at the construction site and living area, especially group fights. If there is any violation, both squad leaders and the parties concerned will be fined 1,000 yuan each. If the case is serious, they will be transferred to the local public security department for handling.

6. Strengthen fire prevention. It is not allowed to use electric stoves and other electric heating equipment for heating, cooking, boiling water, and urinating in the building. Strictly abide by public security regulations, fire prevention systems, traffic regulations, and obey inspection and management by security personnel.

7. Theft is strictly prohibited on site. Those found stealing steel bars will be fined 1,000 yuan, and those found stealing wires will be fined 3,000 yuan. If the circumstances are serious, they will be sent to the local public security agency.

Article 9: Liability for breach of contract and dispute resolution.

1. From the effective date of this contract, Party A and Party B must fully perform the obligations stipulated in the contract, and neither party shall change or terminate the contract without authorization.

2. Party A and Party B shall be held responsible if the contract cannot be performed or cannot be fully performed due to the responsibility of one party

3. When a dispute arises between Party A and Party B during the performance of the contract , resolved in accordance with relevant national laws and regulations.

Article 10: Number of Contract Copies

This contract is made in two copies, with Party A and Party B each holding one copy.

Article 11: Contract Period

This contract will take effect after being signed by both parties. When the warranty period expires and the project payment is paid in full, this contract will become invalid

Party A: Responsible Signature of person:

Party B: Signature of person in charge:

Year, month and day: Wood formwork construction contract 4

Party A:

Party B :

Party A will contract the single ceiling project of the second section (5# building) of Dongsheng Phase 3 low-rent housing in Dongsheng Street to Party B for construction through contracting. In order to clarify the content of the project and the responsibilities of both parties, based on the principles of mutual assistance and equality, and based on the situation of this project, the following terms have been agreed upon and shall be abided by by both parties:

Article 1: Project Overview< /p>

Project name: Building 5#, Section 2, Section 2, Dongsheng Phase III low-rent housing, Dongsheng Street, Construction location: Dongsheng Yipoleqi Construction content: Contracting method for ceilings of shops, walkways, kitchens and bathrooms: Labor fee single package. Party A provides the main materials required for the above contract content, and Party B provides the auxiliary materials required to complete the above contract content (note: nails, safety helmets, necessary tools for construction, buckets, and temporary electricity, etc.).

5. Construction period: days. According to the actual situation on site, the construction arrangement is a flow operation, and the construction period shall be based on the progress plan arranged by Party A and signed and confirmed by Party B.

Article 2: Method of settlement and payment of labor remuneration

1. Contracting unit price: Based on the above contracting content and contracting method, the ceiling price is yuan/square meter (this unit price is tax inclusive) .

2. Project quantity calculation: Settlement will be based on the actual construction area receipt.

3. Confirmation of project quantities: signed by the foreman and signed by the receiving party, and reviewed and signed by the on-site person in charge designated by Party A.

4. Project payment method:

1) Party A will verify the project quantity completed by Party B on-site on the 25th of every month, and pay 70% of the monthly completed project quantity and cost at the beginning of the next month As a progress payment, one time analogy.

2) Party B completes the construction tasks on time according to Party A’s plan. Within one month after the completion of the project, Party A will pay Party B 80% of the total cost of the completed project as progress payment; an additional 10% will be added as a reward; if If Party A cannot complete the construction tasks on time according to Party A's plan, Party A will pay Party B 60% of the total cost of the completed project within one month after the completion of the project, and deduct 10% as a penalty.

3) After the project is completed and accepted, Party A will confirm the amount of the project constructed by Party B. After both parties sign and confirm, Party A will pay 95% of the total cost of the completed project within one month, and the remaining 5% is used as a warranty deposit, and there will be no quality problems within two years from the date of completion acceptance. Party A will pay the remaining 5% to Party B without interest.

Article 3: Responsibilities of both parties

1. Responsibilities of Party B

1. After completing the contract construction tasks in accordance with the contract, it is entitled to receive labor remuneration within the corresponding terms;

2. Party B shall be responsible for any work safety accidents caused by Party B during the performance of this contract;

3. During the performance of this contract, Party B shall have the right to correct defects in construction drawings, safety and quality hazards, etc. Provide suggestions for modifications and corrections, and have the right to refuse to work under unsafe conditions.

4. The construction tasks specified in this contract must be completed with quality and quantity in accordance with the construction drawings and construction specifications. Through self-inspection, mutual inspection, special inspection and acceptance, the "three inspections and one inspection" system shall be implemented to avoid leaving hidden construction quality hazards and ensure construction quality.

5. Must strictly abide by national safety regulations, strictly organize safe construction, conscientiously accept the three-level education and safety technical briefing, and effectively prevent safety accidents;

6. Must accept A Party B shall supervise and manage safety and quality, and Party B shall rectify any opinions raised by Party A immediately;

7. National laws and regulations must be complied with, and Party B’s representatives must take responsibility and strictly manage, and no incidents shall occur at the construction site. Fighting, stealing, gambling, prostitution and other illegal and criminal activities.

8. Labor remuneration must be paid in full and on time, workers’ wages must not be withheld or in arrears, and must be supervised by Party A. If the wages of migrant workers are in arrears, Party A will directly pay the workers' wages after verification by both parties, and double deductions will be made from Party B's project payment.

9. Party B is not allowed to use child labor and workers who are not suitable for high-altitude crimes. Special types of work must be held with certificates.

10. Party B’s construction workers must wear safety helmets when entering the construction site, and must fasten safety belts when working at heights. If Party A's management personnel inspect and find that Party B's construction workers failed to wear safety helmets and safety belts as required, Party A will impose a penalty of 200 yuan per person on Party B, which will be deducted from the project payment.

11. Party B should pay attention to cleaning up and sorting the main materials, auxiliary materials and semi-finished products within the construction scope at any time.

12. Party B shall submit a material plan six days in advance for Party A to purchase. If the proposed material plan does not meet the actual situation and the materials are left idle or wasted, Party B shall compensate for all economic losses resulting therefrom.

13. Party B should have safety management capabilities. If a safety accident of less than 10,000 yuan occurs during the construction project or is fined more than 5 times for safety violations, Party A has the right to reduce the contract unit price by 10-20% or terminate the contract. .

2. Party A’s Responsibilities

1. Supervise and manage Party B’s construction progress and quality, and urge Party B to conscientiously perform its contractual obligations;

2. Ensure Party B’s safety Supervise and manage civilized construction, urge Party B to conscientiously implement various safety management measures, and effectively prevent various accidents;

3. Supervise and inspect Party B’s representatives to pay labor remuneration in full and on time, and shall not delay the payment of labor wages to laborers;

4. Supervise Party B’s representatives to strengthen the management of labor personnel, and promptly handle illegal and disciplinary incidents;

5. Have the right to pursue Party B for breach of contract in accordance with the provisions of this contract and national laws. Responsibility;

6. When facts prove that Party B and its representatives cannot accept supervision or perform the contract, Party A has the right to unilaterally change or terminate the contract;

7. In accordance with the provisions of this contract Labor remuneration shall be paid according to the time limit, standard and proportion, and no arrears shall be allowed;

8. Handle any work-related injury accidents in accordance with the provisions of this contract.

9. Earnestly implement the three-level education and safety technology briefing.

Article 4 Quality Requirements

Party B’s construction quality must comply with GB50210-20__ "Code for Quality Acceptance of Building Decoration and Renovation Projects", "Chengdu Household Acceptance Standard for Residential Projects", and design drawings and relevant regulatory requirements of Chengdu City.

Article 5 Project Warranty and Services

1. The warranty period and shelf life are calculated from the date when the project is completed and accepted and Party A signs the acceptance certificate, in accordance with the warranty terms stipulated by the state. Execution, the warranty period is two years.

2. Scope of warranty liability: Except for damage deemed by Party A during use, intentional or unintentional damage by a third party, damage caused by natural disasters and force majeure factors, any damage caused by Party B’s construction quality and handed over after acceptance Any damage to the scope of the project caused by poor storage by Party B and poor construction quality that fails to meet the original design requirements shall fall within the scope of Party B's warranty responsibility.

3. Warranty costs: Withheld from the project settlement, 5% of the total project settlement price is retained as warranty money. Upon expiration of the warranty period, the remaining balance will be refunded in one lump sum after deduction of expenses incurred during the period. If the accumulated warranty fees incurred exceed the total retained warranty fees, the excess shall still be paid by Party B.

4. During the warranty period, Party B shall send someone to repair it within 24 hours after Party A sends a notice. Otherwise, Party A can entrust other construction units or personnel to repair it. The cost will be deducted from the warranty deposit, and the shortfall will be borne by Party B. Pay. If a quality dispute arises, it should be submitted to the quality inspection department for ruling. If damage occurs outside the warranty period, Party B is responsible for the repair work and will charge labor and material fees as appropriate.

Article 6 Liability for Breach of Contract

The following situations are deemed as breach of contract. If Party B breaches the contract, the following methods will apply:

1. Party A pays labor remuneration overdue, Interest shall be paid to Party B according to the current bank time deposit interest rate;

2. If Party B fails to pass the quality inspection of the construction project, Party B shall be responsible for rework. Party B is responsible for the rework time fee; it is also responsible for Party A's material loss expenses and Party A has the right to reduce the contract unit price by 10-20%

3. During the construction, Party B's accidents occur due to illegal operations by Party B's personnel In the event of a safety accident, the person in charge of Party B shall bear 100% of the losses. The person in charge of Party B shall not withhold wages from the workers after bearing the losses.

4. If laborers have fights, thefts, gambling and other illegal and disciplinary incidents at the construction site, Party A will deduct a labor fee of 5,000 yuan each time. If the circumstances are serious, the penalty will be doubled, and Party B will bear the corresponding legal liability.

5. If Party B delays the construction period without justifiable reasons and fails to strengthen personnel deployment after Party A raises the objection, Party A has the right to terminate the contract or reduce the scope of Party B's contract; if Party A suffers losses, Party A has the right to Party B has the right to reduce the contract price by 30% as a breach of contract loss, and Party B must voluntarily leave the site within two days after receiving Party A's notice of termination of the contract. Party A shall complete the settlement to Party B within 30 days and pay 60% of the total settlement price. The balance shall be paid within one year after the project is completed and accepted.

Article 7 Dispute Resolution

If any dispute arises between Party A and Party B during the performance of this contract, it shall first be resolved through negotiation between the two parties. If negotiations fail, either party may apply for labor arbitration or file a lawsuit in the People's Court in accordance with the law.

This contract is made in duplicate, with each party holding one copy. Each signed and sealed contract has the same legal effect and is protected by national law. It will automatically expire after the balance is settled.

Person in charge of Party A: Signature and seal of the person in charge of Party B:

Year, month and day

Year, month and day Wooden formwork construction contract 5

< p> Contract issuing party: (referred to as Party A)

Contractor: (referred to as Party B)

Through friendly agreement between Party A and Party B, the following agreement is reached

1 , Contracting content:

1. Subcontracting form: Cleaning work

2. Subcontracting items: Unit price

(1) Carpentry: The comprehensive unit price is 24 Yuan/㎡ (settled based on contact area).

The above unit price includes auxiliary materials such as wire and nails required for various types of work, as well as the tools used.

3. Subcontracting content:

(1) Carpentry work content:

All carpentry work content of the entire building;

① Formwork ingredients, production, installation, disassembly, and load-bearing frame erection and disassembly. Cleaning and stacking of formwork steel bars, cleaning and oiling of formwork. Leave holes for elastic wires and column reinforcements, and bury embedded parts. Production and installation of steel plate waterstops.

4. Tools and tools: including repairs

The tools and machinery (except the derrick) used by Party B shall be taken care of by Party B itself, including repair, maintenance and management.

5. Construction period: According to Party A’s requirements, the overall progress plan will ultimately be guaranteed.

2. Project quality:

The quality of the masonry work of this project must meet the one-time acceptance criteria.

Party A must make a technical briefing, and Party B must strictly abide by the construction specifications and operate carefully according to the drawings or technical change contact sheets. Party B must obey Party A’s on-site instructions during construction.

If the quality does not meet the requirements due to Party B’s fault, it must be reworked and redone. Party B will be responsible for all costs incurred thereby. It will be deducted when the project is settled that month.

3. Payment method:

1. The project payment is based on the principle of first payment and later payment.

2. Party A will pay the remaining amount in one lump sum within three months after the completion of the project based on the amount of work actually completed in the month.

4. Rewards and penalties:

1. This project implements a quality deposit system. If the construction quality of Party B fails to meet the contract requirements, the quality deposit of 10,000 yuan will be confiscated. Party A has the right to withdraw from Party B.

2. This project implements a safe production and civilized construction deposit system. If Party B fails to meet Party A’s requirements for safe production and civilized construction during the construction process, Party A has the right to withdraw from Party B. .

3. Party B must implement the project department’s quality, safety, civilization, and material management systems during the construction period, and implement the project department’s relevant reward and penalty regulations.

5. Safe and civilized production:

1. Party B shall strictly abide by the safe operating procedures and the six disciplines of safe production and ten safety technical measures during the construction period, and implement the company and local safety regulations The relevant regulations of the production management department are implemented to ensure safe production. Any accidents that occur during construction will be the responsibility of the responsible party.

2. Party B strictly abides by the civilized construction management system of the project department and the local management department, and obeys the arrangements of the project department to create a civilized and standardized construction site.

Put an end to barbaric construction and illegal operations, and do a good job in cleaning up the construction site. Do a good job of cleaning up the work site. Materials shall be positioned and placed neatly according to Party A's requirements. If Party B is found to have failed to recycle materials in a timely manner, a fine of 1,000 yuan will be imposed if found once.

3. If Party B does not have all the labor protection supplies, fails to wear a safety helmet as required, etc., a penalty of 50 yuan per person will be deducted for each occurrence.

6. Others:

1. The person in charge of Party B must be at the construction site 70% of the time. Party B must equip sample copying personnel of various types of work.

2. The personnel recruited by Party B during the construction period must have all three certificates and apply for various certificates in a timely manner. The expenses shall be borne by Party B. Party B shall be responsible for all consequences caused by incomplete certificates and shall not Illegal recruitment of underage workers will result in a fine of 500 yuan.

3. Party B must abide by the relevant policies and laws of the local public security department during the construction period. If fighting, stealing, or gambling are found, they will be dealt with strictly, and a fine of 1,000 yuan will be imposed for each occurrence.

4. Party B promises all the conditions in the contract terms. If there is any breach of contract, Party B will be responsible for all consequences. Party A has the right to terminate the contract and the remaining balance will be confiscated by Party A as a loss to Party A.

5. Matters not covered in the contract shall be resolved through friendly negotiation between the two parties.

This contract is made in triplicate, with Party A holding two copies and Party B holding one copy. It will take effect after being stamped and signed by both parties.

Party A: Party B

Representative: Representative:

Signing date: Year, Month, Day;