Power grid engineering safety construction operation ticket b
Number:
project name
Construction team (team) work site
Work content, start time
Risk level of construction personnel
Main risk points:
Division of work:
Pre-operation inspection
Whether the clothes and mental state of the construction personnel are in good condition-whether the construction safety protection articles (including individuals) are complete and intact-whether the instruments used on site are in good condition and conform to the safety technical measures-whether the construction personnel have participated in the disclosure of the safety technical measures of this project-whether the construction personnel have a clear division of labor-whether the personnel at each post are aware of their existence. Do you know the risk points and risk sources □□□□□ Do you know the pre-control measures □□
Operator's signature:
Remarks:
Person in charge of work: auditor (safety, technology)
Safety Guardian: Issuer (Project Manager)
Date of issue:
Supervisor (level III and above risks): Project Department of the Owner (level IV and above risks):