How to fill in the working ticket for general earthwork safety construction?
D.4. Working ticket b for safety construction of power grid project (table type)

Power grid engineering safety construction operation ticket b

Number:

project name

Construction team (team) work site

Work content, start time

Risk level of construction personnel

Main risk points:

Division of work:

Pre-operation inspection

Whether the clothes and mental state of the construction personnel are in good condition-whether the construction safety protection articles (including individuals) are complete and intact-whether the instruments used on site are in good condition and conform to the safety technical measures-whether the construction personnel have participated in the disclosure of the safety technical measures of this project-whether the construction personnel have a clear division of labor-whether the personnel at each post are aware of their existence. Do you know the risk points and risk sources □□□□□ Do you know the pre-control measures □□

Operator's signature:

Remarks:

Person in charge of work: auditor (safety, technology)

Safety Guardian: Issuer (Project Manager)

Date of issue:

Supervisor (level III and above risks): Project Department of the Owner (level IV and above risks):