The name of the unit project is the name of the project on the construction permit (the name required for completion record is consistent with the construction permit). In fact, the names of unit projects in bidding documents, construction contracts, construction drawings and other documents may be inconsistent. My general practice is to use the project name agreed in the construction contract as the name of the unit project (when other units question, the contract is our basis, and we will act according to the contract).
The name of subdivisional work is the name of quality acceptance record of inspection lot, such as "Quality Acceptance Record of Planting Soil Inspection Lot", and the name of subdivisional work is to fill in the planting soil subdivisional work. Fill in the acceptance part of greening project. In order to ensure the survival rate of seedlings, it is necessary to plant and maintain them in time. Moreover, according to the site construction and the procurement of seedlings, some seedlings can't arrive at the site at one time, which brings great trouble to the compilation of data. It is suggested to fill in the information according to "construction site/pile number+(number of seedlings entering the site)".
For example, K0+000-K 1+500 pedestrian street trees (65 Lechang smiling) ". The construction unit is the winning bidder, and the professional foreman and project leader fill in the corresponding builder and project manager in the bidding documents. If the project manager changes, the project manager needs to complete the change procedures first, and then fill in the changed project manager, and the signature needs to be signed by hand.
The most basic construction quality acceptance document in engineering data is the inspection lot, which supports the upper main structure like the foundation of a high-rise building. The quality of foundation directly affects the rationality and compliance of engineering data compilation in the later period.
Inspection lot refers to the inspection body consisting of a certain number of samples that are taken for inspection under the same production conditions or in a specified way.
The master control project should be filled in according to the inspection contents of each inspection lot and the actual construction situation on site. There is no construction project on site or the project whose construction is inconsistent with the master control project is empty, and the master control project must be 100% qualified.
Extended data
General projects, like master control projects, shall be filled in according to the inspection contents of each inspection lot and the actual construction situation on site. There is no construction project on site or the project whose construction is inconsistent with the master control project is left blank. In general, more than 80% of the individual inspection items are qualified, and the average qualification rate of the sum of the master control project and the general project inspection items is guaranteed to be more than 80% (more than 90% is required when submitting the Luban Prize, etc.). ). If the project wants to submit corresponding awards, you need to check the details of the engineering data submitted by the awards.
Compile the engineering reference room to avoid that all 100% of the inspection lot is qualified, and all 100% is too suspected of fraud, and the site construction quality is difficult to reach 100%. The allowable deviation of general projects and the number of unqualified projects should be controlled as far as possible within 1.5 times of the allowable deviation.
HowNet-Revision of Code for Acceptance of Construction Quality of Landscaping Project