1. The first floor personnel are inspectors.
The second floor is the technical director.
Two, the content of the test report verification (3 points):
1, approving all requirements of article 5. 10 of standard CL0 1-2006;
2. Signature of inspector and auditor;
3. Identify unauthorized inspection items and data.
Three, the application of feedback information, data verification (7 points)
1. The correctness and effectiveness of the detection method cited;
2, the use of quality control means
3. Check the accuracy of instruments and master the limit points of instruments and equipment;
4. Environmental impact;
5, data correction and determination of the limit value
6. Cited constants and coefficients;
7. Evaluate the systematic error and random error generated in the detection process.
For more questions, please consult Shenzhen Guanzhida Industrial Co., Ltd.