In today’s society, agreements are increasingly used in daily life. Signing an agreement can bind both parties to fulfill their responsibilities. Does anyone know the format of the agreement? The following are 7 production safety protocols that I have collected and compiled. They are for reference only. Let’s take a look at them together. Safety Production Agreement Part 1
(hereinafter referred to as Party A) Group (hereinafter referred to as Party B)
In order to strengthen safe production and civilized construction at the construction site, and ensure the creation of a civilized construction site and standardized management , protect the vital interests of the construction, clarify the responsibilities and obligations of both parties, and formulate a safety agreement as follows:
1. Party A’s responsibilities:
1. Earnestly inform Party B of the relevant national departments , implement the guidelines, policies, and systems formulated by the company to implement the safety production responsibility system for each position.
2. All safety equipment such as hard hats, seat belts, and safety nets, and all safety facilities such as temporary wires, electrical appliances, machinery, tower cranes, outer frames, and derricks on the construction site must meet the requirements before they can be put into use. use.
3. Prepare construction organization design, prepare special construction plans, such as outer frames, derricks, temporary electricity, fire prevention, etc., and seek approval from relevant departments.
4. The project department conducts safety inspections every half month, holds regular safety leadership group meetings, summarizes experience, implements measures for existing problems, and makes timely rectifications. A dedicated person is responsible for rectifications.
5. Conduct three-level safety education for new workers entering the site, apply for relevant certificates and pre-job training. Conduct safety education and publicity from time to time, and provide briefings on safety technology.
6. Punish and educate those who violate the six major disciplines of production safety and various safety technical measures, illegal commands and illegal operations.
2. Responsibilities of the team;
1. The team must conscientiously implement and implement the guidelines, policies, rules and regulations of the relevant superior departments and project departments, consciously abide by the safety of various types of work, and cooperate with A The party's safe production and civilized construction work.
2. All special types of work must hold valid certificates to work.
3. The team leader must supervise the implementation of the project department’s rules and regulations, safety education and various safety activities carried out by the project department, and assist the project department in various safety tasks.
4. Party B is not allowed to bring family members into the construction site (unless approved by the project department). Mixing of men and women is strictly prohibited in the dormitory. If found, a fine of 50 yuan will be fined each time. Family members and children approved by the project department are not allowed to enter the construction site. You are not allowed to run around in the construction site and play with various mechanical equipment. Party B will be responsible for all accidents caused by family members and children on the construction site due to their own reasons.
5. If an accident occurs, report it to the project department immediately, protect the site, and cooperate with Party A to identify and analyze the cause of the accident, clarify responsibilities, and bear all responsibility and expenses.
6. The team should implement the rectification suggestions put forward by the project department, conduct self-inspection and mutual inspection, and then review them by the project department.
7. The project department will mainly conduct briefings on technology, quality, safety, fire protection, etc. with the team leader (the team leader will be responsible for briefing the team members). All accidents that occur on the construction site will be reported to the team leader. Take primary responsibility.
8. The project department has formulated a series of regulations on rewards and penalties for civilized construction and clean work in response to safety production and civilized construction goals. The regulations are attached separately.
Both parties A and B are expected to abide by the above provisions. This agreement is made in duplicate, with each party holding one copy.
Project Department: Team:
Representative: Representative:
Year, Month, Day Safety Production Agreement Part 2
***E Block Phase II Project Department (hereinafter referred to as Party A)
Painting team (hereinafter referred to as Party B)
According to the company’s various safety production rules and regulations and the relevant safety production regulations of the Shanghai Safety Supervision Station The spirit of the document requires that in order to prevent the occurrence of safety production accidents, the following provisions have been formulated through mutual consultation between Party A and Party B:
1. The person in charge of the construction site and each manager must be responsible for the safety of the construction site. Production should be comprehensively managed, and three-level safety production education should be carried out at the same time. Safety technical briefings should be continuously conducted according to the progress of the project, so that all employees can have a clear understanding and focus on prevention.
2. Party A should create good safety facilities for employees. Safety protection measures must be taken from construction electricity, scaffolding, mechanical facilities, edges, openings, etc., to meet the requirements for safe production.
3. If Party B operates illegally, fails to wear a safety helmet, violates rules and regulations, etc., and does not change it after being pointed out, Party A has the right to punish it until dismissal. Violators shall be subject to relevant provisions of the project. impose penalties.
4. Party B shall abide by the rules and regulations of the construction site, wear work clothes and soft-soled shoes for construction operations. It is strictly forbidden to wear slippers and vests to work. It is forbidden to drink alcohol before work. It is strictly forbidden to fight and joke at work. Violators will be punished according to relevant regulations of the project department.
5. Party B shall obey the arrangements of the construction site leaders. However, if Party A forces Party B to risk operations if the safety production requirements are not met, Party B has the right to refuse the operation, and Party A will be responsible for the consequences.
6. Party B must inspect its own safety protection facilities before operating.
Construction can only be carried out if the requirements are met. Those who do not meet the requirements must be reported to superiors and no risky work is allowed.
7. Special staff must hold certificates to work. Non-operators are not allowed to play with mechanical equipment. Violators will be punished according to relevant regulations of the project department.
8. It is strictly forbidden to use electric stoves for heating and cooking, and you are not allowed to connect wires without permission. Violators will be fined 100-300 yuan.
The above agreement is made in duplicate, with Party A and Party B each holding one copy. The contract will take effect after signature.
Party A (stamped): ***E Block Phase II Project Department Party B: Painting Team
Signing Representative: Signing Representative:
Year, Month, Day Safety Production Agreement Part 3
Party A: ________ Party B: ________
In order to implement the safety production policy of "safety first, prevention first", strengthen and standardize engineering construction safety technology Management work, preventing construction safety accidents, ensuring the safety and health of employees, and promoting economic development of enterprises. Achieve the "zero" indicator of safety production accidents throughout the year, and clarify the management responsibilities and obligations of both parties based on the actual situation of the project. After negotiation between the two parties, this agreement was signed, and both parties will abide by it.
1. Responsibilities and Obligations of Party A
1. Responsible for the food and accommodation of Party B’s personnel and provide a comfortable living environment.
2. Responsible for providing Level 3 safety education and daily safety training to Party B.
3. Responsible for supervising and inspecting the use and purchase of Party B’s safety protective equipment.
4. Responsible for organizing, planning, arranging, inspecting, summarizing, and evaluating relevant safety production activities carried out by superior departments.
5. Supervise and inspect Party B’s production safety work, and promptly provide rectification suggestions for potential safety hazards at Party B’s construction site. Those who fail to make corrections within the time limit shall have the right to order the company to stop work and make corrections and impose fines.
6. Responsible for making safety technical disclosures to Party B in writing and signed by the operator himself.
7. Responsible for the supervision and management of Party B’s special operations personnel holding certificates.
2. Responsibilities and Obligations of Party B
1. Party B must unconditionally accept Party A’s Level 3 safety education before entering the site for operation. Party B can only start work after passing the examination and signing this agreement. .
2. Party B must correctly wear a safety helmet of qualified quality and fasten the hat strap when entering the construction site.
3. Party B is not allowed to enter the construction site barefoot, wearing slippers, or shirtless.
4. If Party B is a special operator, Party B must provide Party A with qualified and valid operating certificates, and strictly follow the relevant operating procedures during the operation.
5. Party B is not allowed to smoke at the construction site or in the dormitory, and is not allowed to connect electrical equipment without permission.
6. If Party B needs to start a fire, he must issue a "fire certificate" before starting a fire, and arrange fire-fighting equipment and fire watchers. The fire can only be started after Party A's confirmation.
7. Party B shall not drink alcohol and cause trouble, gather in groups to gamble, or disturb social order.
8. Party B shall not use fire-fighting, flood-control and other equipment at the construction site at will.
9. Party B must avoid harming himself, others and being harmed by others during operation.
10. Party B must protect the safety protection facilities at the construction site and shall not dismantle or modify the protection facilities at will. When protective facilities affect construction operations, a written report must be made to the safety and technical management personnel in advance. Changes may be made only with written approval and they shall be restored in a timely manner afterwards.
11. The construction equipment and small machines brought by Party B must comply with national standards and regulations, so that the mechanical equipment has good performance and the safety protection devices are complete, sensitive and effective.
12. Party B must bear the economic losses and legal liability for accidents caused by its own illegal operations.
13. Party B has the right to refuse Party A’s illegal instructions.
14. Party B must implement project construction organization design and safety technical briefing during construction, strictly carry out operations in accordance with operating procedures, eliminate hidden dangers of accidents, and put an end to illegal command and illegal operations.
15. Party B must always pay attention to vehicles entering and exiting the construction site to avoid casualties caused by vehicles entering and exiting.
16. When Party B is working at heights, he or she must properly fasten safety belts of qualified quality (both shoulders).
17. Party B must abide by Party A’s various rules and regulations during the operation and obey Party A’s management.
IV. Breach of Contract
1. If Party B fails to meet the agreed conditions, once Party A finds out, Party B will be required to make rectifications and supplements immediately, and Party B shall make rectifications and supplements as required by Party A. Perfect until the agreed conditions are met.
2. If the agreed conditions cannot be met due to Party B’s reasons, Party B shall bear the liability for breach of contract and economic losses.
3. If Party B goes to work without Party A’s third-level safety education before entering the work site, he will be responsible for any responsible accidents and bear the consequences.
5. Disputes
When a dispute arises between Party A and Party B, they can negotiate and mediate through the superior authorities of Party A and Party B. If an agreement cannot be reached, they can submit it to the relevant departments of the XX Municipal Government. Apply for arbitration.
6. This agreement is made in duplicate, with Party A and Party B each holding one copy.
7. This agreement shall take effect from the date of signature and seal by Party A and Party B until Party B vacates the site.
Party A (seal): ________ Party B (signature): _________
Project manager: ____________
____year____month____ Day ____ year ____ month ____ Day 4 Safety Production Agreement
Party A: Kunming xxx Mining Co., Ltd.
Party B: China Metallurgical Geology Administration Kunming Geological Exploration Institute
In order to ensure normal production at the outsourced field exploration and construction site, prevent safety accidents, and ensure the safety of construction personnel and production facilities during the production process, Party A and Party B signed this Agreement through equal consultation and consensus. This Agreement As an accessory agreement to the exploration and construction project contract.
1. The project leader of Party B is the first person responsible for safety production and shall be responsible for establishing a safety production responsibility system and regularly organizing the construction unit's study of safety production laws, regulations, industry standards, safe operation skills, and safety protection knowledge. , and keep good records, master safety production skills, and be responsible for all safety issues in the production process.
2. Party B must establish corresponding safety management systems and safety operating procedures for corresponding types of work, and set up full-time (part-time) safety production personnel to be responsible for the daily safety prevention work and safety production inspection of the construction unit. Correct and rectify hidden dangers in a timely manner and keep safety work logs.
3. Field special operations personnel, such as electricians, metal welders, drilling rig operators, diesel mechanics, etc., must follow the relevant national regulations, undergo special safety operation training, and pass the examination to obtain special operation qualifications Only with the operating qualification certificate can you start working.
4. Party B must do a good job in fire prevention and explosion prevention. A large amount of diesel, gasoline, engine oil, etc. used in field drilling construction may cause fire or explosion accidents if exposed to open flames, high-temperature surfaces, friction and impact, adiabatic compression, electrical sparks, static sparks, lightning strikes, photothermal rays, etc. Strict control measures must be taken against these ignition sources at the construction site. Smoking in dangerous areas is prohibited, and unextinguished cigarette butts and other ignition sources are prohibited from being discarded in the wild. Various ignition sources must maintain a necessary safe distance from combustible materials. Various oils and Implement a strict approval and registration system and have dedicated personnel to manage it.
5. Party B must do a good job in electrical safety technical precautions. For drilling equipment such as drilling rigs, water pumps, and diesel engines, it is necessary to adopt protective zero connection and grounding systems, install leakage protectors to strengthen insulation, use safe voltages, and set up safety production chain protection devices to prevent misoperation and other electric shock accidents, and equipment such as drilling towers must When installing lightning arresters, every shift must check whether various safety protection facilities are intact, complete, and effective. If any abnormal conditions are found, effective measures must be taken in a timely manner.
6. Party B must do a good job in mechanical safety technical precautions. During the operation of mechanical equipment, personnel are prohibited from touching the rotating parts of the mechanical equipment, refueling, repairing, inspecting, cleaning, etc. The transmission part of the machinery, the operating area, the working area on the tower, the moving area of ??the drilling rig, etc. must be specially protected, and obvious warning signs must be set up. Complete safety warning signs must be established at the construction site in accordance with relevant regulations.
7. Party B must do a good job in flood prevention and flood prevention. Common disasters in the rainy season include collapses and landslides, flash floods, mudslides, etc. The occurrence of these accidents often destroys engineering facilities in the field: destroying and blocking road traffic, etc. Therefore, drilling construction must be designed and arranged reasonably. Before the rainy season comes, drainage ditches and flood control dams must be dug, steps must be dug on steep slopes, weather forecasts must be listened to, roads and drilling site conditions must be checked, and adequate prevention and preparations must be made.
8. Construction vehicles and their drivers and passengers should strictly abide by the "Road Traffic Safety Law of the People's Republic of China", regularly organize drivers to learn the Road Traffic Safety Law, and inspect and maintain vehicles at any time. , if the vehicle condition is not good, you are not allowed to leave the vehicle, and it is strictly prohibited to carry people in the truck compartment.
9. Party B should strengthen personnel management, coordinate the relationship with the local government and the masses, and avoid the occurrence of fights; at the same time, do a good job in the safekeeping and maintenance of property to avoid national, collective and individual property losses. .
10. The person in charge of Party B's project must make a safety technical briefing before construction. During construction operations, he or she shall urge construction workers to strictly follow the "Safety Regulations" to achieve safe production and civilized construction; workers must be properly equipped. Wear and use labor protection equipment that meets the regulations; strengthen the protection of the construction environment, and strictly prohibit littering of domestic garbage, oil and water around the drilling rig to pollute the environment.
11. Party A has the right to conduct safety inspections on Party B and order Party B to rectify unsafe behaviors of personnel and machinery and management defects in unsafe conditions; Party A has the right to punish Party B for violating safety regulations Correct the behavior and impose corresponding penalties according to the severity of the situation.
12. Party B shall obey the unified coordination and safety management of Party A, and shall not give illegal instructions or perform risky operations; and shall do a good job in lightning protection, food poisoning prevention, forest fire prevention, theft prevention, heatstroke prevention and harmful gas spray. Wait for work, and resolve potential accidents or unsafe factors in a timely manner.
13. Party B will be responsible for all costs and responsibilities arising from any accidents (especially personal casualties and property losses) during the construction process, and Party A will not be held responsible. When an accident occurs, Party B shall actively organize rescue operations to minimize casualties and property losses.
14. This agreement shall take effect from the date of signing of the exploration and construction project contract. If there are personnel changes, the successor will continue to perform the duties.
15. Matters not covered in this agreement shall be resolved by mutual negotiation between Party A and Party B or submitted to the people's court where Party A is located for resolution.
16. This agreement is made in triplicate, with Party A and Party B each holding one copy and the Ministry of Safety and Environmental Protection filing one copy.
17. This agreement shall take effect from the date of signing the exploration and construction project contract, and its validity period shall be consistent with the exploration and construction project contract.
Party A’s signature:
Party B’s signature:
Part 5 of the production safety agreement, 20xx
Party A : (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to strengthen the safety management of construction vessels, clarify the respective responsibilities of both parties, ensure the safety of water construction, and prevent safety accidents occurs, this agreement is signed and both parties must strictly implement it.
1. Safety responsibilities mutually observed by Party A and Party B
1. Party A and Party B must conscientiously implement the safety production guidelines, policies, regulations, systems and maritime safety regulations formulated by the state and relevant departments. We must comply with the department's various safety regulations, constantly improve safety production conditions, establish and implement a sound production safety responsibility system, and strictly abide by relevant safety operating procedures.
2. Party A and Party B must jointly organize regular and irregular inspections of the working environment, operating facilities, equipment, appliances, etc. of water construction. If any hidden dangers are discovered, the construction should be stopped immediately and implemented by relevant personnel. After rectification and passing the inspection, construction can continue.
2. Party A’s safety responsibilities:
1. Party A must provide safety education and safety technical explanations to the operating personnel of its ships. To improve workers’ awareness of production safety and self-protection capabilities.
2. Correctly handle the relationship between production and safety, insist on handing over safety production essentials when handing over tasks, and do not give orders in violation of regulations.
3. Party B’s safety responsibilities:
1. Party B’s ships should hold a valid ship nationality certificate or ship registration certificate. Construction ships should be equipped with qualified crew members sufficient to ensure the safety of the ship in accordance with the "Minimum Safe Manning Rules for Ships of the People's Republic of China". Shipboard operating personnel must hold a qualified certificate of competency.
2. Sufficient lifebuoys, life jackets and other life-saving equipment, as well as necessary fire-fighting equipment, must be equipped in accordance with regulations. Life jackets must be worn when operating on the deck, and anti-freeze and anti-slip work must be done. Personnel working in the cabin must wear life jackets. If workers are reminded not to wear life jackets, crew members should stop operations and report to the person in charge of the construction team to put on life jackets before normal operations can begin. If crew members see construction workers not wearing life jackets, they will not stop operations. If an accident occurs, the crew will bear the corresponding responsibility.
3. Party B shall strictly implement the safety operating procedures of ship machinery equipment, repair and maintain the equipment in a timely manner to ensure safe operation, and report any major accidents such as machine damage to the project department immediately.
4. Before construction, a safety inspection should be conducted on the machines, equipment, protective equipment and working environment used. If any problems are found, corrective measures should be taken immediately to eliminate potential accidents in a timely manner. Before water construction, it is necessary to promptly understand the water conditions, tide level, and wind direction in the work area.
5. Party B shall participate in safety production activities convened by Party A and put forward suggestions for improving safety management and eliminating hidden dangers of accidents.
6. Measurement marks and various safety protection facilities at the construction site must not be dismantled or altered without authorization. If dismantling or alteration is really necessary, it must be approved by the person in charge of the construction site and necessary and reliable measures must be taken. It can only be dismantled after taking safety measures.
7. If Party B’s operators violate safety operating procedures and relevant regulations on production safety and cause safety accidents, Party B shall bear all economic and legal responsibilities.
8. In the event of a work-related injury, organize rescue immediately, report in time, and protect the accident scene.
4. This letter of responsibility will take effect upon signature and will expire after the ship leaves the site.
This agreement is made in duplicate, with Party A and Party B each holding one copy. No one may enter the construction site to operate without signing.
Representative of Party A: Year, Month, Day
Representative of Party B: Production Safety Agreement, Part 6, Year, Month, Day
General contractor: South of Kaiping Road, Jiangcheng To the west of the avenue, the project department of the first phase of the A1-1A1-2 plot
Subcontracting unit: Scaffolding team
In order to strengthen the safety management of the construction site and protect the personal safety and health of employees and national property to ensure the smooth progress of construction and production. In accordance with the "Labor Law of the People's Republic of China", "Construction Law of the People's Republic of China", and "Regulations on Safety Management of Construction Projects", both parties have agreed on the safety production of this project. The following agreement has been reached:
1. Responsibilities of the general contractor and subcontractors
Subcontractors must implement safe production and civilized construction when constructing within the area of ??the general contractor. The relevant national and industry safety operating procedures and all safety production management systems of the general contractor shall be followed, and the safety production management of the general contractor shall be followed, as well as the hidden danger notices issued by law enforcement personnel and the safety measures disclosed by the technical department.
Before the construction personnel of the subcontracting unit enter the site, they must first submit the on-site person in charge, the number of construction personnel (including full-time or part-time safety officers, and special operations personnel), the business license of the subcontracting unit, the production safety license, and the company’s Copies of qualifications and power of attorney should be submitted to the general contractor, and construction can begin only after verification.
Before the subcontracting unit enters the site, the subcontracting unit must provide pre-job education on safe production and civilized construction to the personnel entering the site, as well as on-site education by the general contractor, and the education level is required to reach 100%.
It is strictly prohibited to command or operate in violation of regulations. For unsafe hidden dangers that arise during the construction process, the general contractor has the right to issue a hidden danger notice and make corrections within a time limit. If the circumstances are serious and the rectification is not made on time, the general contractor shall The unit has the right to stop the subcontracting unit's operations, and the subcontracting unit shall be responsible for all consequences arising therefrom.
The fixed scaffolding, movable tool scaffolding, shelves in the elevator shaft, electrical lines, hand-held power tools and other facilities that are erected by the subcontracting unit must be done in strict accordance with the requirements of the specifications, and the relevant departments must be organized for acceptance. It can be used, and the subcontractor will be responsible for any accidents.
The construction electricity, scaffolding and protective facilities provided by the general contractor to the subcontractor must be accepted by both parties and can only be used after completing the handover procedures. Any damage that occurs to the subcontractor during use All matters have nothing to do with the general contractor. Various protective facilities on site must not be dismantled or modified at will, especially when the hole protection needs to be opened. The subcontracting unit should submit a written application to the general contractor in advance, and construction can only be carried out after approval. In addition to setting up obvious signs during the construction, special personnel should also be assigned to guard it. Monitor and close it in time after completion or when leaving get off work.
The subcontracting unit must be familiar with the location and direction of underground pipeline laying. Unknown pipelines must be reported to the general contractor and the construction can only be carried out after the ownership is determined and the property owner agrees. If construction is not carried out in accordance with the underground pipeline countersigning order or unknown pipelines are found to be constructed without permission, the subcontractor will be responsible for any damage to the underground pipelines.
In order to facilitate on-site management, the subcontractor must pay a certain amount of safety risk deposit to the general contractor according to the area of ??the construction project. If no accident occurs, the full amount will be returned to the subcontractor after the project is completed. If a subcontracting unit, such as a subcontracting unit, encounters hidden dangers or violates regulations during the construction process and fails to rectify them in a timely manner and is punished, the fine will be deducted from the deposit. The insufficient portion of the risk deposit shall be deducted by the general contractor from the project payment of the subcontracting unit.
2. Responsibilities of construction personnel
Construction workers must wear safety helmets correctly as required when entering the construction site, and must wear safety belts when working at a height of more than two meters. Without the application and consent of the general contractor, it is prohibited to dismantle or modify the safety protection, mechanical protection and temporary electrical protection facilities on site without permission.
Cross-working is prohibited on site. Workers at heights are strictly prohibited from throwing tools, accessories and various objects down from heights. Workers inside the building are strictly prohibited from throwing garbage and any objects out of windows or edges. Prevent objects from hitting people.
Electricity for construction must not be connected indiscriminately. When power needs to be connected, it must be operated by a full-time electrician and under the unified arrangement of the electrician of the general contracting unit. Special operating personnel must hold a certificate to work. Without a certificate, Those who take up the post will be punished or dismissed by the general contractor (or Party A) depending on the severity of the case.
Civilized construction must ensure that the site is cleared after the work is completed, materials are stacked neatly, and waste materials are transported to designated locations and stacked neatly. Littering is strictly prohibited to prevent personal injury and environmental pollution.
3. Accident handling
Casualty accidents caused by subcontracting units or subcontracting unit operators’ illegal command, illegal operations or imperfect equipment and facilities shall be handled by the subcontracting unit in accordance with the national The current regulations are responsible for the handling and all financial compensation and aftermath of the injured, disabled or deceased individuals and their families, and are responsible for compensation for all losses of the general contractor.
If an accident involving the injury, disability, or death of a subcontracting unit operator occurs due to the responsibility of the general contractor or other than the general contractor, while implementing the accident handling regulations and referring to the current national policies, the responsible unit shall make a one-time decision Financial compensation will be given to the subcontracting unit, and the aftermath will be handled by the subcontracting unit.
4. This agreement shall be made in quadruplicate. The general contractor and the subcontractor shall each hold one copy and submit one copy to the supervision department and the construction unit (Party A).
5. This agreement is valid from July 20, 20xx to June 20, 20xx.
General contractor (signature and seal): Subcontracting team (signature):
July 20, 20xx
Legal representative (signature and seal): Legal representative (signature and seal):
Authorized agent (signature and seal): Authorized agent (signature and seal):
Year, month and day safety production agreement Part 7
Construction unit: (hereinafter referred to as Party A) Building 22, Taiheju, Shantou Dahao Construction Corporation
Leasing unit: (hereinafter referred to as Party B) Xianxian Jinshan Building Materials Leasing Station
In order to effectively implement the responsibility for safe production and ensure the safety and health of construction personnel during the production process. To ensure the smooth progress of construction, in accordance with the "Production Safety Law", "Regulations on Safety Production Management of Construction Projects" and relevant laws and regulations, and following the principles of equality, fairness, honesty and trustworthiness, Party A and Party B will discuss the installation, use and maintenance of the hanging basket scaffolding. , reached the following agreement on safety production management matters:
1. Responsibilities of Party A:
1. Responsible for Party B’s qualifications of the electric hanging basket manufacturer, product certificates, and construction plans , Approval of design calculations, review of the qualifications of the hanging basket and scaffolding installation unit and registration for construction use, employment certificates of installation and dismantling operators, etc. If the requirements are not met, they will be immediately reissued and completed.
2. Responsible for the supervision, inspection and acceptance of the installation and dismantling of Party B’s hanging basket scaffolding. Party B is required to make immediate rectifications of the safety issues detected in accordance with the operating procedures and specifications of the hanging basket.
3. Responsible for making safety briefings to the operating construction personnel, ensuring that the hanging basket does not cross construction with other machinery and facilities, is not allowed to be overloaded, and is not allowed to carry non-operators up and down. Strictly abide by the safety system and take good care of the hanging basket. facility.
4. If the hanging basket fails during operation, Party A should immediately stop using it and promptly notify Party B’s personnel for repairs.
5. Party A provides the distribution box for the hanging basket, and Party A’s electrician is responsible for connecting various power supplies.
2. Party B’s responsibilities:
1. According to Party A’s rental quantity, personnel with special operation certificates will be dispatched to Party A’s construction site in a timely manner to guide the installation, and strictly inspect each installation location Whether it meets the requirements of safety regulations and after normal debugging and operation, organize the four parties (installation unit, construction unit, supervision unit, construction unit) to jointly inspect and accept it. Only after passing the inspection can it be delivered to Party A for use.
2. Cooperate with Party A to conduct pre-job technical training and technical briefings for construction personnel, so that they can become familiar with and master the performance of each part of the hanging basket to achieve safe operation.
3. If Party A fails to rectify the potential safety hazards raised by Party B within the time limit, Party B will be responsible for any fines or safety accidents that occur.
4. Party B shall supervise the safe operation of Party A's personnel in accordance with the "Safe Operating Procedures for Suspension Baskets". If Party A is found to have violated operating regulations, it has the right to stop the operation.
5. Party B shall deal with "non-human damage" such as safety lock failure, elevator failure due to unqualified products, electromagnetic brake three-phase asynchronous motor, failure due to unqualified products, cables, The wire ropes and insurance ropes are broken due to non-compliance with the regulations, the lack of pads causes wear or the binding is not firm, the flange bolts are unqualified, the wire rope snap ring screws are not tightened as required, the screws of each component are loose, the counterweight is not pressurized as required or Party B will bear the consequences if the counterweight is removed and causes casualties and safety accidents.
6. Electrical repairmen must hold a special operation certificate and be responsible for the electrical connection and maintenance of distribution boxes and hanging basket distribution boxes.
7. Party B’s maintenance personnel shall abide by various rules and regulations formulated by Party A, obey the work arrangements of management personnel, wear safety helmets correctly, and fasten seat belts when performing maintenance in high-altitude hanging baskets. The fine for not wearing a helmet is 50 yuan/time, and the fine for not wearing a seat belt is 200 yuan/time.
3. Obligations of both parties:
1. Conscientiously implement national, local and superior guidelines and policies on production safety, strictly implement laws, regulations and standards on production safety, and clarify safety responsibilities respectively. , to ensure the implementation of safe production.
2. Any illegal command, illegal operations and violations of labor disciplines must be stopped promptly.
3. In the event of an accident, effective measures should be taken quickly, organize the rescue of the injured, protect the scene, and report to the relevant superior departments.
4. Effectiveness and termination of the agreement:
This agreement clarifies safety responsibilities and will take effect from the date of signing. The agreement will be terminated after the demolition is completed.
5. Number of copies of the agreement:
This agreement is made in two copies, with Party A and Party B each holding one copy.
Party A (official seal) Party B (official seal)
Party A’s representative: Party B’s representative:
Signing time: 20xx year month day