Current location - Quotes Website - Signature design - 3 housing construction contract
3 housing construction contract
Housing construction projects are related to the vital interests of thousands of families. The house is the main place for life, work, leisure and other activities, so how to write the house construction contract? The following is the housing project contract I compiled, please refer to it.

House construction contract 1

Employer: (Party A for short) Contractor: (Party B for short)

According to People's Republic of China (PRC) Contract Law, People's Republic of China (PRC) Building Law, building construction standards and quality requirements, and following the principles of equality, voluntariness, fairness and good faith, Party A is willing to contract out the residential building project to Party B, and both parties reach an agreement on the construction of this project and conclude this contract.

I. Overview of the Project

Project name and location: private residence, the project is located at the intersection of Zhaigang Road and Sanbao Street. Engineering structure: the foundation is concrete cast-in-place pile foundation, and the first to tenth floors are frame structures. Two. Form and content of engineering contract: contracting for work and materials.

Content of the contract: Party B shall carry out the construction according to the requirements of the construction drawing provided by Party A, and its content shall be housing foundation works (below plus or minus zero); (plus or minus zero or above) main works of brick-concrete structure (including parapet and top stairwell) and indoor and outdoor mortar plastering decoration works; Surrounding open ditch apron protection project.

Third, the requirements of engineering quality

The quality of the project must meet the building standards of qualified houses. In the process of construction, Party B must obey the management of Party A's on-site construction personnel, and each working procedure can only be carried out after the acceptance of both parties. In case of quality problems caused by construction, Party B must unconditionally rework and take full responsibility for the project quality.

Fourth, the project schedule requirements

Due to Party A's responsibility or force majeure events, the commencement date is delayed and the construction period is postponed.

Verb (abbreviation of verb) safe production

The construction of this project requires operation in accordance with relevant regulations to prevent safety accidents. In case of any safety accident, Party B shall be responsible for all the consequences.

Payment of taxes and fees for intransitive verbs

Party A shall be responsible for the "three links and one leveling" and related procedures of house construction, and bear all taxes (including taxes for Jian 'an project);

Party B only bears the water and electricity costs used in the construction process, and all other taxes and fees are borne by Party A. ..

Seven. Contract price

The contracted area of this project is square meters, and the unit price of contract and materials is RMB/square meter (excluding taxes for Jian 'an project). The total investment of this project is about RMB. According to the actual construction area.

Eight, project payment

After the foundation is completed, Party A shall pay RMB to Party B; Party A shall pay RMB to Party B after the completion of the main project on each floor (after the concrete pouring on the roof of each floor); Party A shall pay Party B RMB after plastering and decorating the interior and exterior walls.

After the project is completed and delivered to Party A, both parties shall settle accounts, and Party A shall pay the balance of the project in one lump sum, except for the quality deposit. The warranty period of Party B is one year from the date of completion acceptance and delivery to Party A, and there is no quality problem, and the quality deposit shall be paid in one lump sum when it expires; During the warranty period, if there are construction problems such as water leakage and cracks in the sand wall, if Party B receives the quality problems of Party A's house, Party B shall deal with them in time until Party A is satisfied, otherwise Party A will hire someone to deal with them, and the working hours and materials will be deducted from the deposit.

If the Employer defaults on the progress payment or the final payment, it shall pay _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ to the Contractor.

Nine. Party A has the obligation and responsibility to deal with and coordinate the surrounding relations, and is responsible for bearing the land occupation fee and coordinating the relationship with the housing construction management department. Party B shall properly handle the surrounding relations during the construction.

X this contract is made in duplicate, one for each party, and shall come into effect as of the date of signature. Other matters not covered shall be settled by both parties through consultation.

Employer: (signature) Contractor: (signature)

Tel: Tel:

date month year

Housing construction contract ii

Owner (Party A):

The Employer (Party B):

Through negotiation between Party A and Party B, Party A's building storey-adding project is awarded to Party B, and Party B will undertake the storey-adding construction, and the following agreement is reached:

(a) the scope and content of the contract:

1. Party A will hand over the main building, internal and external painting and hydropower works to Party B for construction.

2. The contractor does not contract materials. During the construction, Party B shall be responsible for formwork, nails and iron wires, and Party A shall be responsible for wire binding and covered electrode.

3. The unit price per square meter is expressed in words per square meter.

4. Party B is responsible for the tools and machinery (templates, mixers, electric welding machines, scaffolding, cables, etc.) used in the construction. ).

(II) Responsibilities of both parties

1, Party A:

(1) Party A shall provide construction drawings and change plans (the third floor is a frame structure).

(2) Each working procedure shall be accepted by Party A before proceeding to the next working procedure.

(3) After watering each floor, Party A shall pay Party B RMB.

2. Party B:

(1) Party B shall carry out the construction according to Party A's requirements or drawings and complete it within the time stipulated in the contract.

(2) During the construction period, Party B shall conduct civilized construction with safety first.

(3) If an accident occurs during the construction period, Party B shall bear all the responsibilities.

(3) Payment method:

1. After the construction party completes the first floor, Party A pays 80% of the project cost to Party B, and after watering the second floor, it pays off the remaining 20% of the project cost of the first floor and 80% of the project cost of the second floor. Pay off all the project funds within one month after completion, and a fine of 65438+ 0% of the total project amount will be imposed every day for more than one month.

2. The canopy of the roof is half of the project cost.

(4) Project quality:

Party B shall ensure that the formwork support error is within 65438 0.5cm and the bricklaying error is within 65438 0 cm. If there is a big error, Party B shall be responsible for handling it.

(5) 1. The construction period is one year.

2. The above contract will come into effect as soon as it is signed. Any party who breaches the contract during the construction period will be fined 3000 yuan.

㈥ 1。 This contract is made in duplicate, one for each party.

2. It must be completed within the specified time. If it is delayed, it will be deducted by 1% of the total project amount every day.

Signature of Party A:

Signature of Party B:

Housing construction contract 3

Party A:

Party B:

Based on the principles of fairness, voluntariness, honesty and credit, Party A and Party B have fully understood and negotiated to sign this house construction contract.

1. Party A will hand over the housing construction project in Langli to Party B for construction.

Second, the engineering structure: the whole frame, the wall is built with clay hollow bricks.

Three. Project payment settlement method: This project adopts lump sum method, which ensures the quality, safety and quality of the project. According to the construction area multiplied by the unit price of square meters. The construction area is calculated according to the national construction budget, and there is no extra-budgetary fund within the contracted scope.

Four. Construction period: extended from to, and Party B shall bear the liability for breach of contract.

Verb (abbreviation of verb) construction content:

1. The civil works of this building shall be carried out according to the construction drawing of the regular design institute provided by Party A. The seventh floor shall be constructed according to the standard floor. In addition to external wall insulation, doors and windows, interior wall tiles, ground decoration, stair handrails, interior wall coatings. Interior wall and ground mortar plastering. The external wall is an external wall brick approved by Party A. The external wall brick should be firmly pasted and beautiful. All engineering quality shall be inspected and accepted according to national standards, and those unqualified shall be reworked immediately until they are qualified.

2. The hydropower part of this project shall be installed and constructed according to the construction drawing standard. Party B is responsible for wire and tube, junction box, switch box, lightning protection, downpipe, etc. For strong and weak electricity, other materials such as cables, switch boxes, switches, lamps, water supply and drainage pipes and accessories shall be provided by Party A, and Party B shall be responsible for installation and storage.

6. Requirements for building materials: All building and installation materials are qualified materials of regular manufacturers, and the certificate of conformity and purchase certificate of raw materials must be kept for future reference. All the cement is made of "Yinshantai" brand cement, and the steel products are made of Lianyuan Steel, Xianggang Steel and Leng Gang Steel. The reinforcement is assembled on site, and the downpipe is a unified plastic pvc drainage pipe. Concrete is commercial concrete and brick is qualified porous clay brick.

Seven, construction safety:

1. Party B shall abide by the safety management regulations of engineering construction. Strictly follow the safety standards and specifications, designate special personnel to be responsible, and actively take safety precautions to eliminate all hidden dangers of safety accidents.

2. Party B shall conduct safety education and training for all construction personnel, bearing in mind that safety comes first and everyone stresses safety.

3. Party B must sign labor contracts for all construction personnel and purchase full insurance. Party A shall not bear the economic losses and other losses caused by any safety accident.

4. In case of heavy casualties and other safety accidents, Party B shall immediately report to relevant departments in accordance with relevant regulations and handle them according to the requirements of relevant government departments. All expenses arising from the accident shall be borne by Party B. ..

Eight, the project price:

Nine, the project payment method:

1. After the contract is signed, Party B shall pay Party A a quality deposit of100000 yuan and start the construction.

2. After the foundation is completed and accepted,

3. Payment of project funds For each floor completed, Party A shall pay the project funds to Party B..

4. After the roof is accepted, Party A shall pay Party B the total amount of.

5. Party A shall pay Party B the total amount of. Ten thousand yuan.

6. Within one month after the acceptance of the project, Party A shall pay 97% of the total project cost to Party B, and the remaining 3% shall be used as the quality guarantee, which shall be paid in full one year later.

X other requirements: if party a changes during the construction, it shall be borne by party b within 2000 yuan, and party a will not pay any fees, and only the material fee will be charged for the excess. Party B must have the construction qualification of the corresponding project. Equipped with qualified technicians and construction workers. Ensure the high-quality and efficient construction of this project. All mechanical equipment, tools, templates and other production and living facilities required by Party B shall be provided by Party B. Party B shall obey and respect the reasonable arrangements and suggestions of Party A's construction personnel. Party B shall communicate with the project management personnel of Langli Industrial Park to coordinate the surrounding relations. Ensure the smooth progress of the project. Party B shall bear the electricity and water charges of the project and actively communicate with the power supply and water supply departments.

XI。 Liability for breach of contract:

1. Party B must complete the project within the specified time. In case of delay, Party A will be fined one thousand yuan (65,438+0,000 yuan/day) per day according to the contract date. If Party A fails to pay according to the contract requirements, it will pay 2% of the payable amount to Party B as liquidated damages. If Party B breaches the contract or stops work during the construction, Party A has the right to invite other construction teams to enter the site for construction.

2. Party A shall be responsible for the workers' wages and equipment rent caused by the default of project payment.

Twelve. This agreement is made in duplicate, one for each party. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (signature): Party B (signature):

Year month day:

Three related clauses in the housing construction contract:

★ Model housing construction contract

★ Housing construction contract

★ House Construction Contract Template (2)

★ Format of House Construction Contract (2)

★ Model housing construction contract

★ 5 copies of construction project contract model

★ Sample of civil housing construction contract

★ rural residential construction contract sample

★ Self-built housing contract

★ Civil Building Construction Contract Sample (2)