In the real society, agreements are more and more widely used in life, and signing agreements can protect both parties legally. Want to write an agreement but don't know who to consult? The following are nine construction project agreements that I have carefully compiled. Welcome to share.
Construction Project 1 Insurance PolicyNo. Agreement All Risks of Construction Project This insurance policy shall be truthfully filled in by the applicant and signed in detail as much as possible, as the basis for insuring our company against all risks of construction project. This application form is an integral part of the engineering insurance policy.
1. Names and addresses of interested parties in the project.
Other relationships among project owners, contractors and project subcontractors.
2. Name and address of the insured:
3. Name of the insured project
4. The insured project site
5. Insurance items, insurance amount/compensation limit and deductible for each accident.
5. 1 insured amount of material loss items, deductible for each accident
Construction works (including permanent and temporary works and materials used)
(1) project contract price
(2) Installation of materials or equipment provided by the Owner
Every accident refers to a series of accidents caused by an accident or an event.
Construction machinery and equipment (see attached table for details): sundry removal expenses, fire fighting expenses, professional expenses, other expenses and total insurance.
5.2 Special Danger Compensation Limit
Limit of compensation for dangerous types (not exceeding 80% of the insured amount)
Deductible for earthquake, tsunami, flood, storm and rainstorm (not less than 20% of the loss)
5.3 rate
5.4 Total insurance premium
6. Insurance period
6. 1 Construction period: _ _ month, from _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6.2 Limited liability warranty period: months, from year to year (which must be consistent with the warranty period stipulated in the project contract).
7. Have you taken out third-party liability insurance?
If yes, please specify: _ _ _ _ _ _ _ _
7. 1 compensation limit for each accident
7.2 Cumulative compensation limit
7.3 Deductible for material loss of each accident
7.4 Rates and insurance premiums
8. Engineering
8. 1 Building area, height, depth of underground building, span, number of floors, building structure and building materials
Construction machinery and equipment (see attached table for details): sundry removal expenses, fire fighting expenses, professional expenses, other expenses and total insurance.
9. Has any party involved in this project purchased insurance related to this project from other insurance companies?
Insurance company _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
10. Special terms and conditions
1 1. Comments
Please provide the following documents with the application form.
(1) engineering contract
(2) List of underwriting amount
(3) Engineering design documents
(4) the project schedule
(5) Engineering Geological Report
(6) Site overview
The applicant and the insured hereby declare that the above-mentioned situation is true, and have understood your company's explanation of the all-risk clause and additional contents (including the liability exemption part) of the installation project, and agree to insure the installation project against all risks according to the clause and additional contents.
The applicant and the insured (signature) _ _ _ _ _ _ _
Telephone _ _ _ _ _ _ _ _ _
Address _ _ _ _ _ _ _ _ _
Date _ _ _ _ _ _ _ _ _
An insurance company shall fill in the following contents:
Handler and date _ _ _ _ _ _ _ _ _ _ _
Insurer and date _ _ _ _ _ _ _ _ _ _ _ _
The Employer in Article 2 of the Construction Project Agreement (hereinafter referred to as Party A):
ID number:
Contractor (hereinafter referred to as Party B):
Legal representative:
ID number:
Now Party A entrusts Party B to build the original _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ In order to ensure the quality and complete the task on time, Party A and Party B have reached the following agreement on specific matters:
The terms of this contract are based on the principle of fairness and justice. This contract is signed by both parties through full consultation, and both parties must strictly abide by it.
1. Project name: addition of Party A's private residence.
II. Project Location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Three. Construction period: from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Four. Project negotiation: RMB 10,000 Yuan only.
Verb (abbreviation of verb) contracting mode: Party B undertakes Party A's storey-adding project in the form of contracting, and Party B fully contracts the contracted materials, including formwork, top frame, external wall grid and construction machinery, nails, iron wires, cable ties, surrounding colored strips, other detailed tools and all building materials.
Content of intransitive verbs: Build according to Party A's requirements and existing models, a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Building cement is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The floor is 3 meters high. Use _ _ _ _ _ brick, sweep the wall twice and paste _ _ _ _ _ _ brick. Leave _ _ _ _ _ _ _ windows in the east, and the specific location will be arranged by the landlord. Toilets, kitchens and balconies shall be plastered with 200×300 tiles to the top of the wall, and 300×300 non-slip tiles shall be plastered on the ground. Install stainless steel doors in toilets and kitchens, each with a window, build toilet seats and stainless steel hand basins, and make drainage and sewage pipes. Water pipes are made of plastic. The window material is Dongjiang aluminum, and the anti-theft net is voyage stainless steel, floating _ _ _ _ cm.
The above materials shall be of high quality. After completion, Party B shall do a good job in sanitation, fire prevention and theft prevention in and around the house. Make sure the venue is clean.
7. Party B must ensure the quality during the construction. If there are any problems that do not meet the quality requirements, Party B shall be responsible for the waste and expenses of the work.
Eight. Party B must take safety measures during the construction period. If Party B is not responsible for the accident liability and the expenses incurred due to ineffective safety measures, the relevant expenses shall be borne by the responsible party; If the neighbor's house is damaged, Party B shall be responsible.
9. If the urban management interferes with Party B's construction, Party A shall be responsible for the damaged building materials at the current cost. In addition, if it is necessary to modify the construction content and add engineering projects, it is necessary to negotiate with Party A, and both parties reach an agreement to achieve mutual respect and successfully complete the construction task.
10. After Party B enters the site, Party A shall be responsible for the water and electricity supply for the construction to ensure the power supply to the construction site. After the house is completed, Party A shall be responsible for water and electricity installation, including water and electricity materials.
XI。 Payment method: full payment within one week after completion.
12. This contract shall come into effect after being confirmed by both parties, and both parties shall strictly abide by it.
Thirteen. This contract is in duplicate, in duplicate. After the payment of the project settlement, Party A and Party B shall hold _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Employer:
_ _ _ _ _ _ _ _ _ _ _ _ _ _
Contractor:
Legal representative:
_ _ _ _ _ _ _ _ _ _ _ _ _ _
Project name: Workshop 2 and Workshop 3 of Crown Cake Shop Complex in West Ring of Shiqiao, Panyu District 1.
Party A: Crown Cake Shop in West Ring of Shiqiao, Panyu District, Guangzhou.
Party B: Guangzhou Panyu Fifth Construction Engineering Company.
According to the provisions of the Measures for the Administration of Safety Production Measures for Construction Projects in Guangzhou, the following agreement is reached on the cost of safety production measures for the construction of this project as a supplement to the construction contract.
1. Responsibilities of both parties: Party A and Party B shall abide by the Measures for the Administration of Safety in Production of Construction Projects in Guangzhou and implement them according to their contents.
2. According to the contents of the document, Party A is required to allocate the safety measures fee to Party B for special purposes, so as to meet the requirements of the Measures for the Administration of Safety Measures Fee for Construction Projects in Guangzhou.
3. According to the requirements of the document, Party A shall pay Party B 65438+ 0.22% of the project cost, totaling: 145500 yuan.
Four, security measures fee payment plan requirements
(1) 30% shall be paid if it meets the requirements for commencement upon examination by relevant departments.
(2) Pay 60% after passing the safety assessment of relevant departments.
(3) Pay 10% after the safety assessment on project completion is qualified.
Verb (abbreviation of verb) liability for breach of contract:
(1) If Party A fails to pay or fails to pay the safety production measures fee in time, resulting in the punishment of Party B's enterprise by the safety supervision agency, loss of reputation and inability to apply for the construction permit, Party B has the right to recover the losses caused by Party A and compensate it.
(2) If the cost of production safety measures in the project construction is withdrawn due to Party B's reasons, but it does not meet the relevant regulations of the safety supervision organization, Party B shall be responsible for it.
Six, the above terms * * * in line with. Matters not covered in this contract shall be settled by both parties through consultation.
Party A:
Party B:
(official seal)
(official seal)
Representative: representative:
Date: Year Month Day
Date: Year Month Day
Article 4 of the Construction Project Agreement Party A:
Party B:
In order to effectively strengthen the management of production safety and clarify responsibilities, Party A and Party B agree to sign this agreement through consultation for both parties to abide by.
I. Party A's responsibilities:
1. Formulate corresponding rules and regulations according to the relevant documents of the competent government departments and the company's relevant systems, and deliver them to the project department in time to actively guide Party B to do a good job in safety publicity.
2. Timely communicate and disclose the relevant requirements of safe production, civilized construction and environmental protection to Party B, and supervise and inspect Party B's implementation, and have the right to order Party B to make rectification where it has not implemented or not fully implemented.
Two. Responsibilities and obligations of Party B
1, Party B shall actively carry out safety publicity work and organize all construction personnel to carry out safety disclosure education before construction.
2. Party B shall formulate detailed rules for safe production, civilized construction and environmental protection applicable to this project, and earnestly implement them.
3. Obey the management of Party A, seriously accept the guidance and inspection of Party A and the competent department, and rectify the existing problems in time.
4. Everyone who manages the project department is responsible for safe production, civilized construction and environmental protection. In particular, full-time security officers must strengthen their sense of responsibility and improve their own quality. The project manager should actively cooperate with the safety officer.
5. Strengthen safety management, establish safety production responsibility system and safety inspection system, formulate safety production plan, and ensure safety production.
6. Work out safety production objectives: ensure that no major casualty accidents occur in the project, put an end to fatal accidents, control serious injuries within two ten thousandths, control industrial accidents to zero, and control general accidents within the scope stipulated by the state.
7. In case of an industrial accident, it shall be reported to the project department and the project leader immediately, and reported to the company in time. With the guidance and help of the company and the project department, it shall be properly handled and bear the responsibility for the accident.
8. This agreement is made in triplicate, one for each party, and one for the engineering department of Party A..
Party A: Party B:
Representative: representative:
date month year
Construction project agreement No.5: LCXMB (20xx)- 1
Project Name: Lead Mine Staff Residential Area 1 Group House Construction Project.
Management unit (Party A): Lead Mine Project Department of China Railway Eighth Bureau.
Construction unit (Party B): Sichuan Changyang Construction Engineering Co., Ltd. (White Construction Team)
Signing place: office of lead mine project department of China Railway Eighth Bureau.
Signature time:
Terms of engineering construction safety agreement
Name of Agreement: * * Lead Mine Staff Residential Area 1 Safety Agreement for Group House Construction Project.
Management unit (Party A): Lead Mine Project Department of China Railway Eighth Bureau.
Construction unit (Party B): Sichuan Changyang Construction Engineering Co., Ltd. (White Construction Team)
According to the provisions of the Company's Safety Management and Control Measures for Safe Production Environment and in combination with the specific conditions of this project, in order to ensure the safety in the construction process, the two parties reached the following agreement.
1. Project overview
1. 1 project name:
1.2 project site:
1.3 main contents of the project: 1 group project and temporary facilities, safe and civilized construction, getting on and off building materials and materials, operation and maintenance of construction machinery, etc.
1.4 planned commencement date: August 27th, 20xx.
1.5 planned completion date: all construction personnel will be evacuated from the site after the project is completed.
2. Responsibilities and obligations of the construction unit (Party B)
2. 1 construction safety responsibility area (scope): the whole construction site; , all kinds of building materials and materials production, stacking site; Construction of sidewalks outside the fence; The construction unit (Party B) guarantees to carry out construction work in this area (scope) and take full responsibility for construction safety.
2.2 Establish and improve the construction safety guarantee system, and implement the safety responsibility system step by step. The person in charge of the construction safety of this project is fully responsible for the construction safety of this project, and the person in charge of the site safety of the project is resident in the construction site and is responsible for the safety management of the site construction.
2.3 According to the nature and characteristics of this project, the safety measures to ensure safety include the safe use of site construction personnel, machinery and equipment, and the safety of surrounding vehicles and pedestrians. The main safety measures are to implement the Law on Safety in Production, establish a safety guarantee system, set up full-time safety officers, implement the responsibility system for safety in production, strictly implement safety measures and safety operation procedures, and conduct safety education and training for construction personnel. Double-row scaffolding, fences, etc. The construction site shall be provided with isolation and protection of the erection workers, stacking of materials in and out, garbage removal, environmental protection, four-port and five-prevention, on-site fire fighting and other work, so as to achieve safe and civilized construction.
2.4 Provide the management unit (Party A) with information about the construction plan, scheme, on-site construction organization and on-site construction management personnel, so that the management unit (Party A) can grasp the construction situation and supervise the whole process of construction safety.
2.5 do a good job in the protection of communication, electric power, water supply and drainage facilities and equipment. If the existing equipment such as communication electricity, water supply and drainage pipe network is damaged due to improper construction protection, it must be restored to the original equipment state in time; If the existing equipment such as communication electricity, water supply and drainage pipe network is damaged, it should immediately notify the equipment management unit, cooperate with the equipment management unit to repair it, and bear all the repair costs. Take full responsibility for equipment damage caused by improper construction protection, affecting normal production (work) and life or causing accidents.
2.6 Adhere to civilized construction, strengthen the protection of surrounding environment, pedestrians and vehicles, and manage construction machines and materials. If improper construction management and protection, improper placement and management of engineering waste of machinery and materials affect normal production (work) and life or cause accidents, take full responsibility.
2.7 Strengthen the life safety protection and management of construction personnel, and take full responsibility for life safety accidents caused by poor management and inadequate implementation of protective measures.
2.8 Due to the project construction, it is necessary to dismantle and relocate the communication electrical and water supply and drainage pipe network equipment, and go through relevant formalities with the equipment management unit according to regulations.
2.9 Take the initiative to accept the supervision and inspection of construction safety by the management unit, and rectify the safety problems found in the inspection within a time limit as required.
2. 10 Other responsibilities and obligations: 1. Party B shall actively cooperate with the management personnel to do their own safety protection measures and on-site safety protection work to avoid the occurrence of liability accidents.
2. Party B shall bear all legal responsibilities for personnel, equipment and vehicle safety accidents caused by illegal command and illegal operation.
3. After a safety accident happens to Party B, the person in charge of Party B shall timely arrange rescue treatment, and shall not delay for an excuse. All expenses incurred in the accident will be borne by Party B. ..
2. 1 1 Party B shall strengthen the management of construction personnel, strictly abide by the relevant provisions of the Regulations on Comprehensive Management of Social Security in Yunnan Province, and personnel unrelated to the project shall not stay at the construction site during the construction period. The construction personnel must go through all the formalities, and the hired workers must hold ID cards and temporary residence permits, and submit a complete list to Party A, who will report it to the local police station for the record to strengthen management.
2. 12 The construction party shall do a good job in comprehensive management of fire prevention, theft prevention, explosion prevention and public security at the construction site. Establish and improve various management systems. According to the regulations of Party A, fire fighting equipment shall be hung and equipped at the construction site. No accidents are allowed. In case of the above accidents, all responsibilities shall be borne by the construction unit, and Party A shall not bear any responsibilities.
2. 13 The construction team should strengthen the management of the construction site, and it is forbidden for other personnel and children to enter the construction site. The construction unit should take full responsibility for all accidents caused by this.
3 responsibilities and obligations of the management unit
3. 1 Supervise the whole construction process involving the safety of personnel, equipment and vehicles.
3.2 Communication, electrical, water supply and drainage pipe network caused by construction
If the equipment is damaged, it should be repaired in time to minimize the loss and impact.
3.3 Actively do a good job in safety supervision, inspection and cooperation, and try our best to provide conditions for engineering construction.
3.4 During Party B's construction, the management party (Party A) has the right to educate and punish the hidden dangers of safety and quality and illegal acts caused by Party B's construction, and impose a fine of 100 to 5,000 yuan depending on the seriousness of the case.
4. The accident must be reported step by step and shall not be concealed.
5. Entry into force and termination of the agreement
5. 1 this agreement shall come into effect after being signed by both parties and reported to the person in charge of the project department for approval or verification, and shall become invalid after the project is completed and the relevant expenses are liquidated.
6. For matters not covered in this agreement, both parties may sign a supplementary agreement, which has the same effect as this agreement.
7. As an annex to the subcontract, this agreement is made in duplicate, with each party holding one copy.
Management unit: Lead Mine Project Department of China Railway Eighth Bureau of Party A.
Signature of representative:
Manager of Safety and Quality Department of Project Department:
date month year
Construction unit: Party B Sichuan Changyang Construction Engineering Co., Ltd. (White Construction Team)
Signature of representative:
date month year
6×××× Construction Engineering Company (Party A)
Xx Decoration Design Company (Party B)
In order to give full play to the advantages of both parties, seek development, and gradually establish a group company in the future, both parties have entered into this agreement through full friendly consultation.
1. Establish close technical cooperation. In the future, all the engineering and decoration design tasks undertaken by Party A will be entrusted to Party B. ..
2. Party B guarantees that after receiving the task, it will immediately organize a capable design team led by a senior engineer to put forward the design scheme on 10, and complete all the design drawings within one month after the scheme is approved.
3. In order to ensure the design quality, Party A will provide Party B with all necessary construction technical data without reservation.
Four. The decoration construction team is organized by Party A, and the decoration project is organized and implemented by Party A. During the construction period, Party B will send senior engineers to supervise the construction to ensure the quality of the project.
5. Party A shall pay Party B the design fee at the rate of ×× 0.000 of the total cost of the decoration project.
6. This agreement shall come into force as of the date of signing.
Seven. This agreement is made in duplicate, one for each party.
Attachment: Letter of Intent for the establishment of XX Building Decoration Engineering Group Company.
Party A ×× Construction Engineering Company (Seal)
Legal Representative: ×× (signature)
Party B ×× Decoration Design Company (Seal)
Legal Representative: ×× (signature)
* * * * Year * * Month * Day
Address of Party A: ×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××
Postal code: ×× Postal code: ×× Postal code: × Postal code: × Postal code: × Postal code: Postal code: Postal code: Postal code: Postal code: Postal code: Postal code: Postal code: Postal code: Postal code
Telephone and fax: ××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××
Bank account number: ×× Bank account number: ×× Bank account number: ×× Bank account number: ×× Bank account number: ××× Bank account number
Contact: ××××× Contact: ××××××
Article 7 of the construction project agreement Party A: Heilongjiang Jinyuan Real Estate Development Co., Ltd.
Party B:
Through negotiation between Party A and Party B, Party A agrees to hand over the renovation project of Meiguan Street shantytown in Xiangfang District-earthwork to Party B for construction. We have reached the following cooperation agreement:
I. Overview of the Project:
Reconstruction Project of Meiguan Street Shaft in Xiangfang District 1
2. Project location: Meiguan Street, Hacheng Road, Xiangfang District
3. Contract scope: earthwork excavation (about 200,000 meters)
Second, the determination of the unit price of both parties:
Before entering the construction site, Party A and Party B will sign a formal one-price construction contract. The earthwork price shall not be lower than the current market price, and may also be implemented according to the quota.
Third, the determination of earthwork:
Calculate earthwork volume according to the excavation scheme of foundation pit.
Four. Payment method:
Every time you dig 30,000 meters of soil, you will be paid for the project.
Verb (abbreviation for verb) deposit and return:
Party B pays the project security deposit of RMB 300,000.00 Yuan only, which will be refunded together with the first earthwork payment when Party B enters the site for construction.
Party A: Party B:
date month year
Article 8 Construction Project Agreement: Employer: (hereinafter referred to as Party A)
Approve projects according to the font size file. The approved investment is10,000 yuan, and the construction area is ××× m2. This project is approved by the county construction bureau, and the construction team (hereinafter referred to as Party B) undertakes the construction task. In order to clarify the responsibilities, both parties have reached an agreement through consultation, and both parties hereby enter into this agreement and abide by it.
A, engineering tasks:
1. Project name:
2. Number of projects:
3. Signing form:
Second, the construction period:
1. This project started on and was completed on.
2. We must strictly abide by the stipulated date and create convenient conditions for the other party in the spirit of seizing every minute to ensure the completion on schedule, otherwise we will handle it as appropriate.
Third, the project price:
1. The total cost of this project is 10,000 yuan.
2. The total budgeted salary is RMB.
3. All quotas are implemented according to the unified quota of the annual capital construction and installation project in Shanxi Province.
4. The charging standard shall be implemented in accordance with documentNo. Jiao Jian Zi 1.
5. Payment method of wages and expenses: pay by stages according to the progress of the project, settle the accounts in one lump sum after completion and acceptance, and go through the payment procedures according to the regulations of the bank.
6. Party B shall pay% of the construction management fee to the county construction bureau, which shall be deducted by Party A and transferred to the construction bureau.
Four, project management and quality acceptance:
1. Party A and Party B shall appoint a special person to form an engineering quality inspection and acceptance team, and conduct acceptance by sections according to the progress of the project. Do not meet the requirements of engineering quality, should be timely rework. After the project is completed, the county construction bureau will participate in the comprehensive acceptance of the project.
2. Take the national construction acceptance specifications and construction drawings as the acceptance criteria. If there is any violation of the standards, find out the reasons and deal with them in a timely manner according to state regulations.
3. If there is any major change in the construction, Party A shall notify Party B in advance after obtaining the consent of the original planning unit, and go through the change procedures at the same time.
4. The construction unit comrades are responsible for this project, and both parties cooperate with each other to guide the construction.
Verb (short for verb) security:
Strengthen safety education and inspection to prevent accidents and ensure safe construction. In case of personal injury or death, Party B shall be responsible for handling the expenses. Party A shall actively assist in solving the medical rescue work.
Six, materials, machines and tools supply:
1. Materials shall be piled up in proper places and a certain amount shall be reserved before construction to ensure that Party B's construction needs can be met. In case of work stoppage, Party A shall pay Party B all wages (calculated according to average wages) during the work stoppage.
2. Party A is responsible for large tools, scaffolding, springboard, etc. Party B shall be responsible for small tools and means of transportation. If it is difficult for Party B to solve the problem, Party A shall give great assistance.
3. Party A is responsible for the power supply and water supply required by the construction site. In case of insufficient water and electricity supply, Party A is responsible for arranging other work. Otherwise, Party B's salary during this period shall be paid by Party A. ..
Seven. For matters not covered in this agreement, please refer to the supplementary agreement.
Eight, this agreement shall come into force as of the date of signature by both parties and approval by the county construction bureau.
Nine. This Agreement is made in octuplicate, one for each party, and submitted to relevant units for future reference.
Construction unit:
Person in charge:
Construction unit:
Person in charge:
date month year
Article 9 of the Construction Project Agreement Party A:
Party B:
Party A needs to build a high-rise private residence, which has been awarded to Party B. In order to ensure the smooth construction, Party A and Party B have reached the following agreement on specific conditions and building requirements through consultation:
1. Party A has built a high-rise building with a total area of about square meters. Now,
This contract shall be undertaken by Party B in the form of contracting and materials, and the contract price shall be calculated at RMB per square meter, totaling RMB only. According to the projected area, Party B starts from the foundation (including the broken pile by workers).
Second, Party B must have construction machinery (such as elevators, mixers, vibrators and other mechanical equipment).
3. Party A is responsible for building materials, while Party B is responsible for formwork (note: there must be two layers of formwork) and jacking wood.
Party B shall be responsible for arranging raw bamboo, nails, iron wire, adhesive tape, safety net, grinding wheel for tiling and all appliances and expenses of the building.
Four. Party B shall pay attention to safety during construction. In case of accidental casualties of workers, all responsibilities and expenses shall be borne by Party B. ..
5. During the construction period, the construction personnel shall abide by the local village rules and regulations, and all expenses such as household registration fees and public security fees shall be borne by Party B. ..
6. Party B shall carry out the construction according to the design drawings, including the construction of septic tanks (2) and sewers. If there are quality problems that need to be reworked, all materials and labor costs shall be borne by Party B..
Seven, after each layer of cement is paved, it is not allowed to work in this layer within 2 days, and the template must be removed after 20 days, and it is not allowed to be removed in advance.
Eight, in front of the building exterior wall tile, mosaic on three sides, the first floor facade tile, the first floor.
Terrazzo meters should be used in the hall, and the sidewalks in the building should be posted.
2. 1 m high wall skirt brick, stair tread skirt brick, kitchen and bathroom tile to the top of the wall, stair walkway.
2. 1 m high wall skirt brick, with floor tiles on each floor and wall tiles in the room.
2. 1 m, the kitchen should be built with a stove and tiles. The lobby and room on the second floor are posted.
1.5m high wall skirt (jump 30cm from each window sill on the second floor).
Nine, before the batch swing, clean up all the sundries in the house before the batch swing. After the completion of the project, all sundries must be cleaned up to keep the room clean and tidy.
X. Payment method: according to the payment schedule, 50% will be paid in advance, and the remaining 50% will be paid in three months after the completion of the project.
ten
1. The construction time given by Party A to Party B is _ _ _ _ _ _ _ _ _ _.
ten
2. This contract is made in duplicate, one for each party, and shall not be violated.
Signature of Party A:
Signature of Party B