Project Agreement

As society develops step by step, agreements are closely related to our lives. Signing an agreement can protect the legitimate rights and interests of the parties involved. Want to write an agreement but don’t know who to ask? Below are 7 project agreements that I compiled. Welcome to read and collect them. Project Agreement Part 1

Party A:

Party B:

Party A, in order to grasp the progress of the project construction, ensure the quality of the project construction, and complete it safely and smoothly in Qijiang, Chongqing City County Gongxin Building Materials Co., Ltd. has contracted this sub-project to Party B for the floor construction task of prefabricated houses in order to clarify the responsibilities of both parties. After negotiation between both parties, the following agreement was reached:

1. Project name: Chongqing Qijiang County Gongxin Building Materials Co., Ltd. movable board house floor hardening project

2. Project location: Within Qiaohe Industrial Park

3. Project nature: labor cost (note: including materials).

4. Labor cost work scope, content and price.

1. Scope and content of work: The floor is flat and the C20 concrete 100-thick floor hardening (including C20 concrete material) is about 15*8 meters; (all labor tools and safety helmets required during the construction are provided by Party B shall purchase it by itself and send personnel to cooperate with the construction personnel in super-leveling and laying out the lines, etc.).

2. Labor price: floor hardening (including C20 concrete material and transportation of all materials and machinery to the site), the price is 42.4 yuan/M2 (including tax stamp), and the actual area will be charged after the work is completed. Settlement.

5. Quality level requirements: Upon Party A’s on-site acceptance, the products must meet the qualified standards.

6. Payment of labor costs: After the work is completed, Party B shall present the tax stamp and Party A shall make a one-time payment.

7. Party B must ensure safe production. Party B is responsible for the safety facilities and protective equipment during construction, and illegal operations are prohibited. If any accidents are caused by Party B's poor management, inadequate protection, or man-made accidents, Party B shall bear its own economic and civil liabilities.

8. Party B must ensure quality. Party B will be fully responsible for any direct losses caused by rework or shutdown due to unqualified quality.

9. The quality and safety of Party B during construction must be supervised and inspected by Party A. Party A has the right to punish violations, regulations and disciplines in accordance with the safety agreement and relevant management regulations.

10. The transportation, accommodation and daily life of Party B’s personnel shall be taken care of by Party B.

11. Construction period: According to Party A’s plan and consultation between both parties, construction will start on xx, month xx, 20xx, and end on xx, month xx, 20xx.

12. This agreement shall come into effect upon signature and seal of both parties. Any matters not covered shall be subject to the supplementary agreement.

13. This agreement is made in duplicate, with Party A and Party B each holding one copy, and each copy is equally valid.

Party A: Chongqing Qijiang County Gongxin Building Materials Co., Ltd. Party B:

Year, month, day, year, month, day Project Agreement Part 2

Party A: ____________________ < /p>

Party B: ____________________

Due to project construction needs, Party A contracts the following projects to Party B for construction. In accordance with the "Economic Law of the People's Republic of China" and the "Construction Law of the People's Republic of China" as well as the construction management regulations and construction specifications, after full negotiation between Party A and Party B, the following terms have been reached, and both parties must strictly abide by them.

1. Project location and name

1. Project location: ____________________________

2. Project name: ____________________________

2. Contract content Price and construction period

1. Contract content includes all civil engineering works of the sewage station.

2. The project cost______ is a one-time package.

3. Project duration: All contract contents shall be completed within ______ from the start of construction.

3. Payment and Quality

1. 30% will be paid after the sewage floor is accepted and accepted, 70% will be paid after the main inspection and acceptance is passed, and 95 will be paid after the contractor passes the completion inspection and acceptance. %, and the rest of the project will be paid in one lump sum upon expiration of the warranty period.

2. Project quality: qualified

4. Party A’s responsibilities: help Party B solve the water source and power supply, assist Party B to solve problems at the construction site, provide Party B with construction drawings and explain them.

5. Party B is responsible for carrying out construction in strict accordance with the construction drawings and relevant specifications. It must abide by relevant regulations on safe and civilized construction and bear the responsibilities and expenses caused by safety and quality.

VI. Warranty period and warranty deposit

1. Warranty period: Six months from calendar days after completion and acceptance by the contractor.

2. Warranty deposit: 10% of the total contract price is the warranty deposit, and the entire contract price will be paid after the warranty period expires.

4. Contract Effective Date: The contract effective date will take effect immediately after being signed by both parties. When the warranty period expires and the warranty deposit is paid, it will automatically become invalid.

Party A: _______________________

Party B: __________________

Signature: _______________________

ID number: __________________

Date: ______year______month______day

Date______year______month______day Project Agreement Part 3

Party A:

p>

Address:

Legal representative:

Contact number:

Fax:

Party B:

Address:

Legal representative:

Contact number:

Fax:

In accordance with national laws and regulations, the parties hereto Based on the principles of mutual benefit, fairness, equality, voluntariness, honesty and trustworthiness, the two parties cooperate with each other with complementary advantages, share resources, and maximize the benefits of all parties. After full consultation, they reached a consensus on cooperation and formed the following share terms.

1. After research and decision by the cooperating shareholders of the project, the project will implement an internal contracting joint-stock operation model.

Internal division of labor in the project department: Party A is the main contractor, Party B is the auxiliary, and the construction is mainly Party B, and Party A is the auxiliary. Sign a construction contract.

2. Party A is responsible for contracting the project, coordinating the contracting unit and related channels, Party B is responsible for project quality, safety and related economic and legal responsibilities, financial management, double-printing supervision of project payment, and safeguarding the interests of both parties.

3. Responsibilities of Party A

1. Party A is responsible for undertaking the contact engineering business and doing all the work before signing the contract.

2. Party A shall bear all costs in the early stage of signing the project contract contract.

3. Coordinate and cooperate with the contract issuing unit during the construction process.

4. Party A’s business personnel and number of personnel shall be arranged by Party A according to the workload. Their labor remuneration and business expenses shall be advanced by Party A. Party B will not bear the responsibility if no valid project is signed.

5. Party A will send representatives or engineers to supervise management and project quality progress, etc.

6. Responsible for assisting in the procedures required for relevant work and business, organizing construction and management.

IV. Responsibilities of Party B

1. Party B is responsible for all fees paid after signing the contract and the construction plan.

2. Responsible for the execution of the project contract with the contracting unit and the completion and acceptance of the construction project. And assume the project responsibilities according to the contract requirements.

3. During the construction contract period, Party B will comprehensively manage the project and assume full responsibility for safety and quality. Party A will have nothing to do with any work safety accidents and will independently use, maintain and manage the machinery and equipment. If any mechanical losses and personal injuries caused by illegal operations during construction, or refusal to pay for the project due to project delays, Party B will be responsible and assume corresponding liability for the project.

4. Provide legal and valid construction qualifications to sign a construction contract, and assume all legal and economic responsibilities and debt disputes for the project. Party A is not responsible for construction management and debt disputes, and Party B pays various taxes and fees in accordance with national regulations.

5. Party B shall pay Party A the profit share in strict accordance with the contract requirements. If payment is due but fails to be made on time, _____% of the amount payable will be charged daily as liquidated damages.

V. Profit Distribution and Payment Method

1. Profit Distribution: After consensus reached by both parties, Party A and Party B agreed that the theoretical total price of the construction contract should be __________ yuan (the total project price is based on The actual occurrence shall prevail). Party B pays Party A for the early investment and later co-management profits equal to __________% of the total project price, that is, Party B should pay Party A __________ yuan (the actual lump sum profit is __________ yuan). The profits earned by Party A can be taxed by Party B withholding and payment.

2. Payment method: Within two working days after the main contract is signed and Party B obtains the construction drawings, geological survey reports and other relevant procedures and submits them to the pile intersection, Party B shall pay Party A all the preliminary fees in one lump sum. __________ Yuan (uppercase ____________________ Yuan). The second payment to Party A shall be made to Party A when the contract-issuing party delivers the stake, in the amount of ____________________ yuan (in capital letters ____________________). The third payment will be made to Party A two working days after entering the site, and will be paid to Party A on the first working day after __________% of the first batch of advance payment is received. All the above amounts will be transferred to the public account according to Party A's requirements, and the remaining amount will be used as Party A's partnership capital contribution.

Payment will be made according to the progress of the project. On the last working day of each month, an amount of __________% of the actual completed project per month will be transferred to the account designated by Party A.

6. Relevant Agreements

1. Party A sends an on-site person in charge, who is authorized by Party B. Party B’s monthly actual project quantity report (copy) must be handed over to the person in charge of Party A , as the basis for monthly project settlement, the person in charge of Party A will not participate in Party B's construction and on-site management (the salary of the person in charge of Party A shall be borne by Party A). When Party A's expenses are fully settled, this agreement will automatically terminate and expire, and the party will withdraw. Responsible personnel of Party A. (Monthly transfer according to the amount agreed in the contract). Party A will be solely responsible for any losses caused to Party B due to Party A's violation of regulations and interference with Party B's normal operation and management activities, and shall bear the corresponding economic losses.

2. Both parties perform the contract conscientiously. If Party B fails to pay (pay off) the profits to Party A in a timely manner as stipulated in the contract, Party A can directly deduct the amount owed by Party B to Party A from the project payment allocated to Party B by the project contractor. Party B's dues shall be paid, and a liquidated damages of __________% of the default amount shall be sought every day. Party B shall cooperate unconditionally and issue corresponding tax-paying bills. If the circumstances are serious, Party A shall have the right to request the contract-issuing party to terminate Party B. The right to contract the project and all losses shall be borne by Party B.

7. Liability for breach of contract

1. If Party A and Party B fail to implement this agreement or have a dispute, it will be resolved through negotiation. If the negotiation fails, it will be resolved by the legal department, and all legal fees incurred thereby , the agency fees shall be borne by Party B, and Party B shall bear __________% of the total cost as liquidated damages.

2. For matters not covered above, Party A and Party B may formulate a supplementary agreement based on the specific circumstances. The supplementary agreement shall have the same legal effect as this contract.

8. Contract Signing

This contract is made in __________ copies. Party A and Party B each hold __________ copies. It will take effect from the date when Party A signs a formal written contract with the contract-issuing unit. It will automatically expire after all the profits due to Party B are settled. This agreement will be extended simultaneously according to the extension of Party A's construction contract and has the same legal effect.

Party A:

Signature of legal representative:

Signing time: ___________year___________month___________day

Party B:

Signature of legal representative:

Signing time: ___________year___________month___________day Project Agreement Part 4

Party A: Zhongfu Construction Co., Ltd. (hereinafter referred to as Party A)

Party B: Building 5, Pingguoyuan District 4

After friendly consultations between Party A and Party B, Party A now plans to cooperate with Party B in 20xx The following compensation agreement has been reached regarding the noise, night construction, dust and other disturbances caused by the construction site of the low-rent housing project in Plot H of the transportation hub in Apple Orchard:

1. A Party B shall compensate Party B with a one-time compensation of RMB 800.00 (eight hundred yuan) per household for disturbing the people.

2. Payment time and method:

Payment time: October 30, 20xx

Payment method: cash payment

3. Party B must ensure that it will no longer ask for any fees from Party A, complain to Party A, or interfere with the construction and operation of Party A's projects.

4. This agreement is the result of equal and voluntary negotiations between both parties. It is the true expression of both parties’ intentions. Party A and Party B have read the full text and have no objection.

5. This agreement is made in two copies. Party A and Party B each hold one copy. Each party shall use this as a basis to abide by its commitments and fully and effectively perform this agreement.

6. This agreement will be valid until December 30, 20xx, and will take effect upon signature.

Party A: Signature: Party B: Signature: Telephone: Time: Project Agreement Part 5

Name of Guarantor:

Contract Number: Year No.< /p>

Address:

Legal representative:

Financial institution where the account is opened: Account number:

Telephone: Postal code: Fax:

p>

Name of lender:

Address:

Legal representative:

Telephone: Postal code: Fax:

< p> Name of the borrower:

Residence:

Legal representative:

Financial institution where the account is opened: Account number:

Telephone: Postal code: Fax:

Date of signing the contract: year, month and day

Place of signing the contract: Province (city) city county (district)

Borrower (below) (hereinafter referred to as Party A):

Lender (hereinafter referred to as Party B):

Guarantor (hereinafter referred to as Party C):

Due to the request of Party A, Party C We are happy to provide guarantee for the year-numbered contract signed by A and B. After review, Party B agrees to Party C as the guarantor for Party A's repayment.

Party A, Party B and Party C have reached consensus through consultation and entered into this contract in accordance with the following terms.

Article 1 The guarantee amount of Party C shall be the principal (in capital letters) of the (currency) funds borrowed by Party A from Party B based on the Nian Zi No. Contract (hereinafter referred to as the main contract) and the corresponding interest, cost.

Article 2 Party C shall be jointly and severally liable for the payments listed in the previous article. If Party A fails to repay as stipulated in the main contract

Article 5 After this contract takes effect, if Party A and Party B need to extend the loan period under the main contract or change other terms of the main contract, they shall obtain the consent of Party C , parties A, B, and C reach a written agreement.

To pay the principal, interest and corresponding expenses of the loan, Party B has the right to directly claim reimbursement from Party C. Party C guarantees to repay the above-mentioned amount within one business day after receiving Party B’s written request for payment

.

Article 3 Party C’s guarantee liability is not guaranteed by any instructions from Party A’s superior unit, changes in Party A’s status and financial status, any agreement or document signed between Party A and any unit, or this guarantee contract. void or excluded from the main contract.

Article 4 If Party C’s organization is changed or cancelled, Party C shall notify Party B and Party A in writing 3 days in advance. All obligations under this guarantee contract shall be borne by the changed organization; or Party A shall and Party C implement the new guarantor accepted by Party B.

Article 5 After this contract takes effect, if Party A and Party B need to extend the loan period under the main contract or change other terms of the main contract, they shall obtain the consent of Party C and a written agreement shall be reached between Party A, Party B and Party C. protocol.

Article 6 After this contract takes effect, Party C has the right to supervise Party A’s funds and property, and has the right to require Party A to provide its financial statements and other materials, and Party A should provide them truthfully.

Article 7 The guaranteed amount of this contract will be deducted accordingly as Party A repays or Party C pays off the principal, interest and fees stipulated in Article 2 of this contract.

Article 8 After Party C repays the principal, interest and expenses of the loan on behalf of Party A, it has the right to seek repayment from Party A.

Article 9 During the validity period of this contract, any party A, B, or C shall not change or exclude this contract without authorization. If the terms of this contract need to be changed, a written agreement must be reached through negotiation and consent by the three parties.

Article 10 Liability for breach of contract

1. If Party C violates the provisions of Article 2 of this contract and fails to repay due debts on time, Party B shall have the right to entrust the financial institution with which Party C opens an account to directly deduct money from Party C's deposit account, and may pay % of the total guarantee amount depending on the circumstances. Collect liquidated damages from Party C.

2. If Party C violates the provisions of Article 4 of this contract, the changed institution shall pay liquidated damages to Party B at the rate of % of the total guarantee amount. If it causes economic losses to Party B and the amount of liquidated damages is insufficient to make up for the losses, Party B shall also be compensated for its direct economic losses.

IV. If Party A and Party B violate the provisions of Article 5 of this contract and extend the loan period under the main contract or change other terms of the main contract without the consent of Party C, Party C may exclude its guarantee obligations on its own.

Three. If Party A violates the provisions of Article 4 of this contract, Party B has the right to stop issuing new loans and recover the principal and interest of the loans already issued in advance. Project Agreement Part 6

Party A: __________________

Party B: _____________

Based on the principles of good faith, friendship and mutual assistance, both parties sign this shareholding contract. . Both Party A and Party B may perform their duties and fulfill this agreement in accordance with the following terms:

1. Time for equity participation: from _____ month _____ day _____ year to ______ year ______ Ending on ____ of the month, ***year is counted.

2. Amount of investment: Party B’s investment is *** RMB _____ yuan, calculated as ___ shares.

3. Calculation of capital assets: RMB _______ yuan is the total assets (calculated on the day of signing), and a total of 100 shares (this is the original stock). Party A holds ___ shares and Party B holds ___ shares.

IV. Dividends: ① The ______ day of each month is the dividend day, and a shareholders’ meeting will be held at the same time.

②Dividends are distributed according to the amount of monthly net profit.

5. Withdrawal of shares, withdrawal of shares midway.

a. When the contract reaches 1/3, 1/3 of the amount invested at that time will be refunded, and the dividends distributed will also be calculated at 1/3.

b. When the contract expires at 2/3, 2/3 of the amount invested at that time will be refunded, and the dividends distributed will also be calculated at 2/3.

c. When the contract expires, the average net profit of the 12 months before the date of withdrawal will be multiplied by 18 months as the calculation standard for total assets, and then refunded based on the number of shares.

6. Net profit: Monthly profit (total performance) after deducting all payable expenses, and then deducting administrative fees, depreciation and amortization fees (based on 3 years as the calculation criterion, as decoration and hardware equipment updates (Used) is the net profit for the month.

VII. Others: ① During the contract period with Party A, Party B shall not make any profit-making investment with anyone in the _____ area.

② If Party B does not renew the contract after the expiration of the contract, Party B shall not open a local hair salon or beauty shop within one year after the expiration of the contract.

③ Half a year before the expiration date of the contract, Party A and Party B must decide whether to continue cooperation, but Party B retains the right to decide. If Party B decides to continue cooperation, Party A may not refuse.

④ Card funds will not be included in the monthly performance account before consumption, and will be kept by the company to maintain customer credit.

⑤The monthly financials are kept by Party A and supervised by Party B. Dividends will be distributed after the monthly accounting is signed.

8. If there is any amendment to the above contract, it shall be amended with the consent of both parties A and B.

9. This contract is made in duplicate, with Party A and Party B each holding one copy.

Party A: ____________ Party B: __________________

Representative: __________ ID number: _________

Signing date: __________ Project Agreement Part 7

Party A (full name): Shanghai Fifth Construction Co., Ltd.

Party B (full name):

According to the "Contract Law of the People's Republic of China", "China "Construction Law of the People's Republic of China", "Shanghai Construction Market Management Regulations" and relevant laws and regulations, follow the principles of equality, voluntariness, fairness and good faith, combined with the actual situation of this project, in order to clarify the responsibilities, rights and obligations of both parties , this contract is entered into after consensus reached between Party A and Party B.

Article 1 Overview of the Project

1.1 Project Name: . 1.2 Project Location: .

1.3 Contract scope and content: .

1.4 Building area: .

1.5 Party A may increase, decrease or adjust the scope and content of Party B’s contract as necessary, and may also modify the scope of Party B’s contract A certain sub-item, a certain product, semi-finished materials, etc. shall be separately designated as a construction unit or supplier. Party B shall accept it unconditionally and shall not use this as a reason to adjust the contract unit price and total price of the remaining projects.

1.6 Contracting method: This project adopts "contracting machine consumption, construction period, quality, safety, civilized construction, environmental protection, and the contents of this subcontract involved in the general contract between Party A and the owner." , Party A’s commitment to the owner and the owner’s regulations and restrictions on Party A are fully responsible for all work content within the scope of this contract, and handles the relationship between the competent government departments and the community.

< p> Article 2 Contract Duration

2.1 Party B shall make preparations for the construction site within days after receiving Party A’s notice of entry.

2.2 Contract Duration: The project will start on the day, month and year.

Until the completion date of year, month and day, *** calendar days.

2.3 When the construction period is delayed, Party B shall pay Party A liquidated damages, which shall be one day for each delay

Days, calculated based on the total price of this project, accumulated on a daily basis.

Article 3 Quality

3.1 The quality level of this project is.

3.2 When the quality fails to meet the requirements, Party B must pay liquidated damages to Party A, which shall be.

3.3 The quality of this project must be approved by Party A, the owner, the supervisor, and the quality supervisor Acceptance and confirmation of the station.

3.4 Party B must strictly comply with the construction drawings, design instructions, design changes, technical approval orders and other engineering documents of this project and the current national and local quality acceptance specifications issued. Standards and regulations require organizing construction. Accept inspections and inspections from Party A, supervisors, and owners at any time, and provide convenient conditions for inspections.

3.5 If Party B fails to meet the quality level agreed in this contract, Party A has Party B has the right to instruct Party B to carry out rework, and all construction period and economic losses caused thereby shall be fully borne by Party B. If Party B fails to meet the agreed quality level, all fines caused by the owner shall be fully borne by Party B.

< p>3.6 If a general quality accident occurs to Party B during construction, Party A will propose a treatment plan. After being approved by the construction unit, Party B will be responsible for handling it. The results of the treatment will be reported to the relevant government departments by Party A. If a major quality accident occurs, it must be handled in accordance with government regulations.

3.7 In order to maintain its reputation, brand, and image, Party A will conduct irregular inspections on the quality of this project, and issue quality warnings during the inspection process. In the rectification notice, Party B must complete the rectifications within the specified time limit. The fine notice issued to Party B must state the reason for the fine and be fully borne by Party B. Party B must sign and accept the fine. Party B's refusal to sign will not affect the validity of the fine. Effective.

Article 4 Environmental Safety Standardization

4.1 The on-site civilized construction requirements of Party B for this project are: establish an on-site safety production guarantee system, pass the certification of the safety production guarantee system and achieve " "Shanghai Standard Chemical Construction Site" standard requirements, and shall bear the costs of safe implementation of standards, integrated implementation of standards, and various inspections and fines by superior departments. If the above standards are not met, Party A will impose % of the total contract price on Party B Fine.