Does the as-built drawing need the seal of the supervisor?
As-built drawings do not need the seal of the supervisor. Where the project is constructed according to the construction drawing, the completion drawing preparation unit shall affix the completion stamp in the blank space near the drawing mark of the construction drawing (clean blueprint), and the relevant personnel shall personally sign it.

For general drawing changes, the preparation unit can directly redraw the construction drawing according to the design change basis, indicate the change and modification basis, and affix the completion stamp and sign it.

If the major changes or changed parts found in the structural form, process, layout and project cannot be redrawn on the original construction drawing, the completion drawing shall be redrawn and stamped with the completion stamp. The redrawn drawing must have the drawing name and drawing number, and the drawing number can be numbered according to the original drawing.

Extended data

Specific provisions for drawing as-built drawings:

(1) If drawing paper is emphasized in the construction drawing, correction fluid, scraping with a knife or sinking shall not be used to modify the drawing.

(2) When modifying, words, lines and ink shall be used in accordance with the following provisions.

A, font and size should be consistent with the original picture, it is forbidden to typo, cursive script;

B, all use drawing tools, not drawing by hand;

C, who will negotiate as completion drawings, must conform to the requirements of the architectural drawings, and attached drawings for the appended drawings.