What are the pre-acceptance procedures for project completion?

Acceptance procedures:

1. Application report.

when the project meets the acceptance conditions, the contractor can submit the completion application report to the supervisor.

2. acceptance.

after receiving the application report for completion acceptance submitted by the contractor as required, the supervisor shall review the contents of the application report and handle it according to different situations.

3, unit project acceptance.

according to the contract schedule, when the employer needs to use the completed unit project before the completion of all the projects, or when the contractor proposes that it is approved by the employer, the unit project can be accepted. After the acceptance, the supervisor shall issue the unit project acceptance certificate signed by the employer to the contractor.

4. Operation during construction.

refers to the fact that the contract project has not been completely completed, and the installation of one or more unit projects or engineering equipment has been completed, as agreed in the special contract terms. If it needs to be put into operation during the construction period, it can only be put into operation during the construction period after it has passed the acceptance agreed by the employer and proved to be safe.

5. Trial operation.

6. Clear the site after completion.

Extended information:

Acceptance personnel:

The construction unit is responsible for organizing the completion acceptance team. The leader of the acceptance team shall be the legal representative of the construction unit or the person in charge entrusted by it. The deputy head of the acceptance team shall have at least one engineer and technician.

the members of the acceptance team are composed of the superior competent department of the construction unit, the project leader of the construction unit, the site management personnel of the construction unit and the technical or quality leaders who are not directly related to the project in the survey, design, construction and supervision units.

the acceptance committee or acceptance team is responsible for reviewing all aspects of the project construction, listening to the work reports of relevant units, reviewing the project archives and inspecting the construction project and equipment installation on the spot, and making a comprehensive evaluation on the engineering design, construction and equipment quality.

Reference: Baidu Encyclopedia-Completion Acceptance