Project Supplementary Agreement 1 Issuer: _ _ _ _ _ _ _
Contractor: _ _ _ _ _ _ _
In order to further clarify the responsibilities, rights and obligations of Party A and Party B, on the basis of the Construction Project Contract of Shuanglongyuan Commercial and Residential Building Project in Puding County, Anshun City, according to the Contract Law of People's Republic of China (PRC) and the Construction Law of People's Republic of China (PRC), and in combination with the specific conditions of this project, Party A and Party B sign this supplementary agreement on a voluntary basis.
I. Overview of the Project
1, project name: _ _ _ _ _ _
2. Project address: _ _ _ _ _ _
3. Building area: _ _ _ _ _ _
4. Structure type: bottom frame structure, bottom brick-concrete structure 6+ 1.
5. Design unit: _ _ _ _ _ _
6. Supervision unit: _ _ _ _ _ _
Two. Project content and contract scope
1. The exterior wall brick was replaced by exterior wall paint.
The sliding door of the living room has been cancelled.
3. This project has seven floors and the structure is inclined.
4. Stairs should be polished into cement mortar surface.
5. The 40 × 40 dark gray grid of the external wall is cancelled.
6. The door with window between the kitchen and the balcony (MC-2324) was cancelled, and the balcony was changed into a closed kitchen.
7. The rest shall be constructed according to the original drawing.
Three. Term of the contract (all dates listed in this agreement are calendar days)
1. Commencement and completion dates
1. 1 Commencement date: _ _ _ _ _ _ _ _ _ _; Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Four. mode of payment
This project is contracted according to the construction area, RMB/m2; In the process of construction, if the engineering quantity is increased according to the requirements of Party A, it shall be calculated according to the price negotiated by both parties; This project is the main second-floor advance payment. Party A shall pay Party B 30% of the total contract price after the installation of the second floor precast slab; Party A shall pay15% of the total contract price to Party B after the installation of the main five-story precast slab is completed; Party A shall pay Party B 20% of the total contract price after the seventh floor is completed; After the interior and exterior decoration is completed, Party A shall pay 20% of the total contract price to Party B, and the rest shall be paid within one month after the acceptance.
Verb (abbreviation for verb) The entry into force and termination of a contract and the settlement of disputes.
1. In addition to the normal quality assurance, this contract will be terminated after both parties have completed all the obligations stipulated in this contract.
2. This Supplementary Agreement is made in sextuplicate (including two originals), with each party holding one original and two copies.
3. This supplementary agreement is an immaterial supplement to the Construction Contract of Shuanglongyuan Commercial and Residential Building Project in Puding County, Anshun City. In case of inconsistency, this supplementary agreement shall prevail.
4. Any dispute arising from the performance of this Agreement shall be settled by both parties through negotiation. If no settlement can be reached through negotiation, it shall be submitted to Chengdu Arbitration Commission.
5. This supplementary agreement shall take effect within 5 days from the date of signature by both parties.
Party A: (Seal) Party B: (Seal)
Legal representative:
Tel: Tel:
Fax: Fax:
Bank of deposit: Bank of deposit:
Bank account number Bank account number:
Signature Representative: Signature Representative:
Year, month, sun, moon, sun.
Article 2 of the Supplementary Agreement of Party A for the Project: _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ (hereinafter referred to as Party B)
Party A and Party B, in accordance with People's Republic of China (PRC) Contract Law, Construction Law and other relevant laws and regulations, combined with the specific development situation of Luyimiao Commercial New Village, reached a cost supplementary agreement through consultation to speed up the construction of new countryside.
The supplementary agreement is as follows:
1. For the 50 mu of land developed by Party A, Party A shall be responsible for the completion of the houses under construction, and Party B shall organize the construction of the remaining unfinished houses.
2. Party A is responsible for providing Party B with the construction drawings, and Party B shall carry out the construction according to the drawings provided by Party A and Party A's requirements.
3. Party B will build the remaining houses within the self-built area of 50 mu. After Party B completes each construction stage, it shall pay Party A at the cost price and sell it to the villagers in the village, and the house price shall be paid to Party B within one month after the construction is completed. If it is more than one month, the total house price shall be calculated according to the price of 650 yuan per square meter of construction area, and the interest shall be calculated from the second month after the completion of the house (the interest shall be calculated by one point).
4, housing completion time and standard
5. The construction cost of Party B shall be calculated at 600 yuan per square meter temporarily.
6. No matter whether Party A or Party B sells the house built by Party B in the self-built area, Party A shall issue relevant property rights certificates.
7. Party A shall be responsible for the municipal supporting facilities built by itself in the community.
8. After the community infrastructure is completed, if Party A fails to pay the price to Party B as agreed in the contract, Party B has the right to sell it to the outside world. The price shall be determined by Party B, and the title certificate shall be issued by Party A. ..
9. This Supplementary Agreement is a supplement to the _ _ _ _ _ previously signed by Party A and Party B. In case of any conflict, this Supplementary Agreement shall prevail.
10. If there are any matters not covered in this supplementary agreement, both parties shall settle them through negotiation.
1 1. This supplementary agreement shall come into force as of the date of signature and seal by both parties.
Party A: _ _ _ _ _? Party B: _ _ _ _ _ _
Legal representative: _ _ _ _ _ _ Legal representative: _ _ _ _ _ _
Date of Signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Employer: _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)
Contractor: _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)
Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Because of Article 1 of Finance and Taxation, taxpayers engaged in VAT taxable sales or imported goods, the original tax rates were _ _ _% and _ _ _%, and the tax rates were adjusted to _ _ _% and _ _ _ _% respectively. This document is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
First, the original contract was signed with tax, and the project cost remained unchanged.
2. For the project payment paid before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Three, the original construction contract provides for the issuance of special VAT invoices, and the VAT rate is _ _ _ _%.
4. This agreement shall come into effect after being signed and sealed by both parties. Moreover, this agreement shall become an integral part of the original contract after it comes into effect within _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Verb (abbreviation of verb) If there are any matters not covered, both parties shall negotiate separately.
Party A: _ _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 4 Project Supplementary Agreement Party A (Owner): xx
Party b (contractor): xx
Based on the principles of honesty, trustworthiness, fairness and justice, Party A and Party B have reached the following supplementary agreement through friendly negotiation on the basis of signing the Circular Transportation Building Materials and Industrial Plastic Packaging Project Contract of Gangqiao Industrial Park in xx District:
I. Name and address of the project
This contract project is located in Gangqiao Industrial Park, xx District, and its name is Chongqing xx Building Materials and Industrial Plastic Packaging Project.
Second, the construction period and construction sequence
This project is constructed in two phases, the paint production workshop will be built first, and then the office building will be built according to the actual situation. The total construction period of steel structure is 98 days, starting from the date of 20xx and ending on the date of 20xx.
Three. Payment amount and payment method
This project is carried out in lump sum mode, and the total contract amount is 9.7 million yuan, in words: nine million seven hundred thousand yuan only. (Including paint production workshop 5543. The total price of 72㎡ is RMB 4.3 million, RMB 4.3 million only; Office building 4 158. 08㎡, the total price is 5.4 million yuan, and Wu Bai is four hundred thousand yuan only. )
Payment method of project funds: RMB 6,543,800,000 (in words: one million yuan only) will be paid after the foundation project of paint production workshop is completed, and RMB 6,543,800,000 (in words: one million yuan only) will be paid after the main steel structure is completed; The balance is 2.3 million yuan, which will be paid in one lump sum after leveling. After the foundation project of the office building is completed, RMB 6,543,800,000.00 Yuan (in words: RMB 1,000,000.00 Yuan only), 80% of the total undertaking amount of the office building is paid after the main project of the office building is capped, and the remaining 20% of the office building project amount is paid after the main project is completed (the late payment fee is calculated after the project is completed without the acceptance of relevant departments). If the project payment is overdue, the overdue fine shall be calculated from the due date. The calculation method of the overdue fine is: 2% of the owed project payment every month, and the overdue fine shall be calculated until the payment of the owed project payment is completed.
Four. Other agreements
The construction of paint production workshop does not include water, electricity, doors, aproll and fire fighting; The office building does not include water, electricity, fire protection, floor tiles, doors, windows, aprons, interior wall coatings, exterior wall plastering and thermal insulation.
Verb (abbreviation of verb) liability for breach of contract
Both parties must abide by this contract. If either party breaches the contract, it shall pay the observant party a penalty of RMB 300,000.00 Yuan only.
Intransitive verbs For matters not covered in this contract, both parties shall negotiate separately. This contract has the same legal effect as the main contract. If there is any inconsistency between this contract and the main contract, this contract shall prevail.
Seven. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 5 Supplementary Agreement for Engineering Party A: XXX Development Co., Ltd. Party B: XXX Engineering Co., Ltd.
Based on the principles of equality, voluntariness and mutual benefit, both parties have reached an agreement on the construction of Hongfu Jiayuan Community developed by Party A after repeated consultations, and now sign a construction agreement.
1. Hongfu Jiayuan Community is located opposite the south gate of Wuzhishan Park, covering an area of 3036 1㎡, with a total construction area of1/8959m2 and a total investment of about 16037. 40,000 yuan, all construction projects in the residential area, including line reconstruction, factory pipe network, factory road and residential area construction, are all entrusted to Party B for construction.
Second, according to the different characteristics of construction projects, different settlement methods such as lump sum, budget settlement and actual settlement are adopted for project settlement.
3. Before construction, Party A shall provide accurate above-ground, underground and geological data, and provide all construction drawings and relevant procedures.
Four. During the construction, Party A shall send on-site representatives to solve various problems and external things in the construction in time.
5. In the process of construction, Party B must carry out the construction according to the drawings, abide by various operating procedures and abide by national and local laws and regulations.
6. Party B must ensure that all construction projects are qualified, strengthen management and ensure safe production in the whole construction process.
7. Party B must guarantee the construction period and complete the project on time according to Party A's requirements (except for reasons attributable to Party A and irresistible natural disasters).
Eight, the project settlement should be based on the different characteristics and unit price of subdivisional work (there are items, areas, unit price and amount in the schedule), and the items not listed in the table can be settled separately according to the actual situation. All projects are settled according to the actual construction area.
Nine. Payment of project funds: Party A can pay cash and building materials to Party B according to the actual situation to ensure the payment of project funds.
X. Matters not covered in this Agreement shall be settled by both parties through consultation. This Agreement shall come into force as of the date of signing, and both parties shall abide by it.
Party A: XXX Development Co., Ltd. Representative: _ _ _ _ _ _ _
Party B: XXX Engineering Co., Ltd. Representative: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 6 Supplementary Agreement of Project Party A (full name):
Party B (full name):
Unless otherwise specified, the definitions of all terms in this agreement shall be the same as those in the construction contract of the construction project signed by both parties on (hereinafter referred to as the "original contract").
After Party A completes the construction according to the original contract, it needs to increase the number of projects other than the contract. According to the relevant provisions of the Contract Law of People's Republic of China (PRC) and the Construction Law of People's Republic of China (PRC), combined with the specific conditions of this project, and with the complete willingness and understanding of both parties, Party A signs a supplementary agreement on the construction contract of this project.
1. Due to the increase of engineering quantity, the contract price is RMB (Yuan), and the settlement engineering quantity shall be subject to the actually completed engineering quantity.
2. After this agreement comes into effect, it becomes an integral part of the original contract and has the same legal effect as the original contract. Except for the clauses explicitly modified in this agreement, the rest of the original contract is still fully effective. If there is any conflict between this agreement and the original contract, this agreement shall prevail.
3. This Agreement is made in sextuplicate, four for Party A and two for Party B, all of which have the same legal effect, and shall come into effect as of the date of signature and seal by both parties.
Party A (official seal): _ _ _ _? Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _? Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 7 Supplementary Agreement of Party A for the Project:
Party B:
Through negotiation between both parties, Party A has contracted part of the first-phase factory project (Korean Hyundai Luxury Bus Production Line) developed and constructed in Suqian Economic Development Zone (West Zone) of Jiangsu Province to Party B for construction. Now both parties have reached an understanding on the construction of this construction project, and hereby conclude the terms of this agreement:
I. Overview of the Project:
1. Project name: part of the workshop, site, drainage, factory road, greening and residence in the first phase;
2. Project location: Sucheng Development Zone, Suqian City, Jiangsu Province;
3. Construction scale: Three residential buildings with an area of about 2 1.600㎡. Structure: small high-rise reinforced factory building, single floor, steel structure, reinforced concrete foundation.
Second, the project contracting content and scope:
1, civil engineering, steel structure engineering, hydropower engineering, fire fighting engineering, earthwork excavation, transportation and filling engineering, basement engineering, road network engineering and drainage system engineering.
2. Time limit requirements: the time limit for this project is multiplied by 80% according to the time limit quota as the time limit for a single project.
3. Commencement time: Party B shall enter the site for construction within one week after this contract comes into effect. (Other supporting projects can be constructed in time according to Party A's needs, such as fences, earthwork excavation, transportation and filling, etc. ).
4. The estimated project cost of this project is about 80 million yuan, which is settled according to the actual engineering quantity. The contracting method is: contracting for labor and materials.
Third, the quality requirements:
1. Party B shall carry out the construction according to the relevant national construction codes and regulations, and carry out the construction according to the national engineering quality inspection and evaluation standards. Party B shall not cut corners and complete the construction task with good quality and quantity.
2, the engineering quality of this project should be above qualified. In the process of construction, if the quality of the project does not meet the requirements, Party B shall be responsible for rectification until it is qualified, and all losses caused thereby shall be borne by Party B. ..
Four, safety requirements:
1. During the construction period, Party B shall carry out the construction in accordance with the safety operation regulations of construction projects stipulated by the state to ensure the construction safety.
2. During the construction, Party B shall be responsible for the safety accidents caused by Party B.. ..
Verb (abbreviation of verb) valuation method and charging standard:
1, according to the 2004 Sue "construction and installation engineering unit valuation table" for project settlement.
2. The price of each material should be priced according to the information released by Suqian Cost Station in the same period, and the difference between the price and the quota should be filled in according to the facts.
3. Collect fees and collect taxes according to state regulations.
(1), total project cost settlement:
(1) For the final accounts of housing construction projects, the total cost of the final accounts multiplied by% shall be taken as the final price of the project.
(2) Accessory works and increase or decrease works shall be settled according to the construction quota, and the total project cost shall be multiplied by%.
③ The taxes and fees shall be borne by Party B. ..
(2) Project visa: each working section will issue a project visa, which will serve as the basis for the final accounts of the project.
Contract price of intransitive verbs: subject to the final accounts of this project.
Seven. Payment terms:
1. The project progress payment shall be calculated on a monthly basis. Party B shall submit the workload completed in that month on 25th of each month, and Party A shall complete the examination and approval before 30th of that month. Party A shall pay the project progress payment within five days after the completion of the examination and approval of quantities in the current month, and so on. Party A shall be deemed to have approved the progress payment settlement report submitted by Party B after receiving the progress report of quantities submitted by Party B and measuring it before the 5th of the following month.
2. The project payment shall be paid according to the monthly progress, 85% of the project progress payment shall be paid monthly, 90% of the project progress payment shall be paid after the completion of the project, 95% of the project progress payment shall be paid after the acceptance of the project, and 5% shall be left as the project maintenance fee. The conditions for returning the maintenance fee shall be implemented in accordance with the regulations.
Eight. Party A's responsibilities:
1. On-site project management representative of Party A:
2, solve the construction of water and electricity, moved to the construction site, the cost shall be borne by Party A.. ..
3. In the process of construction, if other people interfere with the procurement of local materials, so that Party B can not carry out normal construction, Party A will come forward to coordinate until normal construction can be carried out.
4. After the contract is signed, Party A must hand over all necessary procedures such as construction drawings (providing eight sets) to Party B within/0/5 days before the start of construction, and handle the construction application formalities in time.
5. Pay the project progress payment in time as agreed.
6, in accordance with the provisions, timely handle the project final accounts.
Nine. Party B's responsibilities:
1. Party B shall carry out the construction according to the drawing design requirements.
2, should complete the project task with good quality and quantity.
3. Pay the living expenses and wages of workers in time.
4. Pay the project deposit of ten thousand yuan.
X effective date and start date of this contract:
1. This contract shall come into effect after being signed and sealed by both parties. Please perform it carefully. Either party shall not violate this contract, and the breaching party shall compensate the other party for its losses.
2. Commencement time: After the signing of this contract, Party A will start the main project for Party B on. (The specific commencement time shall be subject to Party A's commencement notice).
XI。 Other agreements: Matters not covered in this supplementary agreement shall be agreed by both parties separately, and this supplementary agreement has the same legal effect as the construction contract.
12. From the date when both parties sign this contract, Party B shall inject RMB into Party A's account as the project deposit on the same day, and Party A shall return it to Party B in one lump sum within 15 days after the main body of this project is capped. If the project fails to start at the agreed time due to Party A's reasons, Party A shall unconditionally refund the deposit to Party B. ..
Thirteen. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively.
Thirteen. Signing place: Kyushu Modern Vehicle Engineering Headquarters, Suqian Economic Development Zone
Party A (official seal): _ _ _ _? Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _? Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 8 of the Supplementary Agreement of Project Party A (full name):
Party B (full name):
Unless otherwise specified, the definitions of all terms in this agreement are the same as those in the XXXXX contract with the contract number L20 1 1428-8 (hereinafter referred to as the original contract) signed by both parties on XX, XXXXX.
Whereas:
Due to Party A's funds and other reasons. Based on the principle of mutual benefit, Party A and Party B, through friendly negotiation and according to the actual situation, make compensation explanation for some terms of the original contract and reach the following supplementary agreement.
I. The supplementary part of this Agreement is:
Party B's responsibilities:
Party B shall ensure that Party A's XXXX project has the power-on conditions on XX.
Party A's responsibilities:
The total contract price of the first phase of the original contract (2.5 million yuan) is guaranteed to be paid before the project is electrified. The specific payment time and amount are XX yuan per day for XX years, 300,000 yuan per day for XX years, 400,000 yuan per day for XX years and 700,000 yuan per day for XX years.
2. After this agreement comes into effect, it becomes an integral part of the original contract and has the same legal effect as the original contract. If there is any conflict between this agreement and the original contract, this agreement shall prevail. Except for the clauses explicitly modified in this agreement, the rest of the original contract is still fully effective.
3. This agreement is made in duplicate, one for each party, with the same legal effect, and shall come into force as of the date of signature and seal by both parties.
Party A (official seal): _ _ _ _? Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _? Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 9 Supplementary Agreement of Party A for the Project:
Party B:
After Party A and Party B signed the project construction contract on 20 14124, they failed to perform it on time due to financial difficulties. The three parties have reached the following supplementary agreement:
1. The construction plan and construction period in Article 8 of the original contract were changed to * * days from 20 15 years.
2. The payment method in Article 5 of the original contract is changed to: within 2 days after Party B's construction personnel enter the site to start construction, Party A will pay 50,000 yuan in advance for the project, and within 2 days, the main steel frame installation advance payment will be100,000 yuan, and the steel beam and steel frame installation advance payment will be 200,000 yuan. After the project is completed, Party B shall apply for acceptance according to the project completion acceptance standard. After acceptance, 95% of the total project cost will be paid within 10 days, and the remaining 5% will be used as warranty money. After the one-year warranty period, the balance will be paid off (excluding interest). If Party A fails to pay the advance payment or project payment according to the above payment period, it shall pay Party B the liquidated damages for overdue payment at the monthly interest rate of 30.
Three. Due to the increase of engineering quantity, Party A and Party B negotiate that the canopy area around the warehouse is increased by 1.296 square meters (4 meters wide, 324 meters in total) on the basis of the original design, and the cost is increased by 1.47 yuan per square meter, so the cost is increased by one hundred and ninety thousand Wu Bai and twelve yuan only.
Four. Party B borrows RMB (in words) ten thousand Yuan only from Party C, with a term of sixty-five days and a monthly interest rate of. Party B guarantees that the loan will be used exclusively, and agrees that Party C, as the payer, will directly pay the required funds to a third party for the payment of materials and related expenses.
5. Party A voluntarily acts as the loan guarantor of Party B above, and assumes joint and several guarantee responsibilities. Both parties agree that Party A will directly pay part of the project payment due to Party B to Party C to repay the loan and interest borrowed by Party B from Party C. If Party A fails to pay the loan to Party C according to the above agreement, Party A will voluntarily compensate Party C for the completed Ruzhou Shentong Express Warehouse, including the corresponding land use right, which will be owned by Party C. In addition, Party C will use the wide-meter passage for free and assist in the relevant land and real estate change procedures.
In case of conflict between this supplementary clause and the stipulations in the engineering construction contract, this supplementary agreement shall prevail.
Seven. This Supplementary Agreement is made in triplicate, one for each party, and shall come into effect after being signed or sealed by the three parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project Supplementary Agreement 10 Party A: XX Construction and Installation Engineering Company.
Party B: XX Automobile Sales Service Co., Ltd.
The projects of XX Automobile Sales & Service Company 1#, 2#, 3# and brand exhibition hall in XX City shall be undertaken by Party A. During the construction, Party B agrees that Party A will cooperate with Feicheng Ye Sheng Construction and Installation Engineering Co., Ltd. to complete the steel structure project. Now Party A and Party B have reached the following agreement on the quality defects of this project:
1. Now the seventh branch of Shandong Jianwei Engineering Construction Supervision Co., Ltd. has issued a notice from the supervision engineer that the quality defects of this project 1#, 2# and 3# are as follows:
(1) Some wallboard and roof are glued, but some parts do not meet the specification requirements;
(2) The installation of individual parts of doors, windows and parapets does not meet the specification requirements;
(3) All lighting panels are not constructed according to the design drawings and atlas;
(4) The installation of cornice does not meet the specification requirements.
Both parties agree that the above quality defects belong to all quality problems that are not constructed according to the drawings, and do not belong to the quality problems of the foundation project or the main structure, and there are no other quality defects in this project.
2. Both parties negotiate to deduct 260,000 yuan from Party A's project payment as the total compensation for all quality defects of Feicheng Chengrun Automobile Sales & Service Company 1#, 2#, 3# and brand exhibition hall projects, and Party A will no longer undertake any maintenance obligations and compensation responsibilities for this project.
3. Party B shall arrange maintenance on its own according to the specific situation, and shall not claim compensation from Party A for any other reason. Party B shall not claim compensation from Party A for the expansion and loss of quality defects caused by Party B's maintenance delay.
4. If there is any conflict between this agreement and the original construction contract and quality guarantee signed by both parties, this agreement shall prevail.
5. This agreement shall come into force as of the date of signature. This agreement is made in duplicate, one for each party.
Party A: (seal)? Party B: (Seal)
Year, month and day? date month year