Current location - Quotes Website - Signature design - What information does the construction quality acceptance record of the construction unit include?
What information does the construction quality acceptance record of the construction unit include?

What information does the construction quality acceptance record of the construction unit include?

The construction quality acceptance records of the construction unit include:

1. Inspection batch quality inspection form;

2. Inspection batch quality acceptance record form;

3. Concealed project acceptance record form (if it occurs);

4. Construction records (if necessary);

5. Factory certificate of materials/components/devices and on-site re-inspection form;

6. Acceptance conclusions and processing opinions;

7. During the acceptance of the inspection batch, there must be a record of handling unqualified items, and the supervision engineer should sign the acceptance opinion.

What are the quality acceptance materials for curtain wall project construction

Contents

Serial number name

Page number remarks

MQ 1 Curtain wall project construction and technical management Information MQ 1.1 Overview of the curtain wall project MQ 1.2 Notification of winning the bid for the curtain wall project

MQ 1.3 Organizational design, construction plan and approval of the curtain wall construction MQ 1.4 Technical disclosure record

MQ 1.5 Design disclosure record , Drawing joint review record MQ 1.6

Design changes and negotiation records Curtain wall project quality accident handling records

Curtain wall project physical durability guarantee document under normal use Curtain wall construction drawings, structural calculations, design Describe the confirmation file of the architectural design unit on the curtain wall project design MQ 1.7 Curtain wall project visual quality inspection record

MQ 1.8

Curtain wall project quality control information and main function test report checklist

MQ 2 Curtain Wall Project Quality Control Information

MQ 2.1 Material Quality Certificate and Imported Material Inspection Report

MQ 2.1.1

Aluminum Alloy Materials Summary table of product certificates and performance test reports

Aluminum alloy material product certificates and performance test reports

MQ 2.1.2

Curtain wall steel and hardware ( Lining) product certificate and performance test report summary table

Curtain wall steel and hardware (liner) product certificate and performance test report

MQ 2.1.3

Summary table of certificates and performance test reports for curtain wall panels (glass, metal plates, stone)

Summary of certificates and performance test reports for curtain wall panels (glass, metal plates, stone)

MQ 2.1.4 Summary table of certificates of qualification and performance test reports for thermal insulation and fireproof materials

Summary table of certificates and performance test reports of thermal insulation and fireproof materials

MQ 2.1 .5 Summary table of quality certificates and performance test reports for silicone adhesives for curtain walls

Quality certificates or certificates of quality for silicone structural adhesives and sealing materials

wk_ad_begin({pid: 21 });wk_ad_after(21, function(){$('.ad-hidden').hide();}, function(){$('.ad-hidden').show();});

Serial number name

Page number remarks

Commodity inspection certificate of imported silicone structural adhesive

Silicone structural adhesive compatibility and peel adhesion Test report

Shore hardness and standard condition tensile bond strength report of structural adhesive for glass curtain wall

Bond strength and contamination test of silicone structural sealant for stone curtain wall Report MQ 2.2 Inspection report and re-inspection report

On-site pull-out strength test report of rear embedded parts

Curtain wall's wind pressure resistance performance, air penetration performance, rainwater leakage performance and Plane deformation

Performance test report

Indoor granite radioactivity re-inspection report MQ 2.3 Construction and installation quality concealed acceptance record

Temperature and humidity records of the glueing and curing environment; Mixing test record and pull-off test record of two-component silicone structural adhesive (self-prepared form)

Lightning protection device test record (self-prepared form) MQ 2.3.1 Embedded parts or post-installation Embedded parts concealed acceptance record MQ 2.3.2 Component connection node concealed acceptance record

MQ 2.3.3 Curtain wall deformation joints and node structure concealed acceptance record at wall corners MQ 2.3.4 Curtain wall fire protection structure

Concealed acceptance record MQ 2.3.5 Concealed acceptance record of curtain wall lightning protection device

MQ 3 Curtain wall sub-division project quality acceptance data MQ 3.0 Curtain wall sub-division project quality acceptance record

MQ 3.1 Quality acceptance record of sub-projects of glass curtain wall

MQ 3.2 Quality acceptance record of inspection batch of sub-project of exposed frame glass curtain wall MQ 3.3 Quality acceptance record of inspection batch of sub-project of hidden frame and semi-hidden frame glass curtain wall MQ 3.4 Metal Curtain wall sub-project quality acceptance record MQ 3.5 Metal curtain wall sub-project quality acceptance record MQ 3.6 Stone curtain wall sub-project quality acceptance record MQ 3.7 Stone curtain wall sub-project quality acceptance record Unit project quality completion acceptance record is made by the construction unit

Yes, the unit project has passed the completion acceptance, the construction unit prepares the form, and all parties sign the unit project quality acceptance record. The signatures and seals of the five parties including construction, supervision, design, survey and construction. What information does the construction unit need before completion acceptance?

Directory of completion acceptance materials for key projects

1. Completion acceptance contact sheet 2. List of units and personnel of the acceptance team

3. Agenda for the completion acceptance meeting (can be adopted as needed)

4. Completion acceptance plan 5. Self-check list for completion acceptance conditions of key projects

6. Work status report of the construction unit and Reporting materials

7. Work status report and reporting materials of the construction unit

8. Work status report and reporting materials of the supervision unit

9. Work status report of the surveying unit and reporting materials

10. Design unit work status report and reporting materials

11. Survey unit project quality inspection report 12. Design unit project quality inspection report

13. Project quality assessment report of the supervision unit 14. Completion report 15. Project payment certificate

16. Project quality warranty 17. Key project completion acceptance report

18. Signature of the acceptance personnel Original files for completion acceptance

Table G.O.1-1, Table G.O.1-2-1, Table G.O.1-2-2, Table G.O.1-3, Table G.O.1-4

19. Relevant quality testing and functional testing data (photocopies)

Three-dimensional testing report for exterior windows and curtain walls, indoor air quality testing report, soil radon concentration testing report, and elevator acceptance report.

20. Other required documents (photocopies)

Approval letter for project commencement report, construction drawing design file review certificate, fire protection acceptance opinion form, construction planning permit and release inspection line report.

Note: Photocopies are required to be stamped with the official seal of the construction unit, and other originals are required to be stamped with the official seal of each responsible unit.

Information directory

A. Preliminary information

Planning permit

Inspection line report

Construction start permit Certificate

Notice of Winning Bid

Construction Contract

Supervision Contract

Geological Survey Report

Cultural Relics Survey Report

Quality Supervision Letter

Quality Assurance System List (including changes)

Quality Supervision Plan

Drawing review report (including energy saving projects)

B. Quality management information

Construction site quality management inspection records

Construction enterprise qualification certificate

Subcontracting unit qualification review

p>

List of quality assurance system personnel and job certificates

Operation certificates for special operators

Various quality management systems

Measuring instrument certificates and testing Report

C. Unit (sub-unit) project quality control information

1 Drawing review, design changes, and business management records

1-1 Drawing review record

1-2 Design change negotiation

1-3 Technical approval order

2. Engineering positioning measurement and setting-out records

Measurement positioning Records

Measurement review visa

3. Raw material factory certificate and on-site inspection (test) report

According to the material management ledger, witness sampling list, Retest reports and factory certificates are sorted and sorted in order.

Steel cement

Masonry materials

Waterproof materials

Insulation materials

Sand, stone aggregate, Concrete admixtures

Concrete and mortar admixtures

Wall tiles, floor tiles, stone

Paints, coatings, railings and other decorative materials

Doors, windows and profiles, hardware, glass

Welding rods, flux, sleeves, reinforcement glue

Other materials

4. Construction test report and witness inspection Reports

Various geotechnical test reports

Concrete standard curing test blocks

Concrete curing test blocks under the same conditions

Mortar test blocks

p>

Steel welding test pieces

Steel mechanical connection test pieces

Bonding strength test of each layer of exterior wall insulation

Exterior wall decorative panels ( Brick) Bond strength pull-out test

Anchor pull-out test

Post-embedded parts pull-out test

Concrete entity inspection report

Concrete mix ratio

Mortar mix ratio

5. Concealed project acceptance record

Structural concealed project acceptance record

Decoration concealment Project acceptance record

Installation concealed project acceptance record

6. Construction record

Foundation groove inspection record

Construction organization design, construction plan

Technical briefing

Rectification notice and feedback

Concrete slump test record

Concrete weighing record

Temperature measurement record of concrete curing test block

Concrete construction record

Concrete pouring order

Construction diary

Reinforcement bar straight thread connection joint Processing quality inspection records

7. Precast components and ready-mixed concrete certificates

Precast component certificates and on-site sampling retest report

Ready-mixed concrete certificate

8. Foundation, main structure inspection and sampling inspection data

Foundation structure acceptance data, including acceptance contact sheet, structure acceptance report, acceptance plan, supervision quality assessment report, construction quality Situation reports, acceptance inspection records and rectification status.

Main structure acceptance data, including acceptance contact sheet, structural acceptance report, acceptance plan, supervision quality assessment report, construction quality report, acceptance inspection records and rectification status.

9. Special acceptance data for building energy conservation

Including acceptance contact sheet (including personnel list), energy conservation acceptance plan, construction unit energy conservation construction quality report, energy conservation project quality assessment report, building Energy-saving project construction quality acceptance report. Exterior wall energy-saving structure drill core inspection report.

10. Quality acceptance records of sub-items and sub-projects

Foundation and foundation sub-sections and sub-items, inspection batches

Main structure sub-sections and sub-items , Inspection batch

Building decoration divisions and sub-items, inspection batch

Building roofing divisions and sub-items, inspection batch

Building water supply, drainage and heating Divisions and sub-items, inspection batches

Building electrical divisions, sub-items, and inspection batches

Smart building divisions, sub-items, and inspection batches

Ventilation Air-conditioning divisions, sub-items, and inspection batches

Elevator divisions, sub-items, and inspection batches

Building energy-saving divisions, sub-items, and inspection batches

11. Pile foundation data

12. Grid data

13. Curtain wall data

14. Prestressed structure data

15. Cable and membrane structure data

16. Project quality accidents and accident investigation and handling data

17. New materials and new technology construction records

18. Household division of residential projects Acceptance data

D. Unit (sub-unit) project safety and functional inspection data verification and main function spot inspection records

1. Roof water spray test records

2 , Basement waterproofing effect inspection records

3. Ground water storage test records with waterproofing requirements

4. Building verticality, elevation, and full height measurement records

5. Inspection records of air extraction (air) ducts

6. Air tightness, water tightness and wind pressure resistance test reports of curtain walls and exterior windows

7. Building settlement observation and measurement records

8. Energy saving and thermal insulation test records

9. Indoor environment test report

10. Soil radon concentration test report

E. Supervision information

1. Quality supervision letter

2. Quality assurance system and personnel change files

3. Construction drawing review report

4. Quality supervision plan

5. Project supervision and inspection records, rectification notices and feedback

6. Infrastructure acceptance data: contact sheet, structural acceptance report, quality assessment report

7. Main structure acceptance data: contact sheet, structure acceptance report, quality assessment report

8. Construction energy conservation division project quality acceptance report

9. Residential project quality Summary table of household acceptance results

10. Unit project completion acceptance information

1. Completion acceptance contact sheet

2. List of units and personnel of the acceptance team

3. Completion acceptance plan

4. Self-check list for completion acceptance conditions of key projects

5. Work status reports and reporting materials of each participating unit

6. Project quality assessment report of the supervision unit

7. Completion report

8. Proof of project payment

9. Project quality warranty

10. Completion acceptance report of key projects

11. Original completion acceptance file signed by the acceptance personnel

Table G.O.1-1, G.O.1-2-1, G.O.1-2-2, G.O.1-2-3

12. Relevant quality inspection and functional inspection data (photocopy, stamped with the official seal of the construction unit)

Exterior windows and Curtain wall three-property test report, indoor air quality test report, soil radon concentration test report, elevator acceptance report

13. Other required documents (photocopies, stamped with the official seal of the construction unit)

Project start report, construction drawing design file review certificate, fire protection acceptance opinion form, construction planning permit and inspection line report

14. Sign-in form for acceptance personnel (can be merged with Table 2)

11. Supervision report

12. Quality accidents and sand pile foundation engineering inspection batch construction quality acceptance records

I have contacted me and I will send you what quality control measures the construction unit should take to ensure construction quality

Implement a three-inspection system. After the team completes a process, it will first conduct a self-inspection, and then the construction unit will accept it. , and finally the construction unit will notify Party A and the supervision unit to pass the inspection before entering the next construction process. What regulations should be met for unit project construction quality acceptance?

Each part of the project will have an acceptance standard. For example, the basement project has an underground engineering acceptance standard. Roofing projects will have roofing project acceptance criteria. What information does the construction unit need to prepare for the completion acceptance of the factory~?

The construction unit should prepare:

1. As-built drawings

2. Material qualification certificates (steel bars, cement, bricks, etc.) are provided by material suppliers.

3. Material inspection certificates (steel bars, concrete, etc.) are provided by the quality inspection station of the local construction department. The premise is that you provide materials for inspection.

4. The supervisor issues a project qualification certificate and agrees to acceptance.

5. Pile foundation inspection certificate. (The quality inspection station will tell you who to contact for inspection. It is usually a third-party company, but it is easy to get through if you pay the money)

6. Self-check information. During the construction process, every construction procedure must be self-inspected and then signed off by the supervisor.

7. The design unit issues a certificate showing that you constructed according to the design and did not change the design intention. If there is a change and it is approved by the design unit, the design unit must be required to issue a change notice.

I don’t know if I have given points. I have said so much and I hope it will be helpful to you. Other information depends on the specific local conditions. Anyway, we need this information here.

Completion drawings

Photocopy of the construction unit's business license

Photocopy of the company's legal person ID card

Fire inspection report Electrical inspection report

p>

Material sampling inspection qualification report

Design approval certificate file

Fire protection acceptance refers to the fire protection department’s investigation of the qualification of fire protection inspection of enterprises and institutions when they are completed and put into operation. Construction When the unit conducts fire inspection and acceptance, the fire bureau needs to conduct safety inspection and inspection. At the same time, it needs to issue electrical fire inspection qualification certificate files. Electrical fire protection inspection has been included in the mandatory inspection project of fire inspection and acceptance by the Ministry of Public Security. Does the person in charge of the construction unit need to sign the documents and quality acceptance records and inspection batches produced by the construction unit?

The inspection approval does not require the signature of the person in charge of the construction unit, not even the chief supervisory engineer. It only requires the signature of the professional supervisor or the professional person in charge of the construction unit.