Current location - Quotes Website - Signature design - Model maintenance contract
Model maintenance contract
With the continuous improvement of laws and regulations, people pay more and more attention to contracts, and the uses of contracts are becoming more and more extensive. Signing a contract can protect our legitimate rights and interests according to law. So what are the common contracts? The following is a sample of maintenance contracts (5 selected ones) that I have compiled for you, hoping to help you.

Model Maintenance Contract 1 Party A: Party B:

In accordance with the Economic Contract Law of the People's Republic of China and the relevant regulations of the Ministry of Construction and the provincial and municipal construction committees on decoration engineering, this contract is hereby signed by both parties through consultation:

I. Projects

1, project name:

2. Project location: People's Hospital of Inner Mongolia Autonomous Region

3. Project contracting method: contracting for work and materials.

Second, the engineering decoration content

1、_______

2、_______

Third, the project cost

The project cost is based on the use requirements and design requirements of Party A;

The project cost is RMB _ _ _ _ _ _.

Fourth, the project cycle

Project commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project Completion Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Verb (abbreviation of verb) quality requirements

According to the industry standard JGJ 73-9 1 Code for Acceptance of Building Decoration Engineering of the Ministry of Construction and the standards stipulated by provincial and municipal construction committees and fire departments, the project quality has reached the top level. If there are any quality problems after the completion of the project (except those caused by human factors, which will be used by Party A after the completion), Party B shall guarantee them free of charge for one year and maintain them for life.

Terms of payment for intransitive verbs

1, after signing the contract.

2. In the middle of the project progress, Party A shall pay the total project cost to Party B..

3. After the project is completed and accepted, Party A shall pay all the project funds to Party B..

Seven. Responsibility of both parties

1. Party A is responsible for providing the use and design requirements of the whole project; Provide the location of water and electricity on site; Provide material transportation channels, necessary material storage sites and design drawings of original buildings; Responsible for indicating the location of power distribution system, piping system and water supply and drainage master valve involved in the decoration project; The construction site should be flat.

2. Party B: Provide Party A with engineering decoration construction design drawings and engineering quotation.

Eight. any other business

Party A and Party B agree to reach the following agreement:

1. If the construction cannot be carried out due to special circumstances or force majeure, the construction period can be postponed; All losses caused by breach of contract shall be borne by the breaching party.

2. When the materials and processes of the project or project other than the quotation of this project are released and changed, the comprehensive unit price shall be confirmed by Party A, signed by the on-site person in charge of Party A in the form of "on-site visa" and included in the completion settlement supplement. (If there is any change in the project or project materials and technology other than the quotation of this project, Party A will recognize it, but the expenses incurred will be equally valid without a visa from Party A.. )

3. If Party A or Party B breaches the contract and fails to implement the contract, they may appeal to the superior competent department or arbitration institution.

4. Other matters not covered shall be settled by both parties through negotiation.

5. This contract is made in duplicate, which shall come into effect after being signed by both parties, and each party holds one copy, with the same legal effect.

Name of Party A's unit:

(official seal)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Name of Party B's unit:

(official seal) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model Maintenance Contract 2 Party A:

Party B:

1. Party A agrees to entrust Party B to repair Room 4 on the fourth floor of the second dormitory of Shashi Town 1 unit, with a construction area of 1 17 m2.

2. The maintenance time is _ _ _ _ _ _ _ during the National Day holiday in June, 10, (June 1-7).

3. Maintenance requirements: All indoor walls shall be painted smooth and bright. Install wooden floor 1 m2/165 yuan. Install kitchen utensils. Install the lights. The roof has been completely replaced with a foot-long tile. After the maintenance is completed, Party B shall be responsible for the relocation, arrangement and sanitation of all kinds of furniture.

The total maintenance cost is 65,000 yuan, which will be paid in three phases. Pay 22 thousand for the first time. That is, the wall painting meets the quality requirements put forward by Party A after completion. Pay 2 1000 yuan for the second time. The floor of the room meets the quality requirements after installation. Pay 22 thousand for the third time. After all the completion, including all the relocation and installation of furniture, the sanitary condition is good.

5. Quality acceptance is divided into three stages. If any nonconformity is found, Party A requests to resume work. If the site cannot be restored, Party A has the right to deduct the corresponding expenses from the maintenance fee.

6. If Party A reneges after signing the contract and chooses someone else to repair it, it is Party A's breach of contract .. Party A pays Party B RMB 1000. After the signing of this contract, if Party B violates the regular maintenance or does not undertake maintenance (due to the heavy workload of contracting other projects), which affects Party A's normal work and life, it is a breach of contract by Party B, and Party B shall pay Party A a penalty of 65,438+0,000 yuan. ..

7. This contract shall come into effect after being signed by both parties through consultation. This contract is made in triplicate, one for each party and one for guarantor Wang Fusheng.

Signature of Party A: _ _ _ _ _ _ _

Signature of Party B: _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model Maintenance Contract 3 Employer: _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), Regulations on Quality Management of Construction Projects and other relevant laws and regulations, following the principles of equality, voluntariness, fairness, honesty and credit, and in combination with the specific conditions of this project, Party A and Party B sign this contract through consultation. Details are as follows:

I. Project Location and Content

1, project location:

2. Project content:

(1) Demolition, derusting, anticorrosion and roof panel installation of damaged (burned) parts in Workshop 1. Note: the area of workshop 1 is 1 1000㎡.

(2) Demolition, anti-corrosion and wallboard installation of bad and rotten parts of the wall.

(3) Manufacture and installation of nylon screen window.

Second, the project cost

(1) The damaged part of the first workshop and the burned part of the wall.

(1) Demolition of rotten colored steel tile _ _ _ _ Yuan /M2.

(2) Derusting of steel structure for maintenance (calculated according to the "area" of color steel tile) _ _ _ _ _ _ Yuan /M2 (including scaffolding, if this part is not replaced for anticorrosion, this unit price shall apply).

(3) anticorrosion (calculated by tile area) _ _ _ _ yuan /M2 (including scaffolding). If anti-corrosion is not replaced, it shall be implemented at this unit price.

④ Newly made safety purlins (C 120 or140) _ _ _ yuan or _ _ _ _ yuan/meter.

(5) The top color steel tile of the roof (type 90, with a thickness of 0.65MM, made of Baosteel board or honest board) is _ _ _ _ _ yuan /M2 (unit price).

⑥ Internal UV. PVC anticorrosive board (thickness: mm)_ _ _ _ _ Yuan /M2 (single layer price).

⑦ Hardware fittings for roof panels and wallboard (calculated by tile area) _ _ _ _ _ Yuan /M2.

(2) Nylon screen window (40 mesh) _ _ yuan /M2 (including labor costs).

The above quantities shall be settled by the paid-in party.

Three. Payment terms:

1. The total project cost is RMB _ _ _ _ (in words:). After the above-mentioned project is completed and accepted, Party A shall pay% of the total contract price to Party B within 3 days, that is, RMB Yuan only (in words), and the rest shall be paid in full before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Party B shall be responsible for submitting the completion data to Party A. If Party A requires to issue a Jian 'an invoice, it shall be calculated as 5% of the total cost, and Party A shall be responsible for organizing the acceptance.

Fourth, the construction period:

Enter the site for construction according to Party A's requirements, but Party A must have the construction conditions. The construction period is working days. In case of rain or force majeure, the construction period will be postponed.

Verb (abbreviation of verb) quality standard

The project shall be accepted according to Party A's requirements. ..

Sixth, the quality warranty period

One year. If there is any quality problem during the warranty period, it shall be handled within 24 hours after receiving the notice from Party A..

Seven. Rights and obligations of both parties

1. Party A is responsible for protecting the plane equipment on the construction site to meet the construction conditions such as maintenance, and sending professionals to the site to supervise and provide Party B with water and electricity for the project free of charge.

2. Party B's site management personnel and construction personnel shall be responsible for their own accommodation.

3. Party B is responsible for the maintenance according to the quantity confirmed by both parties to ensure the one-time acceptance.

Eight, safety responsibility

1. Party B shall organize its own personnel to carry out on-site construction, and Party B shall be responsible for the safety of commuters and the safety of on-site work.

2. Party B must ensure safety and quality; In case of any safety accident, Party B must bear all the expenses, and Party A will not bear any responsibility.

Nine. responsibility for breach of contract

After the contract comes into effect, both parties shall perform their respective rights and responsibilities according to the contents of the contract. In case of breach of contract, the breaching party shall bear all the responsibilities.

X. Other agreements

1. If there are other unfinished matters or agreements, Party A and Party B may supplement them in writing, and the supplementary contract or agreement has the same legal effect as this contract. In case of dispute, either party may bring a lawsuit to the local people's court.

2. This contract shall come into effect immediately after being signed and sealed by both parties, and shall be automatically terminated after performance.

3. This contract is in duplicate, with Party A and Party B holding one copy respectively. ..

Party A:

Party B:

Date:

Model Maintenance Contract 4 Party A:

Party B:

Based on the principle of equality and mutual benefit, Party A and Party B sign this contract through friendly negotiation and abide by it jointly.

Article 1 Motor maintenance amount: eleven thousand six hundred and twenty Yuan only (1 1620 yuan) (see the list for details).

Article 2 Quality

1. Quality standard of motor after repair

1. 1 The effective turns of the motor are equal, and the three-phase error detected by the double-arm bridge is not more than 2%.

1.2 winding has good insulation and is wound according to the original insulation grade of the motor.

1.3 manufacturing technology and materials shall be manufactured according to industry standards.

1.4 The repaired motor must have specified winding marks.

1.5 after the repair, the motor must issue an experimental report and a motor no-load report, with detailed trial run records marked and signed for confirmation.

1.6 The repaired motor shall be guaranteed to be free from damage for at least one year (except for non-quality reasons).

2. Rights and obligations of both parties

2. 1 Strictly abide by Party A's assessment methods for motor maintenance, carry out construction or maintenance in Party A, and accept Party A's safety management.

2.2 Strictly implement the motor maintenance agreement and relevant standards, and accept the quality inspection of Party A before and after maintenance.

2.3 Party B promises to accept Party A's maintenance task at any time within 12 hours, and complete it according to the time specified by Party A, and shall not shirk it for any reason.

2.4 If the motor is damaged due to Party B's maintenance quality, Party B shall be responsible for free maintenance.

Article 3 Contract Price and Settlement Method

1. Motor maintenance includes: winding wires and related materials, labor costs, motor leads, terminals, nose and internal rust prevention matching with the motor.

Motors below 2.4kw 100 Yuan per set. 28 yuan /KW for motors above 4kw. The total number of motors with more than 6 poles is increased by 1.2 times. After the maintenance project is confirmed, Party B will collect the motor to be repaired from Party A's company and finish it within the specified time. After maintenance, Party B shall be responsible for sending it to Party A's company. Party A shall pay 90% of the maintenance fee to Party B every quarter, and the remaining 65,438+00% shall be paid within one month without quality problems.

Article 4 Liability for breach of contract:

Party B must abide by Party A's discipline and safety management during the construction. If there are other matters, both parties shall settle them through consultation. If negotiation fails, a lawsuit may be brought to the people's court.

Article 5 This contract is made in quadruplicate, three for Party A and one for Party B, and shall come into effect after being signed and sealed by both parties.

Party A: Party B:

Legal representative:

Authorized Agent: Authorized Agent:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Model Maintenance Contract 5 Party A: Party B:

Based on the principle of mutual benefit and joint responsibility, Party A and Party B have reached the following agreement through careful consultation for mutual compliance:

I. Items entrusted by Party A to Party B for maintenance:

2. Total project amount: subject to calculation).

Third, the payment procedure:

Class A —— After the contract comes into effect, Party A will pay Party B the second payment in advance after the progress of the project is over half, and the balance will be settled after the completion and acceptance of the project (5% of the total project price will be reserved as the project quality deposit, which will be paid after half a year).

Class B-general projects are paid after construction, and this project is paid according to the method.

Four. Party A and Party B negotiate the construction time: _ _ _ _ _ _.

Verb (abbreviation of verb) In order to implement the maintenance project safely and smoothly, Party A shall assist Party B:

1. Provide necessary water, electricity and other facilities and other conveniences.

2. Provide a safe place to store tools and building materials.

For the sake of Party A's operation and interests, Party B shall:

1. Enter and leave the construction area according to Party A's safety system.

2. The operation schedule does not affect the normal business of Party A. ..

7. Acceptance criteria and methods: determined by referring to the building construction acceptance specifications.

Eight, after the acceptance of the project, Party A shall unconditionally pay the maintenance project price in full.

Nine. Liability for breach of contract:

1. During the validity of the contract, neither party may terminate the contract without the consent of the other party.

2. liquidated damages: either party must compensate the other party for the economic losses caused by the breach of contract.

X matters not covered in this contract shall be supplemented by both parties through consultation.

XI。 This contract is made in duplicate, one for each party, which shall come into effect after being signed and sealed, and shall be kept on file for future reference.

Party A's unit: Party B's unit:

Representative of Party A: Representative of Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _