Current location - Quotes Website - Signature design - What does the test report contain?
What does the test report contain?
what does the test report include

applicant's name, sample name and model, test items, test conditions, test results, adopted standards, report description, etc. There are many types of tests, not all of which are in one format.

how to write a good test report

brief introduction of the project: some contents that need to be introduced, the explanation of the project abbreviation, the project background and so on. Test content: the outline of the test content. Test environment: Description of the test environment, including client and network environment. Test resources: the use of test resources during testing. Test data: number of bugs, number of solutions, number of legacy. Module bug distribution, bug trend chart, defects left over, problems that need to be explained. Test data analysis: an analysis of the whole process test, and draw a conclusion. Legacy issues: The legacy issues of the software are explained in detail. Everyone can explain the contents of the report clearly, but simply listing it can also make it difficult for the readers. How to show these things to make your test report full and convincing, and easy to read and see? 1, the content is concise: speak to the point, don't talk nonsense, simple and easy to understand, can use the table to show as much as possible. 2. Don't list detailed data, but pick some data that can explain the problem analysis: such as defect trend chart, bug distribution of modules, etc. Add the necessary brief analysis. The graphics are easy to understand and intuitive. If you can't explain the problem or some unimportant charts, you don't have to list them all in the report, which will make the report more verbose. 3. Explanation of the left-over problems is very important: List of left-over problems: When there are many left-over problems, we should choose the best one, because everyone feels this way. For 1 questions, everyone will look at them carefully, and for 1 questions, they will have no mood and time to look at them carefully, and they will feel that the key points are not prominent, which requires testers to pick out the more important problems and show them, and explain the impact of the important problems. 4, the analysis conclusion must be given, and the obvious position. Let the project manager know what your test conclusion is, and when time is tight, he will know the conclusion in his heart. 5. Attach other detailed data for those who want to learn detailed data to learn and understand.

what's the difference between a test report and an inspection report? 5 points

Test report generally refers to a third-party test without specific standards or based on (or component analysis), such as the test conducted by composite instruments and meters, and the test report issued at the time of reporting (the report is not marked as qualified or unqualified).

inspection report refers to a kind of inspection (such as a single performance test) with specific basis. The content is accompanied by qualified and unqualified marks.

I hope it helps you.

what should be included in the test report after the system integration test stage

test background, software environment, hardware environment, test process, expected results, actual results and test conclusions

what should be included in the software test analysis report

Generally, there are three final artifacts: test plan, test case and test result report.

The plan includes the Beijing, personnel and contents of the test, as well as the planned test.

test cases are generated for the test contents and test items to be done in the plan. The test result report contains the results and summary of the use case test for future maintenance.

All three should be constantly updated during the whole testing process, and there is only one final version.

What should the software test analysis report include

Test analysis report

1 Introduction

1.1 Purpose of writing

Explain the specific purpose of writing this test analysis report and point out the expected reading range.

1.2 background

description:

a. name of the software system to be tested;

B. The task proposer, developer and user of the software and the computing center where the software is installed point out the possible differences between the test environment and the actual running environment and the influence of these differences on the test results.

1.3 definitions

list the definitions of specialized terms used in this document and the original phrases of foreign initials.

1.4 reference materials

list the reference materials to be used, such as:

a. the approved plan task book or contract of this project and the approval from the higher authorities;

B. Other published documents belonging to this project;

C. documents and materials cited in various places in this document, including the software development standards to be used. List the titles, document numbers, publication dates and publishing units of these documents, and explain the sources of these documents.

2 test summary

List the identifier of each test and its test contents in tabular form, and point out the difference between the actual test contents and the pre-designed contents in the test plan, and explain the reasons for this change.

3 test results and findings

3.1 test 1 (identifier)

Compare the actual results of dynamic output (including internally generated data output) in this test with the requirements for dynamic output, and state the findings.

3.2 test 2 (identifier)

the test results and findings of item 2 and subsequent tests are given in a way similar to article 3.1 of this report.

4 conclusion on software function

4.1 function 1 (identifier)

4.1.1 capability

Briefly describe this function, and explain the software capability designed to meet this function and the capability that has been proved by one or more tests.

4.1.2 restrictions

explain the range of test data values (including dynamic data and static data), and list the defects and limitations found in the software during the test for this function.

4.2 function 2 (identifier)

The test conclusion of item 2 and subsequent functions is given in a way similar to 4.l of this report.

......

5 Analysis Summary

5.1 Capability

State the capability of this software that has been tested and confirmed. If the test is conducted to verify the realization of one or several specific performance requirements, the comparison between the test results and requirements in this respect should be provided, and the influence of possible differences between the test environment and the actual operating environment on the ability test should be determined.

5.2 defects and limitations

state the software defects and limitations confirmed by tests, explain the impact of each defect and limitation on software performance, and explain the cumulative impact and total impact of all measured performance defects.

5.3 Suggestions

Put forward improvement suggestions for each defect, such as:

a. Modification methods that can be adopted for each modification;

B. the urgency of each modification;

C. the estimated workload of each modification;

D. the person in charge of each modification.

5.4 evaluation

explain whether the development of the software has reached the predetermined goal and whether it can be delivered for use.

6 test resource consumption

Summarize the resource consumption data of the test work, such as the number of staff's level, machine time consumption, etc.

what do modern software testing activities include?

Test Top Process:

1 Digest software requirements to obtain test requirements

2 Determine the test direction

3 Steps of designing test cases to find bugs

4 Build a test environment with professional software

5 Find bugs according to test cases

6 Issue a test report

7 Determine whether the software quality has passed

7252497 This group mainly discusses and discusses with technology.

what documents does a complete software test report contain?

in general, there are three final artifacts: test plan, test case and test result report.

The plan includes the Beijing, personnel and contents of the test, as well as the planned test. Test cases are generated for the test contents and test items to be done in the plan.

the test result report contains the results and summary of the use case test for future maintenance.

All three should be constantly updated during the whole testing process, and there is only one final version.

What does the building structure test report include

1 Name of the entrusting unit; 2. General situation of construction project, including project name, structure type, scale, construction date and present situation, etc. 3 Name of design unit, construction unit and supervision unit; 4. The reason and purpose of detection, and an overview of previous detection; 5 test items, test methods and standards; 6 sampling plan and quantity; 7 detection date, report completion date; 8 main classification test data and summary results of test items; Test results and conclusions; 9 Signature of chief inspector, auditor and approver.

What are the main contents of the test report

The format of the text of the software test report is as follows:

1 Introduction

This chapter should be divided into the following articles.

1.1 identification

this article shall contain the complete identification of the system and software to which this document applies, including identification number, title, acronym, version number and release number (if applicable).

1.2 system overview

this article should briefly describe the purpose of the system and software to which this document applies. It should describe the general properties of the system and software; Summarize the history of system development, operation and maintenance; Identify the investors, demanders, users, developers and supporting institutions of the project; Identify current and planned operation sites; And list other relevant documents.

1.3 document overview

this article should summarize the purpose and content of this document, and describe the confidentiality and privacy requirements related to its use.

2 reference files

this chapter should list the numbers, titles, revisions and dates of all documents referenced in this document. This chapter should also identify the sources of all documents that cannot be obtained through normal supply channels.

3 Overview of test results

This chapter should be divided into the following sections to provide an overview of test results.

3.1 Overall evaluation of the tested software

This article should:

a. Provide the overall evaluation of the software according to the test results shown in this report;

B. identify any remaining defects, limitations or constraints detected in the test. Defect information can be provided by problem/change report;

C. For each remaining defect, limitation or constraint, it shall be described as follows:

1) Impact on software and system performance, including identification of unsatisfied requirements;

2) the impact on software and system design in order to correct it;

3) recommended correction scheme/method.

3.2 Impact of test environment

This article should evaluate the difference between test environment and operating environment, and analyze the influence of this difference on test results.

3.3 improvement suggestions

this article should provide improvement suggestions for the design, operation or testing of the software under test. Each suggestion and its impact on the software should be discussed. If there are no suggestions for improvement, this article should be stated as "None". .

4 Detailed test results

This chapter should be divided into the following sections to provide detailed results of each test.

note: the word "test" refers to a set of related test cases.

4.x (unique-identifier of the tested item)

This article should identify a test by the unique identifier of the item, and describe the test results in the following articles.

4.x.1 summary of test results

this article should summarize the test results. As far as possible, the completion status of each test case associated with the test should be given in tabular form (for example, "all results are as expected", "problems encountered", "deviations from requirements", etc.). When the completion status is not "expected", this article should quote the following items to provide detailed information.

4.x.2 encountered problems

this article should identify each test case that encountered one or more problems.

4.x.2.y (project unique identifier of test case)

This article applies the project unique identifier to identify the test case that encounters one or more problems, and provides the following contents:

a. Brief description of the problems encountered;

B. identification of test process steps of problems encountered;

C. (if applicable) references to relevant problem/change reports and backup data;

D. The number of repeated processes or steps to try to correct these problems, and the results obtained each time;

e. when retesting, from which fallback points or test steps did the test resume?

deviation of 4.x.3 from the test case/process

this article shall identify each test case that deviates from the test case/process.

4.x.3.y (project unique identifier of test case)

This article applies the project unique identifier to identify the test case with one or more deviations, and provides:

a. Description of deviation (for example, the operation of the test case with deviation and the nature of deviation, such as replacement of required equipment, failure to follow specified steps, deviation of schedule, etc.). (Red lines can be used to indicate the deviated test process);

B. reasons for deviation;

C. Deviation pair test ... > >