How to fill in the equipment acceptance conclusion
Steps to fill in the equipment acceptance conclusion:

1, main building materials;

2. Building components;

3. The equipment inspection report includes manufacturing supervision and sampling data;

4. Building Safety Day;

5. Inspector's signature, name, professional title and work unit position;

6, the project completion acceptance conclusion, completion acceptance.

The acceptance contents of equipment and equipment after they arrive at the site mainly include:

1, acceptance basis, according to the acceptance requirements in your equipment bidding or procurement documents, carry out acceptance;

2. The acceptance content usually refers to the items specified in the contract and packing list, such as whether the outer packaging of the equipment is in good condition, whether it is damaged, if it is damaged, the position and extent of the damage, whether the appearance of the equipment itself is in good condition, and whether the equipment itself is free of scratches, collisions, deformation, stains and corrosion. After unpacking;

3, according to the contract and packing list, check whether the goods are complete and consistent, equipment name, model, quantity, etc. , if not, you must explain the type and quantity of missing.

Acceptance report format:

1, building foundation;

2. General situation of the project, preliminary work and implementation of the project, design, construction, general contracting, construction supervision, equipment suppliers, quality supervision institutions and other units, the commencement and completion dates of each single project, the completed workload and the formed production capacity, detailing the reasons for the advance or delay of the construction period and the reasons for the deviation of production capacity from the original plan, as well as the countermeasures taken to ensure the implementation of the original plan during construction;

3. Initial inspection and trial operation;

4. Overview of final accounts;

5. Arrangement of engineering and technical files.

"Provisions on Equipment Management of Industrial Transportation Enterprises Owned by the Whole People" Article 15 For imported equipment purchased by enterprises, technical information on equipment maintenance and necessary maintenance accessories shall be provided.

After the imported equipment arrives, the enterprise should carefully check and accept it, install, debug and put it into use in time, and claim for compensation within the claim period when problems are found.

Twenty-sixth enterprises should go through the formalities of increasing the value of fixed assets after the equipment renovation and acceptance.

Twenty-ninth enterprises should establish and improve the equipment acceptance, handover, archives, management and assessment system.

Twelfth enterprises must do a good job in the management of equipment planning, selection, purchase (or design, manufacture), installation and debugging. Enterprises purchasing important production equipment shall conduct technical and economic demonstration and submit for approval in accordance with relevant regulations. When an enterprise purchases equipment, the equipment management organization or equipment management personnel of the enterprise shall put forward requirements for the reliability and maintainability of the equipment.