1.
Clarify the handling scope, application content, examination and approval procedures, guardian's responsibilities and related requirements of the safety construction operation ticket, so as to ensure the correctness, feasibility and guidance of the safety construction operation ticket in the construction and ensure the safety construction.
2. Scope of application
It is applicable to the management of safe construction work tickets within the company.
3. Responsibility
3. 1 Project technicians are responsible for filling in the working ticket for safe construction.
3.2 The technical management, safety supervision and other departments of the project department are responsible for the audit of safety construction working tickets.
3.3 The chief engineer of the project department is responsible for the examination and approval of the working ticket for safe construction.
3.4 The Project Safety Supervision Department is responsible for supervising the implementation of safety construction operation tickets.
3.5 For major construction projects, the chief engineer of the project and the head of the construction technology and safety supervision department shall supervise and guide the construction on the spot.
4. Work content and requirements
4. 1 According to the safety construction measures that have been compiled and approved, under the following circumstances, a safety construction operation ticket must be handled before construction:
4. 1.65438+
4. 1.2 Lifting operation of two or more cranes.
4. 1.3 The crane works under and near the high-voltage line.
4. 1.4 disassembly and assembly of large-scale lifting machinery (lifting capacity over 30t).
4. 1.5 Trial hoisting operation of hoisting machinery.
4. 1.6 Loading, unloading and transportation of overloaded, ultra-wide, ultra-high and ultra-long objects and important precision and valuable equipment (such as main transformer, generator stator, condenser, steam drum and deaerator water tank).
4. 1.7 Lifting dangerous goods.
4. 1.8 transformer hanging cover, hanging core and generator pass through the rotor.
4. 1.9 Erection and dismantling of special high scaffolding and large scaffolding.
4. 1. 10 Installation and disassembly of metal lifting tower and construction elevator.
4. 1. 1 1 Work in inflammable and explosive areas (such as oxygen station, acetylene station, oil depot, oil region, pulverized coal bunker, hydrogen production station, etc. ).
4. 1. 12 Earthwork blasting and ground wire blasting.
4. 1. 13 High voltage live working and near high voltage live working.
4. 1. 14 open caissons, caissons, metal containers and closed pipes for water operation, electric welding, anticorrosion and contact with toxic, inflammable and explosive articles.
4. 1. 15 Hydrostatic test and pickling of boilers and other pressure vessels, operation of acid making, hydrogen making and oxygen making equipment in battery room.
4. 1. 16 asbestos tile roofing operation.
4. 1. 17 works in the power generation and power reception areas.
4. 1. 18 platform pressure test, derrick crane test, external platform installation, operation platform and derrick removal of chimney project.
4. 1. 19 Other dangerous operations.