Fence Construction Contract 1
Contractor: Guanshuige Complete Primary School (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
p>
According to the relevant provisions of the "Contract Law of the People's Republic of China", after negotiation between Party A and Party B, Party A entrusts the construction of small sections of walls to the south and east of the school to Party B, taking into account the specific conditions of this project. By entering into this contract, we hereby abide by the following:
1. Project Overview
1. Project Name: School Fence;
2. Project Location: To the south and east of Guanshuige Complete Primary School.
2. Contract content and materials
1. Project content: Build a fence about 60 meters long (cement mixture foundation is 0.3 meters thick, 0.4 meters wide, 2.4 meters high, every 4 meters One vertical column, with a maximum height of 0.1 meters made of sand and dust inserted into the glass).
2. Material selection: cement, gravel, lime sand, bricks;
3. Contracting form: spot work without materials (basic part of the work: 80 yuan per day, not included) Eat; labor for demolishing the wall will be discussed separately).
3. Construction Period
After negotiation between both parties, the start and completion date of this project are as follows:
1. Start date: October 15, 2011;
2. Completion date: December 30, 2011;
3. Since the complex building is under construction and construction is not possible, the date can be relaxed, but it will end before the winter vacation.
IV. Quality and safety requirements
During the construction process, Party B must obey the unified command and dispatch of engineering and technical personnel, organize the construction in a scientific, reasonable and orderly manner, and strictly abide by the construction operation specifications and quality requirements. , and formulate effective and effective safety construction measures to achieve safe production and civilized construction. Party A is not responsible for any quality and safety problems caused by Party B's construction and has the right to instruct Party B to make corrections.
V. Contract price and payment method
1. The labor unit price for the fence contracted by this contract is 80 yuan per day (not including food and accommodation), and the tentative total length is 60 meters. The actual amount shall prevail.
2. Payment method: Party A and Party B agree that Party A is responsible for providing all cement, sand, sand, bricks and other materials, and the labor payment for the project will be paid in one lump sum after Party B completes the project and 10 days after Party A's acceptance (A The party is responsible for issuing tax invoices and paying taxes).
6. Other matters not covered shall be resolved through separate negotiation between Party A and Party B.
7. This contract is made in two copies, with Party A and Party B each holding one copy.
8. This contract will take effect from the date of signature and will be automatically canceled after the settlement of the project is completed. This contract is protected by law. If this contract conflicts with relevant national laws or the superior department determines that it is illegal and unreasonable, this contract will automatically become invalid. If it is caused by Party A, Party A will be responsible. If it is caused by Party B, Party B will be responsible.
Party A (signature): People present:
Party B (signature):
Year, month and day
Wall reconstruction project settlement list
The school wall was completed on December 20, 2011 (due to the school, the school purchased building materials and the construction was carried out by Party B of the contract. The current settlement is as follows:
1. Materials: 11,580 yuan< /p>
1. 100 barrels of machine-made red bricks: 5,800 yuan
2. Brick freight (Guangxi Wanggao-Guanshuige): 1,300 yuan (13 yuan per barrel)
3. 11 cubic meters of frozen foundation sand: 880 yuan
4. 2 trucks of wall sand: 700 yuan
5. 5 tons of cement: 1,750 yuan
< p> 6. 6 cubic meters of gravel: 360 yuan7. 106 packages of lime: 424 yuan
8. Wire and nails/nails/formwork/barrels, etc.: 366 yuan
2. Labor: 9,200 yuan
1. South foundation: 800 yuan
2. South wall construction: 3,200 yuan
3 , Foundation and wall construction on the east side: 4,000 yuan
4. Demolition of the old wall on the east side (including removal, cleaning and flushing): 1,200 yuan (negotiable price, no tax invoice)
3. Tax payment: 896.39 yuan
1. Material tax: 337.28 yuan
2. Labor tax: 559.11 yuan
4. Total project price
The total of the above three expenses is 21,000, 6,000, 17, 6, 30, 9 cents (¥: 21,676.39 yuan)
Signature of the settler:
Principal : Vice President: Director of General Affairs: Supervisor: Accountant: Cashier:
Representative of Party B:
Teacher Representative:
December 31, 2016
Temporary Wall Construction Contract II
Contractor: Jiangxi New Wanyi Real Estate Co., Ltd. (hereinafter referred to as Party A) Contractor: Jiangxi Zhongtai Construction Engineering Co., Ltd. (hereinafter referred to as Party B) By A, Party B *** negotiated friendly, and Party A entrusted Party B to carry out the construction of the temporary fence project of Fuxing Home. In order to clarify the rights and obligations of both parties during the construction process, this contract was signed after consensus reached by both parties:
1. Project scope and content:
1. Party B undertakes the construction of the wall project of Party A’s Fuxing Homeland plot located north of Minhe Road and west of Jiahe Road in Jinxian County;
2 , The specific construction of the fence can be found in the construction drawings provided by Party B;
3. Due to the geological reasons of the local area, Party B must process the foundation of the fence to ensure the safe construction and use of the fence;
4. Construction requirements for the brick wall: use the datum point designated by Party A as the datum point, C15 concrete cushion, 300 wide and 300 high C20 reinforced concrete floor beams, and the wall is a 240mm wall. The height of the wall is 500mm, the height of the wall columns is 2200mm, and every 4100mm is a span of the wall. The walls and columns are all made of cement mortar surface.
2. Project quality:
1. Party B shall construct according to the drawings, with beautiful appearance and project quality meeting the acceptance standards;
2. Party B’s requirements for the project The main materials can only enter the site for construction after being confirmed by Party A;
3. The construction of the surrounding wall undertaken by Party B must ensure that there is no collapse or cracks in the wall during normal use by Party A.
3. Construction period:
Strictly follow the arrangements of the on-site management personnel, prepare materials and tools according to the construction period, prepare sufficient materials and organize technical forces to ensure that the owner, supervisor and general manager The construction period required by the terms of the contract was to be completed on time, with quality assurance, and safely. The project started on January 16, 2015, and was completed before February 5, 2015.
IV. Project price and payment:
1. Project price:
A: The unit price of the brick wall contracted in this contract is 300 yuan/ m (this price does not include the price of wooden piles, which is calculated separately), the total length is tentatively 120 m, the specific amount shall be subject to the actual amount; the project price is about 36,000 yuan;
B: Contracted by this contract The unit price of wrought iron railings (height 1.7M) on the brick fence is 200 yuan/m, the tentative total length is 120 m, and the project price is about 24,000 yuan;
C: The color of the color contracted by this contract The unit price of the steel plate baffle temporary fence (height 2M) is 120 yuan/m, the total length is tentatively 100 m, and the project cost is about 12,000 yuan.
The above prices include labor, material, machinery and other project-related expenses, excluding taxes.
2. Payment of project funds: 95% of the full amount shall be paid within 10 days after the completion of construction and Party A’s acceptance (according to the actual construction volume),
The remaining 5% shall be paid in full Payment must be made without interest within 15 days after the one-year warranty period expires.
IV. Protection of finished products and semi-finished products:
1. Party B shall be responsible for the guardianship of the completed sub-projects;
2. Party B shall be responsible for the damaged finished products and semi-finished products are responsible for maintenance and recovery, and their economic losses will be borne by themselves. If Party B damages other sub-project products during construction, it shall compensate according to the price;
3. If Party B’s finished products and semi-finished products are damaged due to Party A or other (non-Party B) reasons, Party A shall be responsible for the damage. Party A is responsible for handling it on its own; if Party A needs Party B to handle it, Party A should give Party B a signature and approve the required fees (materials, labor time fees and other corresponding measures) according to the degree of damage, before Party B can carry out repairs.
5. Responsibilities, rights and obligations of Party A
1. Party A shall provide construction conditions and pay project fees in a timely manner in accordance with the contract;
2. Party B is responsible for supervising Party B's project quality, progress, safety, construction period, etc., and proposing the right to make corrections;
3. Make overall arrangements for each process and solve land acquisition issues;
4 , Party A will help Party B solve technical problems such as drawing errors and changes, and apply for visas.
6. Responsibilities, rights and obligations of Party B
1. In order to strengthen on-site management, its construction leader should keep in touch with Party A on site at all times;
2. Party B should strengthen the safety and civilized construction education of its construction personnel, consciously abide by the relevant regulations of the local government, consciously obey Party A's various regulations on safe and civilized construction on site, prevent the occurrence of safety accidents, public security, and criminal cases, and maintain good The image of civilized construction on site;
3. When Party A fails to pay according to the time agreed in this contract, Party B has the right to refuse construction;
4. Party B shall organize in strict accordance with the safety production management regulations Construction, if illegal construction occurs and safety construction occurs, Party B will bear full responsibility.
7. This contract will take effect after it is signed and sealed by Party A and Party B. Both parties shall not breach the contract. If there is a breach of contract, the breaching party shall pay the other party 30% of the total contract amount as liquidated damages.
8. Matters not covered in this contract shall be resolved through separate negotiation between the two parties. Disputes arising during the execution of this contract should be resolved through timely negotiation. If coordination fails or no agreement is reached through mediation, the parties may sue in Jinxian County People's Court.
9. This contract is made in four copies. Party A and Party B each hold two copies. It will take effect after being signed and sealed by both parties, and it will also have legal effect.
10. This contract will take effect from the date of signature and will be automatically revoked after the project warranty period ends.
Attachment: Copy of ID card of Party B’s personnel.
Party A: Party B:
Unit address: Unit address:
Telephone: Telephone:
Date: Date:
Safety Agreement Three
Party A:
Party B:
Party A contracts the fence project to Party B in order to avoid safety accidents during the work process occurrence, clarify the respective responsibilities of both parties, and reach the following agreement through negotiation between Party A and Party B:
1. Workers of Party B entering the construction site must receive safety education organized by Party B's company, abide by the safety system, and obey safety management
p>
Management should be carried out in strict accordance with the safe operating regulations stipulated by the state. If Party B fails to provide safety education to workers, it shall not start work. Party B’s workers must be registered, and a safety responsibility letter signed by the worker confirming Party B’s disclosure must be provided. 2.
3.
4. Party B shall strictly follow Party A’s safety technical briefing to conduct safe operations. Correctly use "Three Treasures" and correct "edge-side" operations. If Party B violates safety operating procedures during the construction process, he will be punished according to the safety management regulations of Party A and Party B.
If a safety accident is caused by Party B's responsibility, Party B shall bear the corresponding responsibilities within the scope of responsibility. .
5.
6.
7. Strictly abide by the rules and regulations of the construction site. You must abide by the law and obey the arrangements and instructions of the on-site management personnel. Adhere to civilized construction and ensure that the site is cleared after the work is completed. The above agreement is in duplicate, and both parties are expected to abide by it. This agreement will take effect after the signature of the person in charge of both parties, and will be void after the settlement is completed.
Party A’s on-site representative: Party B’s on-site representative:
Year, month and day
Construction site safety management system
1. All persons entering the construction On-site personnel must wear safety helmets, job badges, and use safety belts in a standardized manner. Those found not wearing safety helmets, job badges, and safety belts will be punished as follows:
1. Managers or team leaders are not wearing safety helmets, job badges, and safety belts. A fine of 50 yuan/time will be imposed for safety helmets.
2. Workers who fail to wear safety helmets will be fined 20 yuan per time.
3. Those who fail to wear their job badges will be fined 5 yuan/time to 20 yuan/time.
4. Personnel working near the edge or at high altitudes without safety belts will be fined 200 yuan per time.
2. Construction workers (managers, team leaders, workers) are prohibited from going to work after drinking. Once found, they will be ordered to stop working for that day, and a fine of 50 yuan per time to 500 yuan per time will be imposed.
3. It is strictly prohibited to throw objects, tools, utensils, etc. from high places. Violators will be fined from 200 yuan per time to 500 yuan per time.
4. Open defecation at the construction site is strictly prohibited. Violators will be fined from 200 yuan per time to 500 yuan per time. At the same time, all feces at the construction site must be removed until the second violator is found.
5. It is strictly prohibited to wear hard-soled shoes or slippers into the construction site.
6. Children and persons not related to the construction are strictly prohibited from entering the construction site.
7. It is strictly prohibited to pull or connect wires without permission, and it is prohibited to use electric stoves, ovens, water heaters, etc. in the dormitory. Violators will be fined from 50 yuan per time to 1,000 yuan per time
8. Outsiders are strictly prohibited from staying overnight.
9. If any unsatisfied matters occur during construction, management personnel and team leaders should be immediately organized to resolve the matter through negotiation. If any party fails to cooperate, a fine of 500 yuan/time to 1,000 yuan/time will be imposed. .
10. Any fines for those who violate the above regulations shall be paid by the team leader of the team. If payment is not made, no further work shall be carried out.
Party A’s on-site representative: Party B’s on-site representative:
Year, month, day, year, month, day
Management system of each squad leader, each group leader and foreman
1. Each team leader must be on-site at all times.
2. Obey the arrangements of on-site management personnel.
3. Be fully responsible within the scope of work.
4. Each team leader must be familiar with construction drawings, technical specifications and quality requirements.
5. Organize workers to conduct quality and safety education before work, and submit it in writing to the office.
6. Regularly organize workers to learn various safety regulations.
On-site representative of Party A: On-site representative of Party B:
Year Month Day Year Month Day