Current location - Quotes Website - Signature design - Is specific verification the last sign?
Is specific verification the last sign?
Specific verification is not the final sign.

If you want to see the strength of the structure, you must leave the specimen under the same conditions, and there is no specific time limit.

The verification record of concrete test block shall be signed by two people, the first one is the inspection recorder, and the second one is the inspection recorder. Each original inspection record shall be signed by more than two people.