Engineering Maintenance Contract Sample (1)
Party A (contractor)
Party B (contractor)
Signing date: ?
Party A: Party B:
According to the provisions of the "Contract Law of the People's Republic of China" and other relevant laws and regulations, combined with the specific circumstances of this project, Party A and Party B shall comply with the voluntary agreement On the basis of equality, fairness and good faith, this contract is signed by consensus of both parties.
Article 1 Project Overview
1. Project Name:
2. Project Location:
Article 2 Project Scope
p>The scope of the project contracted by Party B:
Demolish 176 square meters of the original defective pavement and excavate 30 centimeters vertically, make a two-step 3:7 lime soil cushion, and pour 20 centimeters thick C30 concrete pavement , install road buds on road sections without road buds, make asphalt joints between old and new concrete pavements, remove construction waste generated on site, and maintain finished products.
Article 3 Contracting Method
Contracting Method: Contracting of Work and Materials
Article 4 Contract Duration
1. The duration of this contract is Five working days, calculated from the date Party B enters the site.
Article 5 Project Price
(1) The project price (tax included) is: (uppercase) (lowercase) RMB yuan.
Article 6 Project price payment
The project drawings and details in the contract attachment and the content stipulated in the scope of the project shall be paid once and for all. If any conditions change, the project price will not be adjusted. The entire project must be completed according to the above "project scope" and the project payment shall be paid in one lump sum after passing the inspection and acceptance.
Article 7 Project Quality
1. Party A shall provide Party B with a set of construction drawings one day before Party B enters the site, and make technical disclosures to Party B.
2. Party B shall organize the construction according to the engineering drawings, construction instructions, etc.
3. If a concealed project is involved, Party B shall notify Party A to come to the site for acceptance inspection before the project is concealed. If the inspection fails, Party B shall make rectifications and re-accept.
4. Party B ensures that the project complies with relevant national technical standards for engineering construction.
5. The concrete, lime, asphalt, and other materials used in this project must comply with relevant national quality standards.
Article 8 Acceptance
1. After the completion of the project, Party B shall notify Party A for acceptance. Party A shall organize a joint acceptance inspection by both parties within the day after receiving the acceptance notice.
2. This project shall be jointly accepted by Party A and Party B based on the relevant standards and specifications of the construction drawings and design instructions. If the acceptance quality standards stipulated in the contract are not met, Party B will rework the work free of charge within the specified period.
Article 9 Quality Warranty
1. Party B is responsible for the warranty during the construction period in the area to ensure that the road surface is smooth and firm, and Party B also makes a quality warranty commitment. If Party B is not responsible for the warranty, Party A has the right to deduct the warranty costs incurred by Party B from other project payments, and Party B shall not question it.
2. During the warranty period, if Party B meets the warranty conditions, Party B shall repair the damaged road surface within a limited time after receiving the written warranty notice from Party A.
Article 10 Rights and Obligations of Party A
1. Before starting construction, Party B shall provide construction drawings and make on-site disclosures, which shall be confirmed by both parties on-site.
3. The representative of Party A of the project shall supervise the quality and progress of the project and be responsible for confirming the project.
Article 11 Rights and Obligations of Party B
1. Party B shall cooperate with relevant departments to carry out on-site safety protection, safety facilities and garbage disposal.
2. Participate in the on-site disclosure organized by Party A and cooperate to form a written disclosure document.
3. Comply with national or local government regulations on construction site management, and properly protect surrounding buildings, equipment and pipelines encountered during construction and excavation.
4. Party B must carry out construction and installation in accordance with the construction drawings confirmed by Party A on site or provided by Party A and the installation plan and method confirmed by Party A, and shall not make any unauthorized changes. If there are any changes, a written change notice shall be provided. shall prevail.
7. If Party B violates relevant safety operating procedures or regulations during the construction process and causes quality accidents or safety accidents, Party B shall bear full responsibility and all losses caused thereby. Party A is not responsible for any joint and several liability.
Article 12 Liability for breach of contract
1. If the completion is overdue due to Party B’s reasons, Party B shall pay Party A liquidated damages for the price of the project for each day overdue. ?
Article 13 Effectiveness and termination of the contract
1. Effectiveness of the contract
This contract will take effect from the date of signature or sealing by both parties. The attachments attached to the contract have the same effect as this contract. This contract is made in four copies, with each party holding two copies.
Article 14 Dispute Resolution Methods
If a dispute arises between the two parties, they may resolve it through negotiation or apply to the relevant department for mediation.
Article 15 Payment Method
After Party A passes the acceptance and settlement is completed, 90% of the total settlement price will be paid to Party B; the remaining 10% of the project payment will be paid from the date of passing the acceptance. Pay in full one year from now. Party B shall issue an official national invoice approved by Party A's finance for payment, otherwise Party A has the right to refuse payment. During the construction process, Party B will be responsible for any actions that affect the construction due to villagers' disturbances, which shall not affect the progress of the construction and cannot be passed on to Party A. All costs incurred shall be borne by Party B.
Contract attachments:
1. Omitted
2. 1 construction drawing and list of road maintenance project costs
(No text below)
Party A: Party B:
Representative: Representative:
Address: Address:
Telephone: Telephone:
Date: Date: Project Maintenance Contract Template (2)
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
< p> This is because Party A needs to carry out daily sporadic maintenance work. Party B is required to be responsible for sporadic maintenance work. This sporadic maintenance project is a labor and material contract, and all materials are provided by Party B. The following agreement has been made through negotiation between the two parties:1. Project content and project requirements:
1. When repairs are carried out during working hours, the normal school order must not be affected, and at the same time, it must be done effectively Take safety precautions and do not affect other facilities during construction. If there is any damage, Party B will be responsible for compensation and repairs;
2. When working, you must construct in accordance with relevant specifications, abide by laws and regulations, and comply with Party A's relevant rules and regulations. ;
3. Party B must strictly take corresponding technical measures during the construction process;
4. Party B must be conscientious and responsible during the construction process and must not endanger the original facilities. If there is any damage, , all responsibilities shall be borne by Party B and responsible for repairs, and Party A reserves the right to further pursue legal liability against Party B;
5. When performing high-altitude operations, Party B shall independently take safety precautions and do its own Personal safety and all safety responsibilities shall be borne by Party B, and Party A shall not be held responsible.
2. Project cost: The actual settlement cost is (lowercase: yuan) (see the acceptance list for specific costs).
3. Payment method: Pay in full within one month after the project is accepted.
4. Shelf life: One year from the date of completion acceptance. (This maintenance project has been completed on the day of the year and has passed the acceptance inspection.)
5. Party B must take safety precautions for on-site construction in accordance with relevant national and local norms and regulations, and strictly abide by the safety operating procedures. Party B is responsible for any accidents that occur during the construction period, and Party A does not bear any responsibility. All construction tools shall be taken care of by Party B.
6. This contract is made in two copies, with each party holding one copy. It will take effect after being signed and sealed by both parties.
Party A: (Signature and seal) Party B:
Party A’s representative: ID number: Account number:
Year, month and day: Project maintenance contract template (three )
Party A:
Party B:
After friendly negotiation between Party A and Party B, in line with the principle of fairness and justice, Party B will undertake the project of Party A’s Jade Screen Purple Air Shan Farmer's Market decoration project, the specific matters are as follows:
1. Construction content: The construction will be carried out by the project designated by Party A.
2. Construction quantity: Farmers’ market:
1. Stainless steel electric rolling door project (1 manual, 3 electric);
2. Glass partition project (made of 12mm tempered glass, wood panel including imitation porcelain, stainless steel batten, etc.);
3. Ceiling, wall, and column imitation porcelain engineering;
4. Use energy-saving lighting for lamps;
5. Special wires for stainless steel electric doors (4mm2 Jade plate steel core);
6. Power cords are calculated based on the square of the ground (4mm2 white
7. Brick glass footrest; 8. Wooden board covering water pipe cylinder surface including imitation porcelain material;
9. Replace damaged sewer pipes Project;
10. Cleaning sewage ditch project.
3. Undertaking method: Party B adopts the form of contracting work and materials. If Party B encounters any changes from Party A during the construction process, it must be resolved through negotiation between Party A and Party B.
4. Project cost: Thirty-six thousand, one thousand and eight hundred yuan (¥: x yuan) lump sum.
5. Quality Assurance: Party B shall strictly carry out construction in accordance with the project agreed by Party A, ensuring quality and quantity.
6. Construction start date: year month day, completion date: year month day.
7. Safety: Party B shall be responsible for any safety accidents during the construction process. ?
8. Deposit: From the date of signing the contract, Party B will pay Party A a deposit of 20,000 yuan and deliver it to Party A. Party A will return the deposit (20,000 yuan) within six months after the project is started and completed. yuan) to Party B.
9. Payment method: The project payment will be allocated to Party B based on the progress of the project. Payment will be made once every ten days. The first allocation will be 100,000 yuan on December 28. Party A will pay Party B 30,000 yuan for the project after the project is completed. Ten thousand and one thousand and eight hundred yuan will be paid in full, and the remaining project funds will be paid to Party B in one lump sum if no quality problems occur within six months after Party A passes the inspection and acceptance.
10. Liability for breach of contract: (The construction period is 40 days) If Party B fails to complete the project on time, it will be fined 1,000 yuan for one day overdue, and will be rewarded 1,000 yuan for one day in advance. Party A does not allocate the project funds on time, resulting in the project not being completed on time. , Party A is solely responsible.
11. Unfinished matters shall be negotiated separately by both parties. This contract is made in four copies, with Party A and Party B each holding two copies. The above contents shall take effect on the date of signature by both parties.
Party A: Signature and seal:
Party B: Signature and seal: Agent: Identity card number: Account opening bank: Account number:
Agent:
ID number: Account opening bank: Account number:
Year, month, day, year, month, day project maintenance contract template (4)
Contract issuing party (Party A): xx Medical University
Contractor (Party B):
In accordance with the provisions of the "Contract Law of the People's Republic of China" and relevant laws and regulations, combined with the specific circumstances of this project, the two parties have reached the following agreement .
Article 1 Project Overview
1.1 Project Name:
1.2 Project Location: xx Medical University
1.3 Contracting Method: Party B Contractor Package materials
1.4 Construction period: This project will be completed by the year and month from the signing of the contract.
1.5 Project quality: qualified.
1.6 Contract price (RMB): Capital letters (¥)
Article 2 Party A’s work
2.1 Three days before the start of construction, on-site disclosure will be made to Party B. Provide Party B with water, electricity, gas, telecommunications and other equipment required for construction, and explain the precautions for use.
2.2 Designate Party A as the representative stationed at the construction site to be responsible for the performance of the contract. Supervise and inspect project quality and progress, and handle acceptance, changes, registration procedures and other matters. If an economic visa is involved, the approval procedures must be completed in accordance with the relevant regulations of Anhui Medical University.
2.3 If it is determined that the original building structure or equipment pipelines need to be demolished or modified, you are responsible for going to the relevant departments to handle the corresponding approval procedures.
Article 3 Responsibilities of Party B:
3.1 Project quality: Party B shall strengthen quality control measures and management during construction to ensure that the project quality reaches a qualified level.
3.2 Labor safety: Party B shall strengthen the labor management and labor education of construction site personnel, pay attention to labor safety, do a good job in fire prevention, theft prevention, and electric shock prevention at the construction site, and shall not destroy the safety perimeter of the construction site at will. If there is a work-related injury or accident, Party B will be solely responsible for it. At the same time, Party B's construction personnel must obey and abide by the relevant regulations and rules and regulations of Party A's management.
3.3 In terms of civilized construction: Material stacking and on-site construction should be subject to Party A’s management, so that materials are stacked neatly and standardized, and the construction site is guaranteed to be clear after completion; the construction site is kept clean and unobstructed. Fights and fights are strictly prohibited at the construction site, and drinking before work is strictly prohibited. Those who violate their responsibilities will be severely punished, and the fines will be directly deducted from the project payment.
3.4 Protection of finished products: Party B should strengthen the protection of finished products, not only to prevent finished products from being damaged by others, but also to prevent damage to other people’s finished products. If Party B's own finished products are damaged, Party B will be responsible for them; if Party B damages other people's finished products, the loss will be borne by Party B, and the cost of the damage will be deducted from the project payment.
3.5 Responsible for protecting surrounding buildings and decorations, equipment pipelines, green spaces, etc. from damage, otherwise the corresponding expenses shall be borne.
3.6 Cooperate with relevant departments to carry out on-site security, fire protection, garbage disposal and removal, and bear the expenses.
3.7 Insurance and all accidents such as casualties during the construction period shall be borne by Party B, and all expenses incurred shall be paid by Party B in full.
3.6 Designate Party B as the representative stationed at the construction site to be responsible for the performance of the contract. Organize construction as required, ensure quality and quantity, complete construction tasks on schedule, and resolve various matters that Party B is responsible for.
Article 4 Construction Period Agreement
4.1 When Party A requires that the construction be completed earlier than the construction period stipulated in the contract, Party B shall obtain the consent and pay Party B for the measures taken to rush the work.
4.2 Because Party A failed to complete the work as agreed, the construction period was affected and the construction period was postponed.
Article 5 Project Quality and Acceptance Standards
5.1 This project is based on construction drawings, practice instructions, design changes and "Construction and Acceptance Specifications for Building Decoration Projects" (JGJ73-91), "Construction and Installation Project Quality Inspection and Assessment Agreement Standards" (GBJ300-88) and other nationally designated construction and acceptance specifications are quality assessment and acceptance standards.
5.2 The quality of this project meets the national quality assessment standards.
5.3 Party A and Party B shall promptly handle the inspection and acceptance procedures for concealed projects and intermediate projects. If Party A fails to participate in the acceptance inspection of concealed projects and intermediate projects on time, Party B may accept the inspection on its own, and Party A shall acknowledge it. If Party A requires re-inspection, Party B shall handle the re-inspection as required. If the re-inspection is qualified, Party A shall bear the cost, which will result in work stoppage and the construction period will be postponed; if the re-inspection is unqualified, the re-inspection and rework costs shall be borne by Party B, but the construction period will also be postponed.
5.4 If a quality accident is caused by Party B, the rework costs will be borne by Party B and the construction period will not be postponed.
5.5 After the completion of the project, Party B shall notify Party A for acceptance. Party A will set a different date for acceptance after receiving the acceptance notification from Party B. However, Party A shall acknowledge the completion date and bear Party B's care fees and related expenses.
Article 6 Settlement of Project Payment
6.1 Both parties agree that the price of this contract shall be based on item (2);
(1) Fixed price.
(2) Winning bid price (including bidding risk) + economic visa. The changed part will be settled based on the actual engineering quantity. If an economic visa is involved, the approval procedures must be completed in accordance with the relevant regulations of Anhui Medical University.
(3) Adjustable price; the cost is calculated in accordance with relevant national project pricing regulations, and adjustments and completion settlement are made in accordance with relevant regulations.
6.2 Quotas adopted for project settlement: 2000 "National Unified Construction Project Basic Quota Anhui Province Comprehensive Valuation Table Hefei Region Comprehensive Price List" (Second Edition), 1999 "Anhui Province Decoration Project Comprehensive Valuation Table Hefei" "Regional Price List", "National Unified Installation Project Budget Quota 2000 Anhui Province Valuation Table". The material prices are based on the construction project market price information of Hefei City in year and month.
6.3 Fee collection standards: Fees are collected according to four categories.
Article 7 Quality Guarantee Period
The warranty period for this project is 1 year. During the warranty period, if the project becomes loose or falling off due to subjective or objective factors such as natural forces, Party B must arrive at the site within 2 days for free repairs.
Article 8 Payment Method
8.1 After the project is accepted, the contract amount up to 70% of the contract price will be paid to the winning bidder;
8..2 After After the audit department of Anhui Medical University audits and issues a settlement report, 95% of the final settlement price will be paid, and the performance deposit (without interest) will be returned at the same time.
8.2 5% of the settlement price will be retained as a project quality deposit. When there are no quality problems at the end of the warranty period, the tenderer will refund the project quality deposit (without interest).
Article 9 Material Supply Agreement
9.1 The materials purchased by Party B shall be qualified products that meet the requirements of this project and comply with relevant national standards.
9.2 Any materials purchased by Party B that do not meet the quality requirements or have different specifications shall be prohibited from use. If it has been used, all losses caused to the project will be borne by Party B.
Article 10 Agreement on production safety and fire prevention
10.1 The construction drawings or practice instructions provided by Party A shall comply with the "Fire Protection Regulations of the People's Republic of China" and relevant fire prevention designs specification.
10.2 Party B shall strictly abide by the "Safety Technical Regulations for Construction and Installation Projects", "Safety Operating Regulations for Construction and Installation Workers", "Fire Protection Regulations of the People's Republic of China" and other relevant laws and regulations during the construction period. specification. Because Party B violates relevant safety operating procedures and fire protection regulations during the construction and production process, resulting in a safety or fire accident, Party B shall bear all economic losses caused thereby.
Article 11 Liability for breach of contract
11.1 Due to Party B’s reasons, if the construction is overdue, Party B will pay Party A 5% of the liquidated damages for each day overdue.
11.2 Party B shall properly protect the equipment provided by Party A and the furniture, furnishings and finished engineering products stacked on site. If any loss is caused, Party B shall compensate according to the price.
11.3 Party A agrees to dismantle or modify the original building structure or equipment pipelines without completing any formalities. Party A will be responsible for and bear the losses resulting from any losses or accidents (including fines).
11.4 Without the consent of Party A, Party B dismantles or modifies the original building structure or equipment pipelines without authorization. Party B is responsible for and bear the losses resulting from any losses or accidents (including fines).
11.5 Without completing the acceptance procedures, Party A uses it in advance or uses it without authorization. Party A will be responsible for any losses caused.
11.6 When the contract cannot continue to be performed due to one party’s reasons, the other party should be notified and the contract termination agreement should be processed, and the responsible party should compensate the other party for the resulting economic losses.
Article 12 Disputes or Dispute Handling
12.1 During the performance of this contract, if a dispute arises between the two parties, the two parties can resolve it through negotiation or request a settlement without affecting the progress of the project. Relevant departments will mediate.
12.2 Resolution of contract disputes: Disputes arising during the performance of this contract shall be resolved through negotiation between the parties; they may also be mediated by the local industrial and commercial administrative department; if negotiation or mediation fails, the following shall apply (2) ways to solve it.
(1) Submit to the Hefei Regional Economic Arbitration Commission for arbitration;
(2) File a lawsuit with the People's Court where the construction project is located in accordance with the law.
Article 13 Other Agreements
13.1 During this construction, Party B must always pay attention to construction safety, and at the same time try to avoid making loud noises on campus to avoid affecting the normal activities of students. Learning and personal safety.
13.2 Party B shall strictly follow the construction procedures. Each procedure must be inspected and accepted by Party A before the next procedure is constructed, thereby ensuring the quality of the project.
13.3 During construction, if there are any changes to the project, Party A shall promptly notify Party B and apply for an economic visa.
13.4 If the completed project quantity is reworked due to Party A’s failure to notify in time, Party A will be responsible for Party B’s economic losses.
Article 14: Other undisclosed matters shall be resolved through negotiation between the two parties based on the principles of equality, voluntariness, fairness, honesty and credibility.
Article 15 The bidding documents are an integral and important part of the contract. Any content not specified in the contract shall be subject to the bidding documents of this project.
Article 16 This agreement is made in three copies, with Party A having four copies and Party B having two copies.
Contractor: xx Medical University (seal) Contractor: (seal)
Legal representative: Legal representative:
Authorized agent: Authorized agent:
Telephone number: Telephone number:
Account opening bank: Account opening bank:
Account number: Account number:
20 Year, month and day 20 Year, month, and day project maintenance contract template (5)
Construction unit: (hereinafter referred to as Party A)
Construction unit: (hereinafter referred to as Party B)
According to "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and other relevant laws and administrative regulations, following the principles of equality, voluntariness, honesty and trust, the two parties will discuss the construction matters of the campus maintenance and renovation project. By consensus, this contract.
1. Project Overview
1. Project Name: Campus Maintenance and Renovation Project.
2. Project location: Guangyi Experimental Middle School in Sports New City.
3. Project contract scope:
a. Leak-proof renovation of 150 dormitory bathrooms;
b. 290 washbasin countertop renovations in dormitory buildings ;
c. Renovation and treatment of water leakage in the canteen ground drainage ditch;
d. Renovation and treatment of water leakage in the men's and women's toilets on the roof of the garage of the teaching building;
e. Teaching building 2. The patio on the fourth floor is sealed;
f. The "triangular" patios on the fifth floor at both ends of the teaching building are sealed;
4. Quality requirements: excellent project
5. Contract Project: The calendar construction period of this project is days. The start date is x month x, 20xx, and the completion date is x month x, 20xx. (The specific progress is subject to the project progress control approved by Party A)
2. Project contracting method and price
1. Project contracting method: contracting work and materials, total contracting method, total cost RMB: If the project quantity increases or decreases, the total cost will be increased or decreased according to the quotation in the list.
2. Project payment method: 60% of the total price of the completed work shall be paid within ten days after the completion of the project, and 95% of the total cost of the completed work shall be paid within five days after completion settlement. The remaining 5% is used as a guarantee deposit and will be returned without interest after one year.
3. Quality Requirements
1. Party B shall carefully organize the construction according to the requirements of Party A, strictly control the quality of the project, and carry out the work according to excellent engineering standards
for management objectives.
2. In order to ensure the quality of the project, the brands and manufacturers of cement, steel, ceramic tiles and other main materials used in the project must be approved by Party A before they can be used on site.
IV. Rights and Obligations of Party A
1. Party A appoints Engineer Xiong from the Engineering Department and relevant personnel from the school’s general affairs to supervise the construction on site.
2. Party A shall appoint relevant department heads to coordinate supervision work.
3. Party A has the right to inspect and test the materials and inspect and accept the project, and the costs will be borne by Party B.
4. Party A has the right to manage the technical quality of the site and coordinate the construction. The on-site visa shall be subject to the signature of the school’s general affairs staff.
5. After the contract is signed, Party A is responsible for organizing relevant personnel to conduct on-site technical briefings.
5. Rights and Obligations of Party B
1. Party B shall provide practical construction organization design and plan, and submit them to Party A’s General Affairs Office for approval.
2. Party B shall send on-site management to organize the construction. The above personnel shall not leave the construction site without Party A's approval, otherwise it will be deemed as a breach of contract.
3. Party B shall organize rework of unqualified projects in a timely manner, and all economic losses caused by failure to rework in time shall be borne by Party B itself.
4. Party B shall be responsible for all losses, delay in construction period and increase in construction costs caused by Party B’s ineffective measures or missing quotations.
6. Quality Warranty
The warranty period for leak-proof projects within the quality period is five years. The warranty period starts from the date when the project is completed and accepted, and free rework and repairs will be carried out within the next three days. . If there are quality problems caused by improper use or other reasons, Party B will be responsible for repairs but Party A will be responsible for the expenses incurred.
7. Safe Construction
1. Safe Construction and Inspection
(1) The contractor shall abide by the relevant management regulations on construction safety production and strictly follow the safety regulations. Organize construction according to standards, accept supervision and inspection by safety inspectors in accordance with the law at any time, and take necessary safety protection measures to eliminate hidden dangers of accidents. The contractor shall be solely responsible for any liability and expenses incurred due to the contractor's inadequate safety measures.
(2) The contractor should provide safety education to its staff at the construction site and then be responsible for their safety. The developer shall not require the contractor to carry out construction in violation of safety management regulations. If a safety accident is caused by the contractor, the contractor shall bear the corresponding liability and expenses incurred.
8. The Effectiveness of the Contract and Others
1. This contract shall take effect from the date when the legal representatives or authorized agents of both parties sign and the unit stamps the official seal, and will remain in effect until all contract rights and obligations are fulfilled. Terminate automatically.
2. This contract is made in triplicate, two copies for Party A and one copy for Party B. The attachments and the contract have the same legal effect.
3. Dispute settlement: When any dispute arises under this contract, both parties shall resolve it through negotiation. If negotiation fails, the matter shall be resolved through trial in the People's Court and shall be under the jurisdiction of the People's Court where the project is located.
Party A (seal): Party B (seal):
Signature of the representative:
Signing date: Signing period: Signature of the representative: