Current location - Quotes Website - Signature design - Technical Agreement
Technical Agreement

As society continues to progress, we use agreements in more and more places. Signing an agreement can ensure a happy cooperation between both parties. There are many things to note in the agreement, are you sure you know how to write it? Below are 7 technical agreements that I have collected for everyone. They are for reference only. Let’s take a look. Technical Agreement Part 1

Party A:

ID number:

Party B:

ID number:

Party A and Party B have fully negotiated on the basis of equality and voluntariness to cooperate in opening ________ restaurant, clarifying the rights and responsibilities of all parties to the cooperation, and have entered into the following terms of the agreement, which will be executed simultaneously.

1. Cooperation method

Party A contributes capital, accounting for _____% of the shares; Party B contributes technology, accounting for _____% of the shares.

2. Cooperation projects

_______________________________.

3. Cooperation time

It is tentatively scheduled for ______ years, starting from the date when this contract is signed and becomes effective. After the expiration of the term, if both parties wish to continue cooperation, they can revise and sign a new agreement based on this agreement.

IV. Division of Cooperation

1. Party B is responsible for the technology development, production training, and production monitoring of the project. Party A is responsible for the rest (including equipment investment, material procurement, product sales, product distribution, financial management, etc.).

2. All parties reserve the right to review the financial operations of the project on a monthly basis. If there are any questions about the financial revenue, expenditures, profits and losses, they have the right to verify the original documents and check the accounts. If the accounts are suspicious and the parties concerned cannot provide a reasonable explanation, the project cooperation parties have the right to pursue the financial and legal responsibilities of the parties concerned. All original receipts and payments documents involving all accounts of expenditures and income of the project must be signed and approved by all parties and submitted to the financial administrator for accounting.

5. Technology and market confidentiality

During the cooperation period, no one may transfer technology and market content without the consent of all parties to the project, and no one may transfer technology and market content to partners other than the project partners. To cooperate or seek benefits for others, technology must not be leaked. The project partner who violates the rules has the right to confiscate the relevant income of the responsible party and hold the responsible party accountable for its economic and legal responsibilities.

VI. Income distribution

1. The profits from the project will be divided according to the different equity ratios held by the partners, among which Party A will share ___% of the equity and Party B will share the equity. Divided into______%. Under the condition of ensuring the normal operation of the project, year-end dividends will be distributed once a year (the dividends of the previous year will be divided in January _____ every year). If it is necessary to retain profits when expanding business operations, it must be approved by all parties and shall not exceed ______% of the total annual profits. This withdrawal is calculated as the equity investment of each party based on the proportion of equity held by each party.

2. Considering Party B’s individual situation, Party B has the right to advance salary, but half of the salary will be deducted from Party B’s year-end dividends, and the other half will be included in the project operating costs.

3. The fixed assets part of the funds provided by Party A shall be depreciated over five years, but the working capital part shall not bear interest.

4. Party B is responsible for losses caused by product quality problems, and Party A is responsible for losses caused by bad and bad debts caused by poor sales management.

7. Cooperation safeguards

1. During the cooperation period, if either party to the project partner withdraws from the cooperation project without the consent of the other party, the responsible party will also compensate for the infringement. The party's investment losses and other income due during the cooperation period (specifically: calculated based on the average income due to the injured party from the date of cooperation to the time of the accident, the responsible party shall compensate the injured party's total income for the remaining contract period) . And must abide by technology and market confidentiality terms, and shall not use or operate the similar technical content and market content of this project locally within two years. Otherwise, all parties to the project cooperation have the right to pursue all economic and legal responsibilities of the defaulting party.

2. If the project cooperation is disbanded or the cooperation period expires due to force majeure factors such as war, disaster, disease, etc. during the cooperation period, each partner will no longer cooperate. The technical content of the project belongs to both parties.

3. If one of the partners violates this contract, the other party has the right to cancel cooperation with the defaulting party and hold the defaulting party responsible for all economic and legal responsibilities.

8. Other unspecified matters will be supplemented after mutual negotiation by both parties. The supplementary terms will have the same legal effect as this contract.

9. This contract is made in _____ copies, with Party A and Party B each having _____ copies.

Party A: (Signature)

_________Month______day, _________

Party B: (Signature)

Technical Agreement Part 2 on _________year______month______

Technical Equity Cooperation Agreement

Party A: xxx (ID Number:)

< p>Party B: xxx (ID number:)

Party A and Party B have fully negotiated on the basis of equality and voluntariness, and have entered into the following agreement regarding the cooperation in establishing XX factory and clarifying the rights and responsibilities of all parties to the cooperation. The terms of the agreement are subject to execution.

1. Cooperation method:

Party A contributes capital and holds 70% of the shares; Party B contributes technology and holds 30% of the shares.

2. Cooperation projects:

xxxx. Including various xxxxxxxxxx.

3. Cooperation time

It is tentatively scheduled for X years, starting from the date this contract is signed and becomes effective. After the expiration of the term, if both parties wish to continue cooperation, they can revise and sign a new agreement based on this agreement. Technical Agreement Part 3

Parties entering into the contract:

______ County ______ Commune (Township) ______ Brigade (Village) ______ Production Team Member: ______, hereinafter referred to as A Party;

Member of ______ County ____ Commune ______ Brigade ______ Production Team: ______, hereafter referred to as Party B.

In order to develop rural commodity production, improve the technical level of ______ production, and improve economic benefits, after full consultation between Party A and Party B, this contract is signed for the sole purpose of abiding by both parties.

1. At the invitation of Party B, Party A goes to Party B’s place of residence to teach ______ production technology. The term of the contract is _____ years and ___ months, that is, from ____ month ____, 19______, to ___, month ____, 19______.

2. By the expiration of the contract, Party A guarantees that Party B reaches the following technical level:

3. Party B is responsible for providing Party A with the funds necessary to teach ________ production technology______ Yuan, provide production equipment _______________ to ensure the timely supply of ___________ raw materials. Party B shall strictly obey Party A’s technical guidance.

Fourth, during the execution of the contract, Party B will pay Party A ______ yuan every month, which will be settled on a monthly basis (or it will be settled uniformly at the end of the contract period). Party A's board and lodging shall be arranged by Party B, and the expenses shall be borne by Party ______.

5. When the contract period expires, if Party A’s instruction fails to meet the technical requirements stipulated in the contract, in addition to returning the remuneration paid by Party B and compensating Party B for all losses, Party A shall also pay liquidated damages_ _____Yuan. If Party A suspends the execution of the contract, in addition to compensating Party B for all expenses incurred, Party A shall also pay Party B ______ yuan in liquidated damages. If Party B fails to pay Party A according to the time stipulated in the contract and pays one day late, Party B shall pay Party A liquidated damages at the rate of ______% of the late payment amount. If Party B suspends the execution of the contract, it shall pay Party A all remuneration during the contract period.

Sixth, after the contract takes effect, neither party shall arbitrarily change or terminate the contract. If there are any unsatisfied matters in the contract, supplementary provisions must be made through mutual negotiation between Party A and Party B. The supplementary provisions shall have the same effect as this contract.

Seventh, if the contract cannot be performed due to force majeure disasters, it shall be resolved through negotiation between the two parties.

8. Others:

This contract is made in two original copies, with Party A and Party B each holding one copy. A copy of the contract must be submitted to the production team, brigade, and notary office (if notarized) to keep one copy each.

Party A’s seal (or signature): __________

Party B’s seal (or signature): __________

Party A’s seal (or signature): ____ month ___, 19______ _Japanese Technical Agreement Part 4

Party A:

Party B:

Payment method is: .

Detailed responsibilities of both parties:

1. If Party B finds that the variety received does not comply with the provisions of this contract or the quality of the samples previously provided, Party B may exchange or return the goods. The freight shall be borne by Party A according to the same freight when Party A delivers goods to Party B. If the quantity returned by Party B is insufficient, the contract price shall be deducted from Party B. If the quality is different from that when shipped by Party A, returns will not be allowed.

2. If Party B finds that the quantity is insufficient or the packaging is damaged when receiving the goods, Party B shall ask the carrier to sign and seal according to the actual situation and leave the contact information of the carrier, and please contact Party A immediately. The goods can only be received after communication with the other party, and only Party A can bear the loss of omission.

3. This product is shipped to .

4. When the goods are shipped to Party B, it will take approximately 30 days from the effective date of the contract.

5. When Party B uses the varieties provided by Party A, Party A is responsible for instructing the use methods and technical ingredients of the varieties.

If there is no objection, the above terms will take effect after being stamped and authenticated by both parties and sent back to Party A. After taking effect, if Party B rejects the varieties sent by Party A to Party B for reasons that do not comply with the provisions of this contract, there will be any consequences. The losses shall be borne by Party B.

Party A (official seal): Party B (official seal):

Legal representative (signature): XXX Legal representative (signature): XXX

XXXX year On XX, XX, XX, XX, XX, technical agreement Part 5

(hereinafter referred to as Party A) and (hereinafter referred to as Party B) reached the following agreement regarding technical issues related to Party A’s purchase of transformer equipment. The agreement takes effect simultaneously as an attachment to the contract and has the same legal effect. This agreement is made in six copies, with Party A holding four copies and Party B holding two copies.

1. Model and quantity:

KBSGZY-1250/10/1.2 1 mine explosion-proof mobile substation

KBSGZY-1600/10/1.2 3 mine explosion-proof mobile substations

2. Usage environment:

1. Altitude: no more than 1100m

2. Ambient temperature: maximum temperature +40℃, minimum temperature -5℃

Maximum daily average temperature +30℃, maximum annual average temperature +20℃

3. Relative humidity: no more than 95% (+25℃)

4. In mines where there is a mixture of methane gas and coal dust and there is a risk of explosion

5. There is no strong bumps, vibrations and the inclination from the vertical does not exceed 15°. Environment

6. No gases and vapors that can corrode metal and damage insulation

7. No dripping water

8. The power supply voltage and waveform are similar to Sine wave

9. Installation location: Uphill roadway for transportation in the 21st mining area of ??Xiaojiawa Coal Mine, and along the transportation roadway of the 21st mining area underground.

3. Main technical indicators and functions:

Production standards: GB8286-20xx; GB3836-20xx.

1. Rated capacity: 1600KVA

Rated voltage: high voltage 10KV±5%, low voltage 1200KV

Rated current: high voltage 92.34A, low voltage 769.8A

No-load loss: 3800W Load loss: 8500W

Impedance voltage: 5% No-load current: 1%

Mobile substation flat wheel track gauge 900 mm

< p> 2. Rated capacity: 1250KVA

Rated voltage: high voltage 10KV±5%, low voltage 1200KV

Rated current: high voltage 72.2A, low voltage 601.8A

No load Loss: 3100W Load loss: 7400W

Impedance voltage: 4.5% No-load current: 1%

Mobile substation flat wheel track gauge 900 mm

IV. Switch Configuration

1. The switch adopts high-voltage power distribution device and low-voltage intelligent protection box produced by Bada Vacuum Electrical Switch Factory.

2. The high-voltage side adopts a microcomputer comprehensive protection system. Realize protection functions such as leakage, insulation, phase failure, over-temperature, overload, short circuit, under-voltage, and over-voltage.

3. The low-voltage side adopts a single-chip intelligent protector with Chinese display function. It has complete protection functions, including overload, short circuit, selective leakage, leakage lockout, overvoltage and other protection functions. Digital real-time display of grid voltage, operating current, leakage resistance, etc., and the ability to memorize fault parameters.

5. Spare parts

1. Each model of shifter is equipped with 1 low-voltage terminal block

2. High-voltage travel switch (JLXK1-411), control There are 2 loop relays (JZC4-31AC100v) and 5 fuses of each model (FU5A, FU2A).

VI. Quality assurance and after-sales service

1. Party B provides free training services to Party A’s technical and operating personnel.

2. Each model provides technical documents, operating instructions, training instructions and other technical documents, 6 paper copies and 1 electronic copy; coal safety and explosion-proof certificates, certificates, and factory test reports 1 copy for each unit; 3 paper copies and 1 electronic copy of relevant certification materials for outsourced parts, a breakdown of wearing parts, a detailed list of equipment accessories and reference prices, production licenses, etc.

3. Party B must provide inspection and test debugging records during the production process, technical information on performance acceptance, inspection, trial operation, operation and maintenance, etc.

4. Supply cycle: September 30, 20xx or after Party A notifies Party B of supply, Party B will deliver the goods to Party A’s designated location within one week.

5. Party B will make a substantial response within 2 hours after receiving the notice from Party A, and rush to the site to deal with the equipment failure 24 hours a day.

6. Color of the transformer: red for the high-voltage switch, white for the dry transformer body, and white for the low-voltage switch.

7. The warranty period is 1 year, the warranty period is 3 years, and the service life of the equipment is 15 years.

8. Unfinished matters shall be resolved through friendly negotiation between the two parties.

Signature page

(Signature page)

Party A:

Signature of the representative: (seal)

Contact Information:

Date:

Party B:

Contact Information:

Date: Technical Agreement Part 6

Party A: AAA

Party B: Existing shareholders of xxx Information Co., Ltd.:

Party A and Party B have entered into this agreement after full consultation on the basis of equality and voluntariness, in order to Capital compliance and performance:

Article 1: Party A uses its legally held e-commerce platform technology as an intangible asset to invest in Shanghai xxx Information Co., Ltd. Both parties agree that the value of the technology will be determined through price negotiation. RMB, accounting for 25% of the company's registered capital. (Or: after evaluation, the technology is worth RMB, accounting for 25% of the company's registered capital)

Article 2: Party A should handle the transfer of rights procedures in a timely manner , provide relevant technical information, provide technical guidance, and teach technical know-how, so that the technology can be successfully transferred to Shanghai Dongfanghong Network Information Co., Ltd. and digested and mastered by the company.

Article 3: Each party B agrees to assume strict confidentiality responsibility for any technical secrets and proprietary information provided and disclosed by Party A due to this technology investment, and will not provide it to any party in any way. It will not be occupied or used by a third party, nor will it be used for self-operated business.

Article 4: After the technical achievements become shares, Party A obtains shareholder status, and the e-commerce platform technology is enjoyed by Shanghai xxx Information Co., Ltd.

Article 5: Liability for breach of contract:

Article 6: All disputes arising from the performance of this agreement or related to this agreement shall be resolved through friendly negotiation between the parties; If an agreement cannot be reached, the matter shall be resolved through litigation in the People's Court of the place where the contract was signed.

Article 7: This contract will take effect after it is signed and sealed by all parties to the agreement. This contract is made in one original copy. Each party to the agreement will hold one copy and submit one copy to the approval authority. Each copy has the same validity.

Party A: Co., Ltd. (official seal)

Party B: Existing shareholders of the company (signatures and seals):

Place of contract signing:

Contract signing date: Technical Agreement Part 7

********** Co., Ltd.

****** Project Equipment

Technology

Technology

Agreement

Agreement

Agreement Number: *********

Buyer: ******* Co., Ltd.

Seller: ******* Co., Ltd.

April 20, 2011 8th

1. General Provisions

****** Co., Ltd. (hereinafter referred to as the buyer) and ****** Company (hereinafter referred to as the seller) reached an agreement through friendly negotiation between the two parties. The following specific agreements:

1. Overview

1.1 This technical specification applies to the functional design of the purified gas pressurized fan cooling fan equipment of ****** Co., Ltd. , structure, performance and testing and other technical requirements.

1.2 This technical specification proposes minimum technical requirements. It does not provide for all technical details, nor does it fully quote the provisions of relevant standards and specifications. The seller guarantees to provide products that meet the requirements. Quality products complying with current technical specifications and current industry standards.

1.3 The products provided by the seller shall fully comply with the technical provisions of each supplied equipment proposed by the buyer in writing.

1.4 After signing the contract, the buyer has the right to propose some supplementary modification requirements due to changes in standards and procedures. The specific payment shall be mutually agreed upon by both parties.

2. Responsibility of the seller

2.1 The seller shall strictly carry out production in accordance with the technical information provided by the buyer, and strictly implement the manufacturing specifications and inspection standards in the technical information provided by the buyer. .

2.2 The seller is responsible for fulfilling the equipment manufacturing and delivery schedule.

The seller guarantees that the completion and delivery of the bidding equipment on schedule with quality and quantity will not be affected due to other projects being performed or any other reasons.

2.3 If the standards implemented by the buyer and the seller are inconsistent, the higher standard shall apply.

2.4 When the seller infringes patent rights during the equipment manufacturing process, its infringement liability has nothing to do with the buyer. The seller shall bear the corresponding responsibility and shall not affect the buyer's interests.

2. Fan technical conditions:

1. Site conditions

1.1. Local atmospheric pressure 99800Pa, medium temperature 150℃-250℃,

1.2. Medium composition:

Carbide gas CO CO2 H2 CH4 O2 N2

70-74 5.6 17-20 7.6 0.8 8.7

1.3. Medium Density: 1.039 kg/m3

2. Fan model DW270Ⅰ—11G left and right rotation 180°

2.1. Equipped motor: Y280M—2, 90 kw (JAC Luan ) Protection grade IP54, explosion-proof grade dⅡBT4; maximum speed 2900rpm

2.2. Fan performance:

Transmission medium: gas mixture, temperature 150℃-250℃, medium density: 1.039 kg/m3; Flow: Q=16200m3/h

Pressure boost: P=12000Pa

Impeller diameter 1200mm, material 1Cr18Ni9Ti

Rotor vibration root mean square effective Value: 5.6mm/s

3. Fan structure

Fan type: single suction centrifugal type

Support method: cantilever support

Driving method: The motor is driven through a coupling

The fan is assembled from the factory with an integral steel frame. The casing is made of gray cast iron, split up and down, and equipped with inspection ports and sewage outlets;

The bearing box adopts dual cooling of water cooling and aluminum sheet heat dissipation;

The bearing adopts SKF imported bearings;

The axial gas seal of the fan shell adopts expansion water-saving seal, zero leakage; < /p>

Motor matching: Jianghuai Lu'an Motor Factory

4. Accessories

8 shock absorbers and matching bolts; 1 inlet and outlet matching flange; 1 PTFE seal for the import and export; 2 metal thermometers for the bearing parts;

IV. Technical parameters of G4-73NO9D centrifugal fan

Fan performance:

< p>Conveying medium: air, temperature -10℃-40℃,

Flow rate: Q=35054-44000 m3/h

Pressure boost: P=2441-1776Pa

Impeller diameter 900mm, material 1Cr18Ni9Ti

Rotor vibration root mean square effective value: 5.6mm/s

3. Fan structure

Fan type: Single suction centrifugal type

Support method: cantilever support

Drive method: motor driven through coupling

The fan is assembled from the factory with an overall steel frame, and the casing is Q235A,

The bearing adopts Havalo bearing;

Motor matching: JAC Lu'an Motor Factory (explosion-proof motor YB2-225S-4, 37KW)

4 , Accessories

One inlet and one outlet matching flange; two metal thermometers for bearing parts;

3. Scope of supply and delivery time

1 , four gas pressurized fans (including two left and right 180 degree fans), G4-73NO9D centrifugal fans

2. Delivery time: within the day after the contract is signed.

3. Delivery location: ****** Postal code: ******

4. All electrical control diagrams, basic diagrams, control schematic diagrams, Outline drawing, terminal wiring diagram, etc. (two copies provided), one set of electronic version. Provided within one week of signing the agreement.

IV. Manufacturing and inspection standards

1. Technical documents are provided as per buyer.

2. The standards, specifications and materials used by the seller when manufacturing the contract products shall comply with the latest relevant current standards and specifications issued by the country.

3. "Safety, Operation and Maintenance Instructions" provided by the seller.

4. The appearance quality of equipment (including purchased parts) must reach.

5. The surface of the outer casing and structural parts of the supplied equipment should be smooth and smooth before being sprayed with paint. The paint color should comply with the quality standards of Xinfa Huaxing Co., Ltd.

5. Packaging and transportation

1. The packaging of the equipment should be able to meet the requirements for long-distance transportation, multiple handling and storage. The packaging must be strong, reliable, anti-corrosion, moisture-proof and theft-proof.

2. Installation and debugging, consumable parts, special spreaders, professional tools, etc. must be packaged separately and marked with the host name and installation and debugging consumable parts.

3. The seller is responsible for repairing, replenishing or replacing equipment that is lost, damaged, moldy, rusty, damp and mis-delivered due to the seller’s packaging and transportation.

4. The transportation costs are provided by the seller.

VI. Technical Services

1. The seller shall send the installation and service personnel to the buyer. After the contract is signed, the seller shall designate a project manager responsible for the project to coordinate with the manufacturing plant. Coordination and cooperation in the entire project process, such as project progress, manufacturing design, drawings and documents, equipment matching, packaging and transportation, on-site guidance and installation, debugging, technical briefings, personnel training, etc.

VII. Warranty Terms

1. All equipment provided by the seller has a one-year warranty from the date of production. If there is a quality problem with the product during the warranty period, the seller must provide free repairs. The seller must rush to the product installation location within 48 hours after receiving the buyer’s notification.

2. Party B shall bear full responsibility for the economic losses caused to the buyer’s production and other equipment due to the equipment supplied by the seller not complying with the terms stipulated in the technical agreement and product quality reasons.

This agreement is made in quadruplicate, two copies for the buyer and two copies for the seller.

This agreement is an integral part of the supply contract and has the same legal effect as the supply contract after being signed by both parties. Unfinished matters shall be resolved through negotiation between the two parties.

Buyer: ***** Co., Ltd. Seller: ****** Co., Ltd.

Buyer’s representative: Seller’s representative:

Contact information: Contact information:

Date: Date: