The operated operation ticket should be marked with the word (). A. has it been operated? B, has it been implemented? C, qualified? D. Closed
Topic explanation
Solution
B
1? Fill in the operation ticket
1.1? Generally, the operation ticket should be filled in by the operator according to the order of the long-term value or the all-around main attendant.
1. before filling in the operation ticket, the operation task should be clear, the operation mode should be clear, the system trend and the equipment status should be clear, and the operation ticket should be filled in according to the actual situation on site.
1.3? The operation date, task, content and serial number listed in the operation ticket shall be filled in by the designated operator.
1.4? After the operation ticket is completed, it shall be reviewed step by step according to the order of the operator, guardian, chief attendant or deputy attendant. After confirmation, each operation ticket shall be signed and submitted to the shift supervisor, and the operation can only be carried out after the shift supervisor has approved it.
1.5? If the auditor finds that there is an error in the completed operation ticket, he should ask the responsible person who has signed it, and the operator should fill it out again after confirming that there is an error. The ticket should be stamped "invalid" and the seal should not be destroyed.
1.6? The operation ticket that has been filled out and signed after examination can no longer be operated for some reason, and this ticket should be stamped with the seal of "Not Implemented".
1.7? After the operation ticket is reviewed, the shift supervisor shall fill in the starting time on the first page of this operation ticket.
1.8? The operator operates under the supervision of the guardian. The operator and guardian go to the operation site to see the equipment in the order of the operation ticket, and then the guardian sings the ticket loudly according to the operation ticket. The operator repeats it loudly according to the actual equipment number and gestures the operation direction with his hand. The guardian checks that the operator's repetition and gestures are consistent with the operation ticket, and then orders "operation" (or closing, breaking, pulling, taking and assembling, etc.), and the operator gets the "operation" from the guardian.
1.9? The closing time of high and low voltage side switches of generator outlet switch, line switch, bus coupler switch, start-up and standby transformer, factory high transformer and factory low transformer shall be filled in by the guardian after operating the project.