Although formwork is an auxiliary structure, it is crucial in concrete construction. How to write a template project labor contract contract? The following is a template project labor contract contract that I compiled. Welcome to read it. Template Project Labor Contracting Contract Sample 1
Party A: Party B: ID number:
According to the "Contract Law of the People's Republic of China", "The Contract Law of the People's Republic of China" and "The Contract Law of the People's Republic of China" In order to better clarify the rights, obligations and responsibilities of both parties in accordance with the provisions of the National Construction Law, the "Regulations on Quality Management of Construction Projects" and relevant laws and regulations, follow the principles of equality, voluntariness, fairness, good faith and combined with the actual situation of this project , this contract was signed after careful negotiation between both parties.
1. Project Overview
(1) Project Name: Suiyang Fuhao Plaza, Zunyi City
(2) Project Location:
(3) Project content: Formwork project
(4) Construction area: about 40,000㎡
2. Contracting method
Labor measurement contracting. Chartered machinery and tools, project quality, construction period, safe production, civilized construction, etc.
3. On-site conditions provided by Party A
(1) Party A is responsible for the construction of electricity and water to each floor of each unit project,
1. Installation of secondary and tertiary distribution boxes.
(2) Party A shall provide the rack materials and templates required for formwork support.
IV. Party B’s contract scope and content
(1) Formwork production, installation, formwork protection, dismantling, etc. for this project (including later ring beam topping and structural column formwork) .
(2) The mechanical equipment such as tie rods, step by step, wall pipes, electric saws, disc saws, wood planers, nails, iron wires, etc. required for the template making and installation of this project shall be provided by Party B Solve it yourself.
(3) Party B is responsible for the unloading and unloading of raw materials such as formwork, wood, and racking materials, including transportation within the crane range. Party B will also be subsidized with 5,000 yuan for the loading and unloading and transfer fees.
(4) Apply release agent to the formwork during the construction process.
(5) Cooperation with other types of work during the construction process, safe and civilized construction, cleaning of floors and construction sites, stacking of materials, after the formwork team has completed the construction and dismantling, the construction site should reach the level of the masonry team, floor The ground team and plastering team can directly enter the site to carry out the next construction process without cleaning.
(6) During the concrete pouring process, if quality problems arise due to formwork explosion or mold expansion due to formwork support, Party B shall promptly carry out concrete tapping and slag cleaning due to its own reasons.
(7) Party B is responsible for purchasing the inner concrete supports required for formwork support.
5. Construction period requirements
Party B shall complete the work on time according to Party A’s monthly and weekly construction schedule and the construction tasks assigned by the construction workers. If Party B fails to complete the work within the time limit, Party A shall have the right to Party B will be punished according to the severity of the violation.
VI. Quality standards and acceptance requirements
(1) Project quality requirements standards: This project is a qualified project and strives for excellence. Party B must carefully organize the construction in accordance with the operation instructions of the project department and relevant technical and quality disclosure materials, and meet the joint acceptance assessment standards of the construction, design, supervision and quality supervision departments.
(2) The basic requirements for the quality of Party B’s supporting formwork are: ensuring the correct cross-sectional dimensions; sufficient strength, stiffness and stability, and no leakage of slurry.
(3) As for the quality of the finished product after the mold is removed, its verticality and flatness must meet the acceptance standards. If any problems such as mold blasting, distortion, and uneven unevenness are found, Party B will be responsible for trimming and smoothing them. Party B shall be responsible for the quality of the contracted projects to Party A. If any problems arise, they must comply with Party A's rectification opinions and make rectifications within a time limit; if rectification is overdue, Party A has the right to punish Party B. Party B shall bear the losses caused thereby.
(4) After Party B completes each construction part or process, it must undergo careful self-inspection and mutual inspection before submitting it to Party A for verification.
(5) Set up the support frames required for formwork construction in accordance with the "Construction Safety Inspection Standard (JGJ59-99)" and the "Construction Organization Design" and "Formwork Frame Construction Plan" compiled by the project department .
VII. Material quotas
Party A imposes material quotas on the projects contracted by Party B. Party B must carefully organize the production and installation of templates. It is strictly prohibited to use long materials for short use and large materials for small use. If the formwork materials are dismantled without the construction worker's instructions and consent, Party B shall compensate Party A for more than twice the price of the dismembered materials.
8. Formwork labor contracting unit price and pricing method
The formwork labor fee for this project is calculated based on the contact area of ??the formwork. The unit price for the non-standard layer and standard layer above the ground beam is 18 yuan. /㎡, which belongs to the sporadic technical employment provided by Party A, is calculated at 200.00 yuan per working day, and the handyman is calculated at 80 yuan/working day. The above unit price includes: labor fee, downtime fee, unforeseen fee, management fee, rush fee, risk fee, profit, etc., as well as other auxiliary work content required to complete the project.
9. Payment method
(1) Party A shall calculate the payment according to the nodes required for each unit of project. After Party B completes the capping of the main building, he will hand over the completed quantity list to Party A's constructor for approval. Party A will pay Party B the first labor payment of 90% of the completed quantity within 10 working days, and pay 10% after the plastering is completed (demolition, demolition, Transshipment, stacking and deducting marking fees).
(2) After Party B enters the site, Party A will pay Party B labor and other expenses per person per month based on the number of people employed by Party B. Party A will pay Party B 2,000 yuan per person per month
Use (if there is a canteen, you can borrow a meal ticket from the canteen service department).
(3) Party A and the company’s violation fines and borrowed meal tickets from Party B shall be deducted from Party B’s actual labor service fee each time.
(4) Each time Party B receives progress payment, he shall prepare a salary settlement plan in duplicate for each team member. The plan must include the settlement amount of each person and the signature of the team member entrusted to receive the payment. and submit a copy to Party A’s financial department.
(5) The project labor payment paid by Party A to Party B includes labor protection fees, social security fees and insurance premiums for Party B and required personnel, basic pension insurance, medical insurance, etc.
10. Delivery and Return of the Security Deposit
After Party B understands Party A’s project progress, quality, safe and civilized construction and related systems, Party B is willing to hand over a performance bond of 5,000 yuan to Party A. . After the ?,000 concrete pouring is completed, Party A will return the deposit to Party B in one go, without interest.
11. Responsibilities and obligations of Party A
(1) Provide Party A with construction drawings, formwork reproduction drawings, required formwork materials and working surfaces with construction conditions .
(2) Explain to Party B the operating procedures, quality standards, quality requirements, production safety and civilized construction, etc.
(3) Supervise, inspect and accept Party B’s construction quality, progress, safety, civility and sanitation, and completion of work at the site.
(4) According to the provisions of the contract, pay Party B the service fee that meets the payment conditions. 12. Responsibilities and obligations of Party B
(1) After signing this contract, the employment contract and safety responsibility letter shall be signed with its members in a timely manner and submitted to Party A for record.
(2) Strictly abide by Party A’s various rules and regulations, safe operating procedures, civilized construction and comprehensive management regulations.
(3) Special personnel should be assigned to lay out lines and manage on-site construction, and accept the management, guidance and inspection of construction workers appointed by the labor service company. The regulations for all operators to hold certificates for work must be implemented, and part-time safety personnel must be established. , quality and comprehensive management personnel, adhere to pre-work disclosure, in-work supervision and post-work acceptance, and keep records on the day.
All safety facilities, machinery and electrical appliances on the construction site should be inspected before use before work. Construction is not allowed if safety is not guaranteed, and illegal command and illegal operations are prohibited.
(4) Prevent employees from using electric cooking appliances to cook, cook, boil water and heat in dormitories. Once discovered, Party A has the right to punish Party B accordingly. At the same time, Party B shall bear all responsibilities and expenses for the accident caused.
(5) Obey the supervision and inspection of on-site construction workers, quality inspectors, and safety officers, accept rectification opinions, complete rectifications within a time limit, and ensure construction quality.
(6) Responsible for protecting the completion and correct position of each fried noodle embedded pipeline and reserved holes, and shall not block or move them arbitrarily.
(7) Clean up materials after construction at the construction site every day, clean the environment inside and outside the dormitory, and ensure that the construction site is civilized and tidy and the living area is clean and hygienic.
(8) Party B and its affiliated members shall not bring non-site personnel into Party A’s construction site or living area. If found, Party A will punish Party B in accordance with relevant regulations. If an accident occurs Party B is responsible for the losses.
13. Liability for breach of contract
(1) Party B is in breach of contract if any of the following circumstances occurs:
1. Party B’s contractor often leaves his or her job without permission , or there is a serious shortage of construction personnel, and the construction tasks are repeatedly unable to be completed as scheduled and the overall construction progress should be reported to Party A;
2. Party B refuses to make rectifications within the time specified by Party A, and it is invalid after repeated urging;
2. p>
3. Party B’s poor construction quality has resulted in material waste, delayed progress and damage to Party A’s reputation;
4. Party B gives up the contract midway or subcontracts the project to a third party;
5. Party B gathers people to cause trouble, raises wages, demands for labor fees, and disrupts Party A’s normal working order. For Party B's breach of contract, Party A may fine Party B, demand compensation for losses, terminate the contract and other penalties.
(2) If one of the following situations occurs, Party A shall compensate Party B for losses:
1. Due to errors in Party A’s construction instructions or design changes, Party B is required to carry out inspections on the completed project. If the work is reworked, Party A shall compensate Party B for the actual losses caused by the rework;
2. If Party A defaults on Party B’s construction wages for more than one year without justifiable reasons, Party A shall pay Party B the bank interest rate for the same period. Pay interest to Party B on the salary arrears.
14. Safety, Public Security and Fire Prevention Management
(1) For all Party B personnel working in Party A’s unit, the person in charge of Party B will provide team personnel to Party A after entering the site. situation, create a roster and hand it over to Party A as required. Party B must publicize and educate its personnel on abiding by laws and regulations and complying with the safety, public security, and fire prevention management systems of Party A's unit.
(2) Party B is responsible for investigating and handling any internal security disputes and accidents involving Party B’s personnel. Party A's security department will handle and punish Party A's financial personnel who take or steal privately. If the equipment received or borrowed from Party A is lost, the original cost of the loss will be compensated.
(3) Party A has the right to conduct fire prevention inspections, supervise and investigate fire prevention violations of Party B. If Party B’s personnel cause fires or fires due to violations, in addition to investigating and punishing the responsible personnel in accordance with the law, they must also bear the consequences of the fire. Party B will be punished for all losses. For general fire accidents, the fine is 200.00 yuan, and for major fire accidents, the fine is 200.00-500.00 yuan.
(4) Party B shall not stop work or cause trouble for any reason, otherwise all construction period losses and economic losses caused shall be borne by Party B and a penalty of RMB 1,000.00 per day will be imposed. Fighting, disobedience to the arrangements of Party A and the company's on-site management personnel, etc. are not allowed to occur. Once the above phenomena occur, Party A will fine Party B 50.00-500.00 yuan depending on the severity of the case. If the case is serious, it will be dealt with by the public security organs, and Party A Party has the right to refuse to pay project labor fees.
(5) During the construction process, Party B must take all safety precautions and obey the safety instructions of Party A’s management personnel. Party A will inspect Party B’s safety precautions from time to time, and take appropriate measures if the precautions are not in place. Warnings, orders for rectification, and even financial penalties will be given depending on the circumstances. If a safety accident occurs within 5,000.00 yuan, Party B shall be responsible for it. If a safety accident occurs above 5,000.00 yuan, Party A shall be responsible for 80% of the cost, and Party B shall be responsible for the remaining 20% ??of the cost.
15. Others
(1) After the signing of this contract, if the project is suspended or postponed due to policy changes or the following reasons that are unable to protect both the owner and Party A, it is a contract. If it cannot continue to perform, Party B shall properly protect and hand over the completed project; if it is necessary to continue the construction to a safe location, Party B shall follow Party A's instructions to construct the project to a safe location, and remove its own tools and personnel as required by Party A. construction site. However, Party A must provide conditions for Party B to withdraw and pay Project B for the completed work as stipulated in the contract. If Party B withdraws from the construction without any reason and Party A refuses to pay for the completed part of the project, Party B shall be responsible for any losses incurred. If Party A's construction progress or site is seriously affected, Party B must bear financial responsibility.
(2) If Party B fails to meet the quality and construction period requirements due to the quality of workers or other reasons, or commits illegal or disciplinary violations, Party A has the right to propose replacement, and Party B shall bear all losses and responsibilities.
16. This contract was signed after careful review by Party A and Party B and has the same legal effect. This contract is made in two copies, with Party A and Party B each holding one copy. It will take effect from the date when both parties sign and the performance bond is executed. The contract will automatically expire after the performance of the contract is completed and the balance is paid. For other matters not covered, the two parties shall sign a supplementary contract as an attachment to this contract.
Seventeen. Special agreement
One floor below the conversion floor will be completed in 7 days, the conversion floor will be completed in 15 days, and the standard floor will be completed in 3 days. The quality and quantity will be guaranteed. When the construction period of this project reaches progress, Party A will be severely punished.
Party A: Party B: Representative: Representative: Telephone: Telephone:
Year, Month, Day Template Project Labor Service Contract Sample 2
Contracting party (full name): (Referred to as Party A)
Contractor (full name): Zhang Zhiping (see the contract attachment for details) (referred to as Party B)
According to the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China", "Construction Project Quality Management Regulations of the People's Republic of China" and other relevant laws and regulations, following the principles of voluntariness and good faith, and taking into account the specific conditions of this project, the two parties will discuss the construction The project labor cooperation matters were reached through consensus and the contract was signed, and both parties agreed to abide by it and perform it.
1. Project Overview
Project Name: Concrete Excavation Project for Villa A20-22 of the Headquarters Economic Park
2. Contracting Content and Scope
2.1 Party A is responsible for providing the connection point for on-site construction water and electricity. Party B must connect construction water and electricity from this point. Otherwise, Party B shall bear full responsibility for all losses caused. (Water and electricity bills shall be borne by Party B and paid to the general contractor).
2.2 Complete all chiseling projects designated by Party A.
3. Quality standards
3.1 The quality standards of this project are: Party A’s acceptance is sufficient.