Purchase and sales contract agreement format

Purchase and sales contract 2021 agreement format template

Purchase and sale contract 2021 agreement format template, as the legal awareness of our country’s citizens becomes stronger and stronger, more citizens will choose to use legal methods Weapons are used to protect oneself, and contracts, as legally binding documents, have become a common document in daily life. The following is a sample agreement format for the purchase and sale contract 2021. Format of purchase and sale contract agreement 1

Party A (demand party):

Party B (supplier):

Both parties shall We have reached an agreement on the purchase and sale of lamps on the basis of equality and voluntariness. In accordance with the relevant provisions of the "Contract Law of the People's Republic of China", we have signed the following contract terms for mutual abide by:

1. The model and unit price of the lamp (see attached table for details)

2. The total price of this contract is in RMB: approximately one hundred and sixty thousand yuan (¥: 16,000 yuan). If the final settlement amount exceeds Or reduce the quantity agreed in the contract, then all increases or decreases will be settled based on the actual increase or decrease in quantity and the unit price agreed in the contract.

3. Product quality requirements and technical standards: Produced in accordance with GB7000, 1-1996 and the plan (drawings) confirmed by both parties A and B, as well as samples designed and confirmed by Party A's signature. The product warranty period is three years.

IV. Packaging standards and requirements: Pack according to Party B’s product factory packaging standards. 5. Delivery deadline: the end of November 2015.

6. Delivery location and method: The location is Party A’s construction site and the method is landing delivery. 7. Transportation methods, costs and insurance costs: Party B is responsible for the costs. 8. Payment method:

1. After the contract is signed, Party A shall pay 50% of the total contract amount within three days as the contract advance payment;

2. After all the goods of Party B are delivered On-site, after the installation and acceptance by both parties are correct, 40% of the total contract amount will be paid.

3. After the completion and acceptance of the project, both parties A and B shall make settlement within one month and pay 10% of the total contract amount.

9. Installation and acceptance:

1. If Party A requires Party B to provide installation services.

2. Party B will organize Party A to inspect and accept the goods when they arrive at the construction site. If there are quality problems or the products supplied do not meet the design requirements, Party B will be responsible for free replacement and bear all losses caused thereby.

10. Liability for breach of contract:

1. If Party A fails to pay as stipulated in Article 8 of the contract, it is a breach of contract. For each day of delay in payment, Party A shall pay the total contract amount. 1 Liquidated damages shall be paid to Party B;

2. If Party B fails to deliver goods as stipulated in Article 5 of the contract, it shall be a breach of contract by Party B. For each day of delay in delivery, 1‰ of the total contract amount shall be paid to Party A as liquidated damages. .

11. Methods for resolving contract disputes:

All disputes related to this contract shall be resolved through negotiation between Party A and Party B on the basis of the principle of mutual trust. If the negotiation cannot be resolved, they will be prosecuted in accordance with the law. The case shall be settled in the People's Court.

12. Other agreed matters:

1. The schedule of this contract is an integral part of the contract. If there are any matters not covered, the two parties will sign a supplementary agreement separately;

2. This contract is made in four copies, with Party A and Party B each holding two copies. It will take effect upon signature by representatives of both parties.

Party A: Party B:

Date: Date: Purchase and Sales Contract Agreement Format 2

Supplier (supplier): ______________ Contract number: ____

Demander (purchasing unit): ______________

Signing time: ____________ Signing location: _________

In order to enhance the sense of responsibility of both supply and demand and improve the economy Benefits, and clarify the responsibilities of both supply and demand parties. In accordance with the provisions of the "Contract Law of the People's Republic of China" and other relevant laws and regulations, the supply and demand parties adhere to the principles of equality, voluntariness, mutual reciprocity and mutual benefit, and after full consultation between the two parties, this Agreement is specially entered into. This contract is for *** to abide by.

Article 1, product name, specifications, quantity, amount:

Note: All the above unit prices are excluding tax, and the quantities are based on the actual supply of the project. The quantity of goods is the basis for settlement.

Article 2. Quality standards and construction requirements:

1. The technical standards of products shall be implemented in accordance with national approved standards. Product quality with special requirements shall comply with the supplier's special regulations or as otherwise agreed in the contract.

2. If the supplier’s product quality does not meet national standards, the supplier will be responsible for the resulting losses.

Article 3. Product packaging requirements: carton packaging

Article 4. Acceptance methods and objections:

1. The demander receives the supplier’s The goods are inspected on the spot.

2. If there is any objection, the purchaser shall notify the supplier in writing within the same day after receiving the goods and properly keep the goods. The supplier shall send relevant quality inspection personnel to review and confirm before handling.

3. If the buyer fails to raise an objection within the prescribed time limit, the delivered product shall be deemed to be in compliance with the contract.

4. The buyer shall not raise any objection if the product is damaged due to improper use, storage or maintenance.

Article 5: The contract’s delivery, transportation method, transportation costs, delivery location, designated consignee and contact number:

1. Transporter loading and unloading method: __________

p>

2. Supply in batches: The first batch of supply shall be delivered to the construction site before __month____, year ___, and subsequent supply shall be supplied in batches according to the written plan of the demander.

3. Delivery location: ____________________

4. The buyer’s designated consignee and contact number: Consignee___, phone number______ If the consignee changes, The demander shall promptly notify the supplier in writing.

Article 6. Settlement method and deadline:

1. After signing this contract, the demander shall first pay an advance payment of 30% of the total price of the supplier's materials, the amount is: ________ ; The contract begins to calculate the first batch of supply cycle from the date when the supplier receives the advance payment from the demander. After each batch of materials supplied by the supplier is delivered to the construction site, the demander shall pay 97% of the total price of the materials supplied. The full payment shall be paid after the materials are laid.

2. Since the materials provided are customized products, once the products are delivered to the construction site, if there are no quality problems, the supplier is not responsible for returns or exchanges.

Article 7. Liability for breach of contract by both parties:

1. If the supplier fails to deliver according to the supply plan confirmed by both parties, the demander has the right to pursue the supplier's liability. Liability for breach of contract: for each day of delayed delivery, the supplier shall pay 0.5% of the total price of the delayed delivery to the demander as liquidated damages.

2. If the demander fails to pay the price in time as agreed, the supplier has the right to stop supplying the goods. If the delivery is delayed and losses are caused, the responsibility does not lie with the supplier. If the demander pays overdue , for every day of delay in payment, the demander shall pay 0.5% of the total price of the payment to the supplier as liquidated damages.

Article 8. Ways to resolve contract disputes: It can be resolved through negotiation. If negotiation fails, it will be arbitrated by the Changsha Arbitration Institution.

Article 9. This contract is made in two copies. Each party needs to hold one copy. It has the same legal effect. It will take effect immediately after being signed and sealed by both parties until the payment is due.

Article 10. Other agreed matters: ____

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month_____________year____month____date purchase and sale contract agreement format 3

Party A (supplier): _______________

Party B (demander): _______________

Party A and Party B shall act in accordance with the Contract Law of the People's Republic of China and relevant laws and regulations. According to the provisions of laws and regulations, after friendly negotiation, the following terms have been reached for both parties to abide by:

1. Ordering details

Party B purchases the following regular products from Party A:

p>

1. The above quantities and sizes are calculated based on the actual order delivery number

2. The above prices do not include tax,

3. Party A is responsible for transportation ( Only long-distance from _______ to _______)

2. Quality inspection

1. Quality standards: Acceptance according to relevant national regulations

2. Size requirements: Based on the size ordered by Party B.

3. Packaging requirements: The packaging of the goods must meet the transportation and handling requirements of fragile items and comply with Party B’s standard packaging. The packaging fee is included in the product quotation.

3. Payment Method

After signing this contract, Party B shall pay the total contract amount in one lump sum: _______ yuan as a deposit. Party A will begin placing orders after receiving Party B's deposit. Production, production will be completed within _______ days. Party B must pay the balance of _______ yuan within the _______ day. The goods will be shipped from _______ and arrive at _______ within _______ days.

IV. Delivery method, delivery time, delivery location

1. Delivery method: payment first and then delivery, delivered to the _______ construction site designated by Party B in one go

2. Delivery time: The goods will arrive within _______ days from the date of receipt of the deposit.

3. Delivery location: ____________________________.

5. Product Reception and Inspection

After the goods arrive at the designated location, the supplier shall submit the quantity, model and inspection application to the demander in writing. The demander shall There is a designated person (with a power of attorney) who is responsible for counting, inspecting the goods, and signing for confirmation. The inspection must comply with relevant national standards (acceptance based on the model model standards determined by the customer.

)

6. Time and method for raising objections to products

If Party B finds that the quantity, variety, model, and quality of the product on the day of receipt are inconsistent with national standards and those that have been determined If the samples do not match, written objections should be submitted to Party A within _______ days, and Party A will give a written explanation to Party B's objections within _______ working days. If the product does not meet national standards and the determined sample requirements , Party A will replace them free of charge. If Party B does not raise any written objection within _______ days after completion, Party B has confirmed that all installed products are qualified!

7. Liability for breach of contract

1. If Party A fails to deliver the goods within the time stipulated in the contract, Party A shall pay Party B a liquidated damages of three ten thousandths per day for the overdue payment, and shall bear the resulting losses;

2. Party B fails to timely If the receipt of the goods causes delay in delivery of the goods, Party B shall be responsible for all overdue losses;

3. If Party B fails to pay in time as specified in the contract, Party B shall pay Party A 10,000 yuan per day for the overdue portion of the payment. Three-thirds of the liquidated damages and shall bear the losses caused;

8. Other conditions

1. Contract change: Neither Party A nor Party B has the right to unilaterally change the content of the contract. If necessary, Changes should be made after negotiation between both parties.

2. This contract will come into effect upon signature by both parties. All mediation, litigation, and joint liability arising from this agreement shall be subject to arbitration by the Zhongshan District Court.

3. For unfinished matters, both parties can supplement the matter in the form of a supplementary agreement. The supplementary agreement has the same legal effect as this contract.

4. This contract is made in two copies. Party A and Party B each hold one copy. It has the same legal validity and takes effect from the date of signature.