1. Draw as-built drawings and overlapping drawings according to the requirements of file management.
2. Draw the negotiation on the map.
3. Seal to complete this unit.
Step 4 sign the stamp
How to draw hydropower completion map
1. Draw as-built drawings and overlapping drawings according to the requirements of file management.
2. Draw the negotiation on the map.
3. Seal to complete this unit.
Step 4 sign the stamp
How to draw hydropower completion drawing is how to draw concrete CAD.
If the change of drawings exceeds 30%, the as-built drawings need to be re-drawn and stamped by the design institute; If it is not more than 30%, it can be modified on the original blueprint, and the reasons for modification need to be marked every time, such as several items according to * * * * and several items according to * * contact list * *.
How to draw the completion map of decoration hydropower
According to the actual layout of the line, it is still drawn on the original structural drawing or floor plan. Mark the distance between each pipe and the wall, mark the special circuit lines, and mark the cold and hot water pipes (or use different colors to represent cold and hot water).
After the drawings are completed, they shall be signed by the designer, the owner and the plumber.
In duplicate, one for the engineering department of the decoration company and one for the owner.
The road map of the water plant should be drawn according to the actual situation after the completion of the hydropower project and before the bricklayer enters the site.
Question: How to draw the water supply completion drawing?
According to the actual drawings, the drawing method is specified in the drawings.
If there are no major changes, the design drawings are directly as-built drawings. And modify it according to the actual changes.
How to draw the completion drawing of hydropower installation? Are there any drawings of specific cases?
Draw the blueprint of as-built drawing, seal it by the owner, and check and seal the drawings, that is, the construction drawings. If there are changes in the drawings, that is to say, the actual construction is different from the drawings. For example, if the line is changed, it must be drawn according to the actual line of construction. The original lines should be crossed, and the numbers of the change form and visa form should be attached next to them, or which one is the blue prints.the design. All changes should be marked on the drawings, and finally stamped with the completion stamp and project.
The drawing method of as-built drawing and hydropower drawing is urgent!
Improve the original construction drawing, 1, negotiate design changes, and review the drawings; 2. Signature of drawings; 3, visa recipients, of course, mainly communicate with the owners first to understand their settlement methods, drawing requirements and drawing methods.
How to draw the electrical completion drawing?
According to the installation record, contact list and design modification notice of on-site construction, the modified part is modified on the basis of the original drawing, and the drawing frame and drawing sign required by the completion acceptance are used.
When the number of revised drawings is small (it seems less than 30%), the design modification notice is directly attached (to undertake the finishing of the as-built drawing production unit). Drawings that have been modified more must be redrawn (the design unit will provide drawings again).
How to draw the fire control completion drawing, water and electricity completion drawing and decoration completion drawing?
The rise and fall of fire hose can be shown on the plane, and its symbol is a circle, which can be seen according to the direction of the pipeline! You can also compare beams with other structures and analyze specific problems!
Who will draw the water and electricity completion map and find it urgently?
Yes, I will. If the quantity is not too much, I can help you with CAD after work, but I have to pay you.