I am a supervision engineer and the construction unit is a partner. Another project colleague of mine impersonated my signature and seal on the unqualified documents.
The director is required to void the documents, because Article 67 of the Regulations on Quality Management of Construction Projects stipulates that if a project supervision unit commits one of the following acts, it shall be ordered to make corrections, and a fine of not less than 500,000 yuan but not more than 6,543.8+0,000 yuan shall be imposed, the qualification level shall be lowered or the qualification certificate shall be revoked; If there is illegal income, it shall be confiscated; If losses are caused, they shall be jointly and severally liable for compensation: (1) colluding with the construction unit or the construction unit to practise fraud and reduce the quality of the project; (two) unqualified construction projects, building materials, building components and equipment in accordance with the qualified signature.