Sample pavement engineering contract template (selected 5 articles)
In today's society, people pay more and more attention to contracts, and the legal effect of contracts is increasing day by day. It also reduces and prevents disputes. important measures. I believe many friends are very distressed about contract drafting. Below is a pavement engineering contract template (selected 5 articles) that I have compiled for you. It is for reference only. You are welcome to read it.
Pavement Engineering Contract Sample 1
Party A:
Party B:
In accordance with the "Contract Law of the People's Republic of China" , "Construction Law of the People's Republic of China" and other relevant laws and regulations, Party A and Party B signed this contract through equal consultation on matters related to xx road hardening, and both parties agree to abide by it.
1. Construction Period
Construction start date: xx month xx day xx year
Completion date: xx month xx day xxx year
2 , Construction content
Party A is responsible for the technology, quality, progress, project quantity, and document construction management of the project.
Party B is responsible for the foundation, concrete floor production and on-site construction, related work management (fully responsible for construction safety management) in the project, as well as the floor materials and some auxiliary materials purchased with Party A’s consent.
3. Project Cost
After negotiation between Party A and Party B, the construction organization will be implemented according to the budget approved by the finance department. The road surface (road bed shaping 15cm thick 4 cement stabilized gravel, 20cm thick 5‰ cement Stable gravel, 15cm thick C20 concrete pavement) is calculated at 92 yuan/m2; fence (2.1 meters high Ф25 galvanized round steel railing, base is 1 meter long 63 channel steel) is calculated at 380 yuan/meter, drainage ditch (width 30cm Depth 50cm, 24 walls) 199 yuan/meter, the settlement will be direct fee plus tax (based on the approval standards) without any other fees.
4. Work volume visa
Concealed projects such as slag removal, soil replacement, foundation treatment, house demolition, septic tank surface blasting and reconstruction must be subject to on-site visa. For concealed projects, Party B must notify Party A's construction personnel in a timely manner, and Party A's construction workers, technicians, and estimators must collect the work on site before entering the next process. Otherwise, Party A will not approve the project quantity, and Party B must submit it to Party A's representative within two days. Party A’s representative will review the project quantity visa form within two days, apply for the visa, and return the visa form as required. All visas are issued in accordance with the Hunan Construction Price [2005] 326 document.
5. Progress Requirements
Party A is responsible for the progress management of the project. Party B must strictly organize the construction according to the construction period agreed in the contract. Due to Party B's reasons, the project is not completed according to the agreed schedule. For each day of delay, RMB xxx yuan will be deducted and corresponding responsibilities and losses will be borne.
VI. Quality Requirements
1. Party B must carefully construct according to the construction drawings and Party A’s requirements in accordance with the national construction technical operating regulations, and the quality shall be delivered in strict accordance with the national acceptance specifications; if the quality is not reached, Party B is required to be responsible for all losses caused by rework, and will deduct RMB xxxx yuan for each occurrence (time) and bear the corresponding responsibilities and losses.
2. From the date when the project is completed and accepted, the warranty period shall be borne according to Article 3 below. When settling the payment, Party A’s finance will withhold xx of the total price as a deposit, and Party B shall bear the part incurred during the warranty period. For quality problems, Party B must carry out repairs within two days after receiving the notice from Party A. Otherwise, Party A can send people to deal with it; and the cost will be deducted from the warranty deposit, which will be settled after the warranty expires.
3. Warranty period
(1) One year for civil engineering projects (the ground foundation and main works are the reasonable service life of the project specified in the design);
(2) The warranty period is calculated from the date of project completion acceptance and signature.
4. Party A shall claim compensation from Party B for losses caused by non-compliance of quality requirements with Party B in accordance with relevant regulations.
7. Safety
Sign a safety and environmental protection management agreement, and Party B will be responsible for all safety (accidents) that occur during the construction process.
8. Settlement method
There is no advance payment in this contract. RMB 50,000 will be paid after the road bed shaping and gravel base layer are completed, RMB 100,000 will be paid after the installation of fences and drainage ditches, RMB 50,000 will be paid after the concrete pavement is completed, and the total project payment xx will be paid within xx working days after acceptance and qualified audit settlement, and the remaining xx After the warranty period, it must be paid in one lump sum. If Party A fails to pay on time, interest will be charged at bank interest rates.
9. Others
Party B shall be responsible for the expenses arising from the conflicts between workers and peasants.
10. This agreement is made in four copies. Party A and Party B each hold two copies. They will take effect after being signed and sealed by both parties.
Party A:
Party B:
Signing time: Pavement Engineering Contract Sample 2
Contractor: _________________________ (hereinafter referred to as Party A )
Contractor: ____________________ (hereinafter referred to as Party B)
After negotiation between Party A and Party B, they reached an agreement on the construction matters of this project and entered into this contract, which *** agrees to abide by.
1. Project
1. Project name: _______________
2. Project location: _______________
3. Contract scope: ____________________
4. Contracting method: including work and materials, quality, construction period, safety, civilized construction and acceptance.
5. Contract price: The total contract price is _______ million yuan.
2. Technical requirements
1. The pavement is ______cm thick C30 cement concrete pavement and ____ meters wide.
2. 18cm thick 3:7 lime soil cushion.
3. Construction and quality requirements
1. Roadbed treatment
On the basis of the original roadbed, the uneven road sections will be leveled using bulldozers or loaders. , and remove weeds from the surface, and then compact them with a road roller.
2. Strictly control the quality of pavement materials, and the cushion must be compacted, otherwise it will be reworked.
IV. Rights and obligations of both parties
1. The main tasks of Party A:
Responsible for the three connections and one leveling of the site;
2. Party B Main tasks:
Responsible for construction safety work within the construction scope of this project. Party B shall strictly implement safety protection measures in accordance with relevant regulations, bear the responsibility for accidents caused by improper safety measures and the resulting expenses; and take good care of on-site equipment and materials.
5. Payment of the project price
The completion of the project will cost 90% of the total project cost. The project quality deposit is 10% of the total cost, and the warranty period is one year. The warranty period is calculated from the date of completion and acceptance. After the expiration, the warranty deposit will be paid in one go.
6. Safe and civilized construction
Party B shall carefully organize, civilize and safe construction in accordance with the construction site management regulations of the general contractor unit and the unified management system of Party A; the contractor, Party B has the right to stop any behavior that violates the on-site management system, up to and including fines and termination of the contract.
Party B shall be solely responsible for all safety accidents and quality accidents that occur during the construction process and bear corresponding economic responsibilities, legal liabilities and all corresponding economic compensation.
Party A (signature and seal):
Party B (signature and seal):
Temporary Pavement Engineering Contract Sample 3
Contract issuance Party: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In order to ensure the smooth completion of the project, after consultation between Party A and Party B, in the spirit of equality, voluntariness, fairness and harmony Based on the principle of good faith, we reached consensus on the construction matters of this project and clarified the rights and obligations of both parties. This contract was concluded after negotiation and will be abided by by both parties.
1. Project
1. Project name: Village road hardening construction project
2. Project location:
3. Contract scope: 1,393 meters of cement hardened pavement.
4. Contracting method: including work and materials, quality, construction period, safety, civilized construction and acceptance.
5. Contract price: The total contract price is 250,000 yuan, and the unit cost is 62 yuan per square meter (the actual measurement after completion shall prevail).
2. Technical requirements
1. The road surface is 15 cm thick C25 cement concrete pavement, 3 meters wide, and the width of the shoulders on both sides is 75 cm each.
2. The smoothness of the road surface after construction must meet the superior acceptance standards, and rainwater drainage must be ensured.
3. On the basis of the original roadbed, the uneven road sections should be mechanically leveled. The low-lying sections must be cushioned with sand and gravel and compacted.
4. Strictly control the quality of pavement materials, and the roadbed must be compacted, otherwise it will be reworked.
3. Rights and obligations of both parties:
1. Rights and obligations of Party A
Two supervisory and management personnel appointed by Party A, names:
Responsibilities:
Supervise and control the quality progress of the construction phase and the quality of on-site projects, and participate in related work in the acceptance and warranty phases.
2. Party A’s main tasks
Responsible for the preparation of the site and the provision of water and power supplies.
Responsible for clearing obstacles at the construction site and mediating possible disputes to ensure the smooth progress of the construction.
3. Rights and obligations of the contractor
Name of the project leader:
The project leader represents Party B and is fully responsible to Party A for the project.
4. Party B’s main work
Responsible for construction safety work within the construction scope. Party B shall strictly implement safety protection measures in accordance with relevant regulations. Bear the responsibility for accidents caused by improper safety measures and the resulting expenses, take good care of on-site equipment and materials, and keep on-site construction records. Cooperate with Party A and the supervisory unit for quality inspection. Party B shall be solely responsible for all safety accidents and quality accidents that occur during the construction process. And bear corresponding economic responsibilities, legal liabilities and all financial compensation.
IV. Payment of project price
All project funds shall be advanced by Party B by itself. If the project is accepted and accepted, payment will be made after the allocation from superiors is received, and it will be paid off before the end of the year at the latest. The project quality deposit is 5% of the total cost, the warranty period is one year, and it will be paid in full once a year after the warranty expires.
5. Project Completion Acceptance
Under the premise that the project is ready for acceptance, Party B will actively cooperate with Party A and relevant units to organize acceptance and require rectification of unqualified items. They must make rectifications as required and bear the rectification costs caused by their own reasons.
6. Project period
The project period is one month.
VII. Liability for breach of contract
1. Party B shall not subcontract the project without the permission of Party A, otherwise Party A has the right to terminate the contract and pursue Party B for the legal liability caused.
2. Party B must complete the project on time, otherwise it will pay liquidated damages of 1,000 yuan/day for each day overdue.
8. The contract comes into effect
Time of conclusion of contract: xx, month xx, year xx
Place of conclusion of contract:
As agreed by both parties to this contract It will take effect after being signed and sealed.
Contractor: (official seal)
Contractor: (official seal) Pavement Engineering Contract Sample 4
Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In order to strengthen the management of the road hardening project in this village, ensure the quality of the project and complete the tasks on schedule, after negotiation between the contract issuing party and the contractor, this construction contract was signed contract.
1. Project name: Village road hardening
2. Project location:
xx Village Committee
3. Project quantity:
Length meters, width meters, thickness meters, calculated based on 10,000 yuan/km. If the roadbed cannot reach the specified width, it will be determined based on the on-site conditions. The funds will be coordinated by Party A and Party B will cooperate. Party A is responsible for raising self-raised funds, and Party B cooperates. The coordination funds requested by Party B from the superior department must be handed over to Party B for use and cannot be used for other purposes.
IV. Project quality requirements:
Strictly follow the "Technical Specifications for Construction of Highway Cement Concrete Road Pavement" and the design and construction drawings. The project quality requires cement, sand and gravel to be 1:2 : 3.5 ratio standard construction, this contract adopts the comparison selection method, the contract appraisal will be implemented by Party B, and Party A will cooperate.
5. Construction period:
From the date of signing this contract, Party B will organize the start of the project until xx, xx, month xx, with a construction period of xx days.
6. Party B is solely responsible for the construction start order issued by the Transportation Bureau.
7. Settlement of project payment:
The contract price of this project is a one-time lump sum of measured investment, and no overspending will be compensated. The project contract cost is RMB (in capital letters) xx yuan, (the small village road hardening construction contract is written in) xx yuan. The final settlement amount will be calculated based on the actual project quantity (subject to the accepted project quantity).
8. Payment method:
The project subsidy funds will be allocated to Party A according to the actual situation of the superior department. After the project is completed and passed the acceptance inspection, it will be allocated to Party B.
9. Responsibilities of Party A and Party B:
(1) Responsibilities of Party A:
1. Responsible for providing all relevant technical information for project construction.
2. During the construction period of Party B, if there is interference or disputes from the public, Party A must deal with it in a timely manner, and Party A will be responsible for the required funds.
3. If Party B does any illegal operations during the construction period, Party A has the right to ask it to make corrections and order it to stop work.
4. Carry out quality control on the specifications and proportion requirements of the main materials of the project.
5. Cooperate with Party B to do construction safety work.
6. Party A is responsible for the coordination of Party B’s construction site and water and electricity use. It shall not affect Party B's installation of machinery and equipment and normal construction water and electricity consumption.
7. After the project is completed, Party A and Party B will conduct a self-inspection of the entire project. Party A and Party B will actively cooperate with the superior department to complete the completion acceptance work.
8. After the completion of the project, Party A is responsible for the coordination of superior departments and self-raised funds. If Party B does not settle the project payment within 30 days, Party B will pay Party B’s capital interest rate and project payment at 3 times the bank interest rate for the same period.
(2) Party B’s responsibilities:
1. All equipment such as mixing station, water, electricity, machinery and tools required by Party B for construction shall be prepared by Party B by itself.
2. If Party B’s quality does not meet the requirements of the terms during construction, Party A has the right to make corrections on the spot or require rework. Under reasonable circumstances, Party B must obey, and Party B will be responsible for any losses caused thereby.
3. Party B shall carry out construction in accordance with the contract, ensure quality, actively accept Party A's supervision, and operate safely.
4. Party B must strengthen safety production management during construction and achieve civilized construction. Party A will not be responsible for various mechanical accidents, traffic accidents, other accidents and various disputes that occur during construction. Party A will not bear any responsibility for any serious injury, death or economic loss caused thereby, and all responsibilities shall be borne and resolved by Party B.
5. Party B shall rectify and improve the defects and quality problems raised during the acceptance of the completed (completed) work as required, and Party B shall bear the cost of rectification caused by its own reasons.
6. During the construction process, if Party A inspects the project that does not meet the design requirements, Party B must take remedial measures in a timely manner, and any rework must be fully reworked.
7. During the construction process, the construction content of the project shall not be adjusted without authorization, and the project volume shall not be increased or decreased without authorization.
8. Actively cooperate with Party A and superior departments to carry out project self-inspection and completion acceptance.
10. Liability for breach of contract:
1. Party B carries out construction work without the permission of Party A’s technical quality inspection personnel. The resulting losses shall be fully borne by Party B, and Party A will not undertake additional projects. Grant funds.
2. If unqualified materials are used in project construction without inspection and acceptance by Party A’s technical personnel, all losses caused shall be borne by Party B, and Party A will not provide additional project subsidy funds.
3. Party B shall bear all costs for remedial or reworked projects that fail to meet the design requirements upon inspection by Party A.
4. Without Party A’s permission, if Party B stops work midway, fails to complete the work on time or fails to pass the inspection after completion, Party A will not settle the project subsidy funds.
5. From the date of signing the contract, both parties A and B must perform their respective responsibilities and be responsible for the signed contract.
6. If Party A breaches the contract, Party A will be responsible for the economic losses caused to Party B.
11. This contract is valid from the date of signature by Party A and Party B until the completion and acceptance of the project.
12. Matters not covered in this contract, or new problems discovered during construction, shall be resolved through negotiation between both parties.
13. This contract is made in triplicate. Party A and Party B shall each hold one copy and keep one copy. This contract takes effect from the date of signature.
Party A:
Party B:
Date: Pavement Engineering Contract Sample 5
Party A:
Party B:
In 20xx, our village was designated as a demonstration village for new rural construction by the county government. In order to adapt to the needs of new rural construction, change the traffic status of our village, improve various infrastructures, promote the comprehensive development of various undertakings in the village, and allow the broad masses of people to get more benefits in the construction of new rural areas. After negotiation between the two parties, the cement pavement of the natural village was constructed and this contract was concluded.
1. Party A entrusts Party B to build a cement pavement project:
For natural village cement roads, the length, width, and square of the pavement area shall be subject to actual measurements. The project will be settled upon acceptance. .
2. Contract content and quality requirements:
The project contracted by Party B includes road preparation, 20 cm of stone cushion, 18 cm of cement thickness, and the concrete shall comply with C25 labeling requirements. Slope protection and ditches are required. After collective research and verification by the village committee, Party B will construct and settle the project according to the plan designated by the village committee. Party A shall supervise on-site quality during construction. If Party A discovers quality problems during construction, Party B shall unconditionally obey Party A's supervision and make corrections in a timely manner. After the project is completed, it will be subject to acceptance by the New Rural Construction Leading Group.
3. Contract duration:
As agreed by Party A and Party B, this project must be completed before September 15, 20xx. If the work is not completed within the due date, Party B will be responsible for any consequences that may affect acceptance.
IV. Contract price, contracting and payment methods:
Party A and Party B have agreed upon a price of 95.5 yuan per square meter for this project. Party B contracts the work and materials (materials, labor wages, water sources, power supplies, cement maintenance are the responsibility of Party B) and all project funds are advanced by Party B.
The funds appropriated by the county's new rural construction acceptance office will be paid to Party B in proportion to the project payment. Party B must provide a tax invoice to receive the project payment, and the tax shall be paid by Party B. Party B's 5,000 yuan deposit will be refunded to Party B after half of the project is completed.
5. Party A requires Party B to construct safely:
It has been agreed by both parties that during construction, Party B must construct safely and civilly. Party A must establish a safety production responsibility system for Party B. Party B must Take full responsibility for safety. Party A should provide guidance and supervision on safety during construction.
6. If there is any increase or decrease in the actual construction, it will be negotiated by Party A and Party B.
This contract is made in triplicate. Party A and Party B each hold one copy, and the other copy shall be submitted to the town government for filing.
Party A:
Party B:
Date: ;