Rural House Building Agreement

In today’s social life, we are all directly or indirectly related to agreements. Signing an agreement is a means to improve economic efficiency. Want to write an agreement but don’t know who to ask? The following are 6 rural house building agreements that I have collected and compiled. They are for reference only. I hope they can help everyone. Rural House Construction Agreement Part 1

Party A: ___________ ID number: ___________

Party B: ___________ ID number: ___________

Party C: ___________ ID number: ___________

Party D: ___________ ID number: ___________

Party E: ___________ ID number: ___________

A. After full consultation, five parties B, C, D and E have reached this agreement on the construction of houses on the rural homesteads of Group 5 of Yingtaizhai Village, Taohe Township, Yingshan County, the original five parties. The specific contents are agreed upon. As follows:

1. House structure and area: bungalow, courtyard form, nine-unit building, each unit has the same area (about 6m × 4m), the details are subject to the drawings.

2. Allocation of property rights: Counting counterclockwise from the right hand after entering the courtyard, the ownership and use rights of the first and second companies belong to ___________,

The ownership of the third and fourth companies The ownership and use rights of the sixth and seventh pages belong to ___________, the ownership and use rights of the sixth and seventh pages belong to ___________,

The ownership and use rights of the eighth and ninth pages belong to ___________, the ownership of the fifth pages belong to Party C, However, the right to use it belongs to the five parties. The ownership and use rights of the middle part of the hospital belong to five parties.

3. Capital contribution allocation: All costs required for demolishing the old house and building the house will be funded by parties A, B, D, and E. Party C will not contribute.

IV. Capital payment method: Before the demolition of the house begins, parties A, B, D, and E each contribute 20,000 yuan. After the foundation is completed, parties A, B, D, and E each contribute __________ _ Ten thousand yuan; after the main body of the house is completed, A, B, D, and E will each contribute another ten thousand yuan. Each investment is centrally managed and used by the party responsible. After all is completed, more will be refunded and less will be compensated according to the actual situation.

5. Liability for breach of contract (to be determined)

For matters not covered in this agreement, all parties should take a positive attitude and resolve them through friendly negotiation.

This agreement is made in eight copies, one copy each for Party A, B, C, D and E, and three copies for the notarized party. It will take effect upon signature by all parties.

Party A:___________Party B:___________Party C:___________Party D:___________Party E:___________Notary Public:___________

___________Year___________Month_ __________ Day Rural House Construction Agreement Part 2

Party A:

ID number:

Address:

Party B: < /p>

ID number:

Residential address:

Party C:

Identity card number

Residential address:

p>

Parties A, B and C have reached the following agreement through friendly consultations on cooperative development:

1. Party A will purchase the land in square meters (hereinafter referred to as "the land") in the name of Party A. House.

The capital contribution ratio of 2:1 is 300,000 yuan, and Party B invests 10,000 yuan to build a house on the land, square meters, *** floors (funding The actual investment of Party B and Party C shall be the account number (account number), which shall be properly kept by Party A and used entirely for the construction of the house.

IV. Before signing this agreement, Party B has Party A will be paid to Party A in March 20xx, and Party C has paid 20,000 yuan to Party A by transfer on March 20xx.

5. The three parties agree to designate Party A as the representative. , responsible for the construction, supervision, purchase of building materials, payment of construction costs, application for construction and other related matters.

6. If the building area needs to be increased or reduced, Party A needs to seek the opinions of both parties B and C. ,

7. After the house is completed, Party A, B, and C agree to own the ownership of the house and related income in shares. The specific shares are: Party A owns 150, and Party B and Party C share the proportion of their capital contribution. (i.e. 2:1) Split ownership.

Party A can sign the distribution, that is, Party A obtains 150 and distributes it to both parties in proportion to their investment.

%, Party B will receive 50% of the total compensation, and 30% will be returned to Party B and Party C. 12. Matters not covered in this agreement shall be borne by Party A, Party B and Party C. The three parties agree to negotiate and sign a supplementary agreement.

13. This agreement is in triplicate, with each party A, B, and C holding one copy, all of which have the same legal effect.

14. This agreement will take effect after being signed by the three parties.

Party A:

Date:

Party B:

Date:

Party C:

Date: Rural House Construction Agreement Part 3

Homeowner (Party A):

Contractor (Party B):

Entrusted by Party A Party B undertakes the construction of a two-story brick-concrete structure residential house. In order to clarify the rights and obligations of both parties during the construction process, the two parties reached the following agreement through negotiation;

1. The main project of the private residence.

2. Construction method: Party A contracts the main body of its residential project to Party B in the form of labor and material contracting.

3. House construction period: The house construction period is 60 days, and the construction date is calculated from the date of signing the contract.

IV. Project price: 320 yuan per square meter.

5. Construction safety requirements and responsibility for quality issues:

1. Party B must take strict safety protection measures in accordance with safe construction specifications and technical requirements, and pay special attention during the construction process Carry out safe construction to prevent all accidents, and bear the responsibility for accidents caused by inadequate or ineffective safety measures and all the resulting expenses.

2. Party B must construct according to quality and quantity according to the construction operating regulations, and is not allowed to cut corners. If there are any project quality problems (such as the main wall not being perpendicular to the horizontal ground, the wall being uneven, cracking; the main column not being perpendicular to the horizontal ground, breaking, exposing the reinforcement; the overhang beam breaking, exposing the reinforcement, etc.), the project will be handled by the relevant department after evaluation. Party B shall bear all losses.

6. Construction delay: Party B shall not delay construction without justifiable reasons. For delays in the completion date due to the following reasons, the construction period can be postponed accordingly upon confirmation by Party A.

1. Work stoppage due to power outage, rain, etc.;

2. Force majeure;

3. Other circumstances where Party A agrees to grant an extension.

VII. Payment method:

1. After Party B completes the foundation, Party A will pay off the cost of the foundation and prepay the project price of RMB 20,000.

2. After the bottom roof is completed, if there are no quality problems, Party A will pay the project price of RMB 20,000.

3. After the top roof pouring is completed, if there are no quality problems, Party A will pay the project price of 10,000 yuan.

4. After the exterior wall painting is completed, if there are no quality problems, Party A will pay the project price of RMB 5,000.

5. After the interior wall painting is completed, if there are no quality problems, Party A will pay the project price of RMB 5,000.

6. After the entire project is completed, Yu Cheng will inspect it during a rainy season next year and if there are no quality problems, a lump sum payment will be made in August.

8. This contract is made in duplicate and will take effect after being signed by Party A and Party B. After it comes into effect, both parties A and B must abide by it and implement it together. Unfinished matters will be resolved through negotiation between the two parties.

Party A (signature): Party B (signature): Rural House Construction Agreement Part 4

Party A: Name, gender, age, ethnicity, phone number

Address: < /p>

Party B: Name, gender, age, ethnic group, phone number

Address:

Party A needs to build a new house because the child is about to get married. Due to the fact that Party A’s original homestead faces the sun, Party A needs to build a new house. It occupies a small part of Party B's public road. Now, after negotiation between Party A and Party B, the following house construction agreement has been reached.

1. Party B agrees that Party A will build a house and occupy Party B’s public road: North meters, South meters, West meters (see the attached diagram for details).

2. Party A agrees to give Party B a one-time compensation of RMB round for the inconvenience caused by occupying the public road.

3. Both parties A and B agree that the ownership of the part of the road that Party A builds and occupies by Party B’s public road will forever belong to Party B, and the right to use it will forever belong to Party A.

4. Party A and Party B agree that Party A’s construction of a house occupies the part of Party B’s public road. After Party A demolishes it by itself, all rights will belong to Party B, but Party B shall not require Party A to demolish the built house.

5. Party A and Party B agree that if Party A builds a house and occupies Party B's public road, in case of government expropriation or planning or other related matters, the house compensation will belong to Party A and the land compensation will belong to Party B.

6. This agreement should be printed in duplicate on a computer, and A and B should each hold one copy. Both have the same effect.

7. If there are any inadequacies in this agreement, Party A and Party B may make additional supplements.

Party A: (Signature and seal)

Party B: (Signature and seal)

Party A: (Signature and seal) XX year, month and day

p>

-----------

Party A: _______________ (name, ID number)

Party B: ___________ ____(name, ID number )

Party A plans to build a house located in ____county__town__village__group, and Party B will be responsible for the construction. In order to clarify the rights and obligations of both parties, both parties voluntarily signed this processing contract after equal negotiation.

1. Rights and obligations of both parties

1. Party A is responsible for providing lime, bricks, cement, sand, water, steel and other building materials. According to the construction progress, Party B shall notify Party A to purchase the required materials ____ days in advance.

⒉ Party B has mature experience in rural housing construction and is responsible for the construction and delivery of housing results. The parties make it clear that there is no employment relationship between the two parties.

⒊Construction machinery such as mixers and vibrators as well as all labor tools such as formwork and scaffolding shall be brought by Party B at its own expense.

⒋The construction period will start on ____month ____year, and the construction period will be ____days. In the event of force majeure such as rain, power outage, earthquake, etc. that affects the construction, the construction period may be postponed.

⒌ Party B shall strengthen safety education for its personnel, strictly manage, abide by national laws and regulations, and conduct safe construction. Safety accidents caused by Party B's personnel's intentionality or negligence shall be the sole responsibility of Party B and have nothing to do with Party A.

⒍The wages and remuneration of Party B’s personnel shall be paid by Party B and has nothing to do with Party A.

2. Quality Requirements

1. Party B shall adhere to the principle of quality and quantity, construct according to the drawings, and strengthen quality management.

⒉Important construction processes: such as foundation and casting must be accepted by Party A before proceeding to the next process.

⒊When Party A discovers that Party B has cut corners during the construction process or acted irresponsibly, affecting the quality of the house, Party A has the right to require Party B to stop work or make rectifications.

⒋If Party A discovers quality problems within one year after the house is built, Party B must repair it free of charge.

3. Payment method

1. Project payment settlement method: Calculated based on the construction area, RMB ____ yuan per square meter.

⒉Payment time: The first payment is within ____ days after the construction starts, the second payment is in ____, the third payment is in ____, and the fourth payment is after the house is completed and inspected by Party A Payment will be made within __________days.

4. Liability for breach of contract

1. If the quality of the project fails to meet the requirements, Party B must repair and redo it; if any loss is caused, Party B shall compensate for it. If the contract cannot be performed due to Party B's reasons, Party B shall bear liquidated damages of __________ yuan and compensate for all losses caused to Party A by its breach of contract.

2. If Party B ignores Party A’s reasonable requirements, or takes measures such as passive slowdown and delay of construction period to embarrass Party A, it will be regarded as a fundamental breach of contract by Party B, and Party A has the right to terminate this contract. Party B shall bear liquidated damages of ??yuan. Rural House Construction Agreement Part 5

Party A:___________

ID card number___________Contact information (mobile phone number)___________Party B:___________

Identity Certificate number___________Contact information (mobile phone number)___________

Party A plans to build a house in Maluqiao Village, Dadu Village Committee, Danfeng Street, Shizong County, and Party B will be responsible for the construction. In order to clarify the rights and obligations of both parties, both parties voluntarily signed this construction contract after equal negotiation.

1. Rights and obligations of both parties

1. Party A is responsible for providing lime, bricks, cement, sand, water, steel and other building materials. According to the construction progress, Party B shall notify Party A in advance to purchase the required materials.

2. Party B has mature experience in rural housing construction and is responsible for the construction and delivery of housing results. The parties make it clear that there is no employment relationship between the two parties.

3. Construction machinery such as mixers and vibrators as well as all labor tools such as formwork and scaffolding shall be brought by Party B and the expenses shall be borne by Party B.

4. The construction period will start from _____________ month ___________ day of ___________ year, and the construction period will be ___________ days.

5. Party B shall strengthen safety education for its personnel, strictly manage, abide by national laws and regulations, and conduct safe construction. Safety incidents caused by the intentional or negligent actions of Party B's personnel are the sole responsibility of Party B and have nothing to do with Party A.

6. Party B is responsible for paying the wages and remuneration of Party B’s personnel and has nothing to do with Party A.

2. Quality Requirements

1. Party B shall adhere to the principle of quality and quantity, construct according to quality and quantity, and according to the agreed construction period, and strengthen quality management.

2. Important construction processes: such as foundation and casting must be accepted by Party A before the next process can be carried out.

3. When Party A discovers that Party B has cut corners or cut corners during the construction process, or has acted irresponsibly and affected the quality of the house, it has the right to require Party B to stop work or make rectifications.

4. If Party A discovers quality problems within one year after the house is completed, Party B must repair it free of charge.

3. Payment method

1. Project settlement method: Calculated based on the building area, all work is contracted, RMB___________ yuan per square meter (uppercase _________ yuan) .

2. Payment time: The first payment is within ___________ days after the construction starts, the second payment is on ___________, the third payment is on ___________, and the fourth payment is after the house is completed. Payment will be made within the day after inspection by Party A.

IV. Liability for breach of contract

1. If the quality of the project fails to meet the requirements, Party B will have to repair and redo it; if any loss is caused, Party B will compensate for it. If the agreement cannot be performed due to Party B's reasons, Party B shall bear liquidated damages of RMB___________ yuan (in capital letters ___________ yuan) and compensate for all losses caused to Party A by its breach of contract.

2. If Party B ignores Party A’s reasonable requirements, or takes measures such as passive slowdown and delay of construction period to embarrass Party A, it will be regarded as a fundamental breach of contract by Party B, and Party A has the right to terminate this contract. Party B shall bear liquidated damages in the amount of RMB___________ yuan (uppercase___________ yuan).

3. In the absence of Party B’s breach of contract, if Party A fails to pay the project price as stipulated in the contract, it shall bear liquidated damages of RMB___________ yuan (in capital letters ___________ yuan).

V. Dispute Resolution

1. When a contract dispute occurs, both parties shall negotiate amicably.

2. If negotiation fails, both parties may submit the dispute to the People's Court for ruling.

VI. Supplementary Provisions

1. This contract is made in two copies, with each party A and Party B holding one copy.

2. This contract shall take effect from the date of signing.

3. Both parties must abide by the above contract.

Party A’s signature: ___________

Party B’s signature: ___________

___________Year___________Month___________Day Rural House Construction Agreement Part 6

p>

Party A: ID number:

Residential address:

Party B: ID number:

Residential address:

In accordance with the relevant provisions of the "Contract Law of the People's Republic of China" and the "General Principles of the People's Republic of China and Civil Law", after friendly negotiation between the two parties, an agreement has been reached regarding Party A's request for Party B to engage in rural homestead house construction work at Party A's place. following protocol.

1. Helping Period

Party B will provide labor services to Party A from day, month, day, month, year, year.

2. Remuneration for helpers

Party A shall pay labor remuneration to Party B in accordance with legal provisions. The salary standard is yuan/day, and the payment period is: (1) Daily cash settlement; ( 2 weeks/monthly settlement.

3. Helping time

Party A will arrange the helping time and notify Party B in advance according to the actual situation

4. Labor. Standards

4.1 Party A ensures the necessary labor protection conditions for Party B’s normal work. It can optionally purchase corresponding insurance for Party B before starting work, and effectively implement the principle of not starting work due to high temperatures or rain;

< p> 4.2 Party B promises to work hard and prevent laziness, work-cutting and material-stealing. 5. Liability for breach of contract

Both parties shall faithfully perform the contents of the agreement in accordance with the contents of the agreement. If one party breaches the contract, it shall pay liquidated damages of RMB 5,000 to the other party in accordance with the law and compensate the non-defaulting party for its actual losses. 6. Termination of the Agreement

6.1 In the event of any of the following circumstances, the non-defaulting party shall. The breaching party may be directly notified to terminate the contract:

1. Party A fails to pay Party B’s helpers in a timely manner as stipulated in the contract;

2. Party A fails to provide Party B with necessary labor protection conditions ;

3. If the labor help provided by Party B fails to meet the project progress requirements

6.2 If either party needs to unilaterally terminate the contract, it shall notify the other party 30 days in advance; or both parties shall negotiate. After agreement, the contract will be terminated directly.

7. Dispute Resolution

If a dispute arises, the two parties should resolve it through negotiation. If the negotiation fails, they can file a lawsuit in the People's Court where the contract was signed.

< p> 8. Others

8.1 This agreement is made in two copies, with Party A and Party B each holding one copy;

8.2 Matters not covered in this agreement shall be agreed upon by both parties orally or in writing;

p>

8.3 This agreement will take effect upon signature by both parties.

Party A (signature): Party B (signature):

Contract signing date: year, month, day

Contract signing place: