How to write a suitable sample of completion acceptance certificate for acceptance opinions
Acceptance is required before the project is completed, and the acceptance standards of each part need to be implemented according to specific regulations. Otherwise, the unqualified project cannot be used, and there will be safety problems. How to write the acceptance opinion? The acceptance opinions need to be summarized after the project acceptance. How to write the sample of the completion acceptance certificate? Let's take a look at these little common sense about project acceptance.

How to write the acceptance opinion properly?

Fill in whether the project meets the design requirements, specifications, project quality and safety requirements. Completion acceptance refers to that after the completion of a construction project, the development and construction unit, together with the design, construction, equipment supply unit and the engineering quality supervision department, conducts a comprehensive inspection on whether the project meets the planning and design requirements and the quality of construction and equipment installation, and obtains qualified materials, data and completion certificates. It should be pointed out that the completion acceptance is based on phased acceptance, and the project that has been completed and accepted will not be re-accepted at the time of completion acceptance.

Sample of completion acceptance certificate

Project completion acceptance is the last working procedure of the whole construction process and the last work of project management. It is a sign that construction investment results are transferred to production or use, and it is also an important link to comprehensively assess investment benefits and test design and construction quality.

With the official seal of the construction unit and the signature of the director of the municipal construction engineering quality supervision station, it is required to fill in the list of acceptance personnel of all parties involved in the construction in detail, including the personnel of the construction (supervision) unit, construction unit and survey and design unit.

1. Submitted by the construction unit to the construction unit to fill in, signed by the responsible unit (construction, supervision, survey, design and construction unit) and stamped with the official seal of the legal entity, sent to the quality supervision station for examination and approval, and copied to the filing department.

2. In the column of acceptance opinions, the contents to be explained include: whether the project has been completed according to the design and contract requirements, whether the use functions of each system have been running normally and meet the requirements of relevant regulations; This paper briefly expounds whether the quality problems in the construction process have been handled, whether the hidden dangers in structure and use function have been found on site, whether the inspectors agree to the acceptance, and whether the engineering technical archives are complete.

The above requirements record the written rectification record of the rectification problems ordered by the quality supervision station, which refers to whether there are other general quality problems in the project that do not involve structural safety and main use functions, whether the rectification has been completed, and issue a certificate of completion acceptance.

1. After the pre-acceptance of the project completion of the supervision unit, the rectification of the construction unit is completed and filled in by the chief supervision engineer.

2. Quality evaluation comments column:

(a) whether the project supervision department is in strict accordance with the construction project supervision norms, supervision contracts, supervision planning and supervision implementation rules to conduct a comprehensive supervision of the project.

(b) Whether the construction quality of foundation and foundation works meets the design and specification requirements;

(c) Whether the construction quality of the main project (including grid, curtain wall, dry hanging stone, underground structure, steel structure, etc.) is qualified. ) comply with the requirements of design and relevant specifications;

(d) Whether the construction quality of water, electricity, HVAC and other installation works meets the design and specification requirements and meets the functional requirements.

3. Clearly evaluate the engineering quality level.

Internal letter of project completion acceptance issued by quality station.

Matters needing attention in the evaluation report:

1. After the pre-acceptance of the project completion of the supervision unit, the rectification of the construction unit is completed and filled in by the chief supervision engineer.

2. Quality evaluation comments column:

(a) whether the project supervision department is in strict accordance with the construction project supervision norms, supervision contracts, supervision planning and supervision implementation rules to conduct a comprehensive supervision of the project.

(b) Whether the construction quality of foundation and foundation works meets the design and specification requirements;

(c) Whether the construction quality of the main project (including grid, curtain wall, dry hanging stone, underground structure, steel structure, etc.) is qualified. ) comply with the requirements of design and relevant specifications;

(e) Whether the construction quality of water, electricity, HVAC and other installation works meets the design and specification requirements and meets the functional requirements.

3. Clearly evaluate the engineering quality level.

Note: The evaluation report and forms are made by the supervision unit or the construction unit, but the contents of the report must include the above precautions.

1. When the planning department examines and approves the documents, it is usually required to provide the project planning permit (copy), but the original must be verified. Copy and official seal of the construction unit indicate the original storage location.

2. Provide a copy of the construction permit of the project and submit the original for verification. Copy and official seal of the construction unit indicate the original storage location.

3. The approval document of the public security fire department, with the original design of fire control requirements, namely the fire control acceptance opinions of the construction project.

4. The original design documents with environmental protection requirements approved by the environmental protection department, that is, the Environmental Impact Report Form of Suzhou Construction Project issued by the Environmental Protection Bureau of our city.

5 construction drawing design documents review report, and provide the original according to the relevant provisions.

6. Special acceptance opinions of construction project archives, namely the receiving contact list of construction project archives provided by urban construction archives (original).

The above content introduces how to write the acceptance opinions, including many questions, such as whether the project meets the design requirements and the specifications. At the same time, quality and safety issues are key issues to be considered during acceptance. The model of the completion acceptance certificate introduces the specific writing method for everyone, and you can refer to it more.