Current location - Quotes Website - Signature design - What do you mean by the intersection of earthwork and pile?
What do you mean by the intersection of earthwork and pile?
The intersection of earthwork and pile is that Party A gives the coordinate control points released by the Planning Bureau to the construction unit, and the construction unit releases the coordinate points of the building according to the corresponding relationship between coordinates and building coordinates. Party A or the Planning Institute will hand over the coordinate control points, elevation or red line position to the constructor for sample placement.

The construction unit asked the Survey Brigade of the Planning Bureau to put the building to be built on the construction site. The main task of the construction unit is to contact points and record the relationship between each point and the total leveling point in detail, or the control points and elevations of the external network.

introduce

Pile delivery means handing over the coordinate points required in the drawings to Party B, and the plane and elevation coordinates of Party B's future construction will be based on these coordinate points. Pile is a symbol of mileage, number of sections and coordinates in water conservancy and highway engineering.

Lines-electricity, pipelines, highways, waterways, railways, etc. ; Handover-handover, delivery and handover; Pile-pile number; Line piling is to hand over the specific pile number (technical index) of this area (location) to the next unit.