20 19 supervisor's personal annual work summary (I) 20 19 is about to make history. In retrospect, I can't help feeling deeply. In this year, with the careful care of the leaders of the project supervision department of the company and the help of my colleagues, I have made great progress in all aspects through my own efforts and can better complete my work. I do my duty and work hard. In order to sum up experience, reflect on our own shortcomings, improve our own supervision business level, and become a better and faster development member of the company, the supervision work this year is summarized as follows:
First, obey the leadership arrangement and earnestly perform their duties.
1. After receiving all kinds of materials and documents issued by superiors, register and file them in time and distribute them to relevant units or individuals.
2. Complete the transmission of engineering data on time. After receiving all kinds of data reported by the construction unit, classify and conduct preliminary examination in time, and distribute the qualified data to the project leader and various professional supervision engineers for signature in time; For unqualified materials, return them to the construction unit in time and ask them to supplement, modify and improve, and then report to the supervision department again, and handle the documents according to the procedures; All the documents sent and received were registered and a complete ledger was established.
3. Complete the word processing work of the supervision department, sort out the meeting minutes, and participate in the preparation of the monthly supervision report and detailed rules.
4. Assist the supervision engineer to the site for acceptance of each working procedure. If it does not meet the design and specification requirements, urge the on-site construction personnel to make timely rectification and relevant acceptance work.
The second is to standardize their own words and deeds and improve the management level of on-site projects.
The director of the project department arranged for me to go to the site supervision and an engineer with excellent professional knowledge to take me. Mainly to cooperate and assist civil engineers to supervise the construction process, project acceptance and be responsible for standby. When I first arrived at the construction site, I actively contacted the owner, communicated with the construction unit, carefully studied the relevant specifications and requirements, and checked the engineering drawings. Under the careful guidance of professional supervision engineers, I gradually became familiar with the relevant regulations and requirements of some design drawings.
In the concrete pouring construction of civil engineering, the key parts of the project involve multiple processes, and once neglected, it may cause engineering quality accidents. Therefore, in the side station construction, we should strengthen monitoring, strictly supervise the construction of all parts, and strengthen the control of the construction process, requiring the construction unit to carry out the construction in strict accordance with the design requirements, construction plan and acceptance specifications to ensure the engineering quality. Supervision record is an indispensable part of engineering supervision. During the on-site inspection and parallel inspection, I made detailed records every day, with complete supervision logs and on-site records.
In the process of station construction, it is necessary to make clear the design requirements and actual spot check results of pouring component parts, concrete grade strength and concrete mixing method, whether the management personnel of the construction unit are in place, the reserve status of construction machinery and raw materials, the start and end time of pouring, the concrete volume, the number of concrete test blocks and slump. During the construction of key parts of the project, arrive at the site in advance, check the construction preparation, supervise the whole process, and make a written site record in time and truly; Do a good job in daily supervision and inspection of each construction process. Notify the construction unit or supervision engineer in time when problems are found and report to the director in time. And urge the construction unit to carry out rectification and acceptance again. In the construction site, due to the lack of professional knowledge and work experience, although I encountered many problems, I still stick to my post, do my job well, learn with an open mind, gradually improve myself, and constantly improve the management level of the enterprise.
Third, strengthen daily study and strive to improve professional quality.
Professional quality is the basic condition for supervisors to perform their duties. As a young supervisor, I love my major, I am often familiar with the atlas of norms and standards, read a lot of books related to my major, and am keen on accumulating work experience.
Fourth, perform your duties wholeheartedly and be a competent employee wholeheartedly.
As a supervisor, there is no right to seek benefits and enjoy treatment, only the obligation to take responsibility and take the lead. In the usual work, complete the work assigned by the leaders with good quality and quantity; I can also treat my work with a positive attitude and work hard to finish it, so as not to be offside, not in place, and not dereliction of duty. Always adhere to the standards of qualified supervisors and love their work; Have a good work style and hard-working spirit; Strict working attitude and correct ideology and morality; Abide by the rules and regulations of the enterprise; Obey the organization and distribution, and earnestly complete the tasks assigned by the supervision department. At work, I can set high standards for myself, strictly perform my duties, deal with problems according to the situation and report to the leaders in time. In my daily life, I can respect my leaders, unite my colleagues and help my colleagues who have difficulties to solve problems in life and work.
Problems with verbs (abbreviation of verb)
1. When the site is busy, the supervision data is neglected, resulting in nowhere to find the documents.
2. The supervision logs and materials are not standardized.
Sixth, the direction of future efforts.
1. Strengthen the cultivation of team consciousness and enhance internal cohesion.
2. Constantly strengthen self-study, improve professional and technical capabilities, and strictly abide by the company's internal management system.
3. Improve the consciousness of standardization of supervision data, and strictly control the important parts of each working procedure.
4. Watch six ways, watch six ways, speak less layman's words, respect the technical personnel of the construction party, and establish the image of supervision.
5. Abide by the company's various management systems, assist the engineer to do a good job, under the guidance of the supervision engineer, check the construction situation of each part in detail, try to control in advance, and be good at finding problems. Once you find signs of problems, stop immediately to avoid them. Report the problems that cannot be handled to the supervision engineer in time. Unite colleagues, love my job, have a good work style and hard-working spirit, have a correct work attitude and abide by the company's various management systems. Strictly abide by the "eight noes" supervision. Strictly perform duties in daily work, and earnestly complete all the work assigned by the leaders.
In short, as a supervisor, we should work in strict accordance with national standards and design drawings, study hard in our work, constantly sum up experience and learn lessons. Really integrate theory with practice and contribute to the management of the company. Strive to raise their professional and technical level to a new level.
20 19 supervisor's personal annual work summary (2) how time flies. I have been working for several years before I know it. Looking back on my work in recent years, I will calm down, sum up my achievements and gains, and find out the shortcomings and mistakes in my work, so as to make persistent efforts or learn lessons and sum up experience in my future work. The following is a summary of my work:
First, assist in information collection.
In practical work, data collection and management is a very trivial work, especially in the case that the information provided by the construction unit is not timely and incomplete, it is the responsibility of every supervisor to urge the construction unit to improve the construction information and report it to the supervision department.
In order to write the meeting minutes more comprehensively, the meeting minutes should be carefully kept when attending the supervision meeting. Meeting minutes are the incisive exposition and high generalization of meeting contents, which are higher than meeting minutes. This involves the transformation of oral terms into professional terms and must be comprehensively summarized. Therefore, doing a good job in meeting minutes is more conducive to the incisive discussion and comprehensive summary of meeting minutes.
Most of the data in the monthly supervision report comes from the actual situation in all aspects of the month of construction, including: the dynamic situation of various workers, materials and machinery during the progress of the project; Quality acceptance of inspection lot and partial project acceptance of engineering quality; In terms of safety and civilization, the problems existing in the construction safety in that month and the measures and pre-control measures taken in view of the existing problems. Before making the monthly report, I will carefully summarize the actual situation of the month and give it back to the librarian. Only in this way can the monthly supervision report reflect the actual situation of the project more accurately.
Second, the quality control of engineering construction
Do enough pre-control work. Be familiar with the engineering drawings, understand the design intent, and understand the main technological process and engineering characteristics of the construction process, so as to plan ahead in various acceptance processes, find and correct the problems existing in the project in time, especially the overall concept of the project. Only by comparing the construction drawing and structural drawing in many aspects can we fully grasp the construction state, make fewer or no mistakes, and really do a good job in pre-control.
Work done in process control. For all incoming materials and semi-finished products, etc. In addition to checking the relevant inspection data submitted by the construction party against the standards and design requirements, I also carry out necessary appearance inspection on the appearance quality of the materials when they enter the site. If the appearance quality does not meet the requirements, it is forbidden to be used in the project.
For the construction of key parts of the project, it is necessary to arrive at the station in advance, check the construction preparation work, and make a written record of the station in a timely and complete manner; Do a good job in daily patrol, inspection and inspection of each process of general construction. Inform the project management department of the construction unit of the problems found in the patrol, inspection and inspection in the construction process orally or in writing, report to the director's representative in time, urge the construction unit to carry out rectification and review, do its best to do a good job in quality control before and during construction, and do its due diligence.
Three, safety and civilized construction control work
In the process of safety management, I deeply realized that prevention is the key to safety, that is, work should be done first, because accidents are unpredictable but preventable. Establish a sound inspection system, find hidden dangers and make timely rectification. The supervisor has an unshirkable responsibility for the safety of the construction site. In addition to daily safety inspection, supervision and management (filing relevant data records), I insist on daily safety education, technical job safety technical education and post safety technical disclosure inspection for the safety management personnel of the construction unit, conduct a comprehensive inspection on the site construction safety status regularly or irregularly every month, file safety inspection records, and organize a safety inspection every quarter.
In view of the company's requirements for engineering safety control, the supervision and management were strengthened, and the rectification notice was issued in time for the existing problems, requiring the construction unit to carry out rectification, and urging the rectification and re-inspection in time.
In a word, my experience is that we must implement the "four diligence" system for the specific work practice of quality control in the process of engineering construction supervision, especially for the control of safe and civilized production: be diligent in work and be able to find problems in advance; Hard-working, mostly turning, patrolling and checking at the scene; Diligent, talk about the problems found; Diligent, make relevant records in time, and send a written notice to the supervision engineer. Only by strengthening the inspection work and strengthening the control in the process can we better ensure the safe production of the project.
20 19 summary of supervisors' personal annual work (iii) in the past year, with the wise entrustment, trust and correct support of the leaders of xx Group, with the help of the company leaders and with the concerted efforts of Qi Xin, the supervisory department personnel, the corresponding supervisory tasks have basically been successfully completed. Now this year's construction supervision work is briefly summarized as follows.
I. Overview of the Project
According to the supervision scope and control objectives stipulated in the supervision contract, and considering the age level and professional level of the supervisors, the director will take the lead and other members will actively cooperate to carry out the supervision of the archives project in xx city. According to the requirements of supervision planning rules, the project department, under the auspices of the chief supervision engineer, established the supervision regular meeting system, post responsibility system for supervisors, on-site supervision system, file management system and handover system, and published all the systems on the wall to urge all members to work hard and do their duty for the company.
Second, the working methods and principles of the supervision department
The chief supervision engineer requires all professional supervision engineers to proceed from the reality of engineering construction projects and implement relevant policies as the principle, strictly fulfill the entrusted supervision contract of construction projects and conscientiously implement relevant standards and regulations. With high quality of engineering construction, reasonable investment, fast progress and ensuring safety as the control goal. Take "law-abiding, honesty, justice and science" as the industry standard. Carry out supervision work in an all-round way by means of prior guidance, in-process inspection and after-the-fact acceptance.
All supervision engineers strictly exercise the rights entrusted by the Construction Project Entrusted Supervision Contract in their work, and strictly supervise according to law with excellent business knowledge, pragmatic and dedicated spirit, meticulous scientific attitude and fair and honest work style. In the work, the internal management of supervision is constantly strengthened, and the work experience is actively explored and summarized, so that the supervision work reflects its own scientificity and fairness.
In terms of owner's service, the supervision department will try its best to meet the owner's requirements within the supervision scope stipulated in the supervision contract, and strive to be the owner's staff and agent. In the management of contractors, the principle of combining "management" with "supervision, assistance and promotion" is adopted to carry out the work, and at the same time, the contractor is urged to implement total quality management to promote the level of engineering construction supervision to a new level.
Third, the project quality control
1. Implement quality control throughout the whole process of project construction and the concept of quality first throughout every link of the whole process of project construction. The project supervision engineer adheres to the principle of quality control in the whole process, and not only checks the quality of products, but also checks the quality of work, process and intermediate products. It is necessary to control not only the quality acceptance of molded products, but also the engineering quality before and during construction.
2. Check and accept the project quality according to the design drawings, current construction specifications and quality evaluation standards, and the measured data shall prevail. Adhere to people-centered quality control in the whole process of quality control. Adhere to the supervision mode of "strict control, active participation and enthusiastic service".
Four. Suggestions for future development
Market is the source of enterprise survival, and talent is the key to enterprise development. The competition between enterprises ultimately depends on the competition of talents. It is not easy for an enterprise to train people, and it is even more difficult to train a talent. Once the enterprise loses a large number of talents, it will directly affect the rise and fall of the enterprise. Supervision is a highly intelligent and scientific paid technical service. As a supervision unit, we should clearly realize that high-intelligence compound talents with great potential are the most precious wealth and source for the survival and development of enterprises.
Establish a talent management system to improve employees' sense of competition. Based on the long-term, strengthen the talent pool and attach importance to the introduction and stability of excellent supervision talents. In order to form an incentive mechanism, improve the "Measures for the Assessment of Supervisors", reward the excellent and punish the poor, and highlight the backbone role. In terms of employing people, we should follow the principle of "those who are capable are superior, those who are equal are inferior, and those who are mediocre are inferior" and use talents in an eclectic way. Establish an effective performance evaluation system. Strengthen the training of supervisors.
With the vigorous development of construction and the constant standardization of supervision work, our project department will continue to implement "Excellence in Industry" in the next stage. Due to various objective reasons, we still have many shortcomings. In the new year, we will make persistent efforts to create a better tomorrow for the regulatory authorities! Be a self-disciplined supervisor, make further efforts to improve the level of supervision, enhance the comprehensive strength of supervision departments, and contribute to the growth and prosperity of the company.
20 19 supervisor's personal annual work summary (iv) 20 19 is coming to an end. Looking back on the work in 20 19 years, there are fruitful joys, difficulties in tackling key problems with colleagues, and melancholy when encountering difficulties. Time flies, unconsciously, the promising xx year is coming, and now it is important.
First, the main work content of an individual for one year
During this year, I mainly participated in the first phase project of xxx Customs, the general survey of xx underground pipelines, the repair project of xx wharf yard, the displacement observation of the complex building and the measurement of several projects of the company.
Second, perform job responsibilities
In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit.
In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and strive to be the best. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.
In terms of engineering data, supervision diaries are written every day according to the site conditions, and the site records and other data of that day are sorted and filed, and the construction unit is urged to report the corresponding engineering data. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.
Third, work experience, feelings and shortcomings
Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge. In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.
Four. Personal career development opinions and views on the company next year.
Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.